Loading...
HomeMy WebLinkAboutEngineering Dept Ltr 04-15-11IL Y Ctl Q= in h rt April 15, 2011 JAMES BRAINARD, MAYOR Mr. John C. Hart, Jr. President J.C. Hart Company, Inc. 805 City Center Drive, 4120 Carmel, IN 46032 RE: 116th Street Centre Apartment Homes Mr. Hart, The Department of Engineering has reviewed the latest construction plans for the site /civil aspects of this development and has no further comments. The Department is in a position to approve the plans and release them for construction when the following items have been provided: 1. Performance Surety is provided for the installation of the improvements within the public right -of -way, portions of the water supply system that will be dedicated to the City, the on -site construction phase erosion and sediment control measures and the post construction water quality best management practices. 2. That right-of-way stipulated by the City's 20 -Year Thoroughfare Plan is dedicated to the City. 3. Payment of any connection and availability fees to the City's water utility. Please contact me at (317) 571 -2441 if you have any questions. E:Ishare&Non- current employee roldersOMIRPRO.IREV111 11GT ITSTREETCEN'IREAPART'MENI'I- IOMESC ON I)rrIONALAPPROVAL.doe DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAx 317.571.2439 EMAIL engineering @carmel.in.gov Sincerely,