HomeMy WebLinkAboutEngineering Dept Ltr 04-15-11IL Y Ctl Q= in
h rt
April 15, 2011 JAMES BRAINARD, MAYOR
Mr. John C. Hart, Jr.
President
J.C. Hart Company, Inc.
805 City Center Drive, 4120
Carmel, IN 46032
RE: 116th Street Centre Apartment Homes
Mr. Hart,
The Department of Engineering has reviewed the latest construction plans for the site /civil
aspects of this development and has no further comments. The Department is in a position to
approve the plans and release them for construction when the following items have been
provided:
1. Performance Surety is provided for the installation of the improvements within the public
right -of -way, portions of the water supply system that will be dedicated to the City, the
on -site construction phase erosion and sediment control measures and the post
construction water quality best management practices.
2. That right-of-way stipulated by the City's 20 -Year Thoroughfare Plan is dedicated to the
City.
3. Payment of any connection and availability fees to the City's water utility.
Please contact me at (317) 571 -2441 if you have any questions.
E:Ishare&Non- current employee roldersOMIRPRO.IREV111 11GT ITSTREETCEN'IREAPART'MENI'I- IOMESC ON I)rrIONALAPPROVAL.doe
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAx 317.571.2439
EMAIL engineering @carmel.in.gov
Sincerely,