Loading...
HomeMy WebLinkAboutUSI Consulants/Addl Serv/ENG/ $35,100 Eng,nee, mg 2011 App, op, iaflon 11206 R509 206 R4462705 P 0 #2751 1 Contract.Ndt T6.Exceed S35,100:00 490 ADDITIONAL:SERVICES ;AMENDMENTIO AGREEMENTFOR PURCHASE OFGOODSANIISERVICES THIS AMENDMENT TO THE GObDS'AND:'SERVICES, AGREEMENT("AgreeMept") entered into by and between the Qity..of Carmel and'illgl as City Cbritractl 040419.05 Shaft arnend.lhe:letm's of the. Agreement by :adding the ,additiOnal 'services' to be provided by Venddf.'consiSterit With the SOO; of' VV.Ofk attached hereto': and incorporated' herein :as 'Exhibit 'An. The terms and conditions of the -Agreerbeht.Shall rbt citherwisabaaffected and:Ishalf;remainin'firiffortaandeffedi". IN WITNESS theTartiea_heret011avaniade.and executed thiSArnehdrifenfes.1011o0i .cITY USICONSULTANTS tiyand througPitslioaroldf Ptibk WOrkSa nd. Safely By: NiDT APS/212 JaMes'Brainard; Officer Authorized Date: /01W11 6 PrintedName ry An :Urike, Megib Date S faee-cs'5140aFA-/ Title A. S. Wjts „Mantel' FID/TIN: 3.$ I 31. •2-9' "g'g "Date: 57 g LaStfourof-StNif'SOlaPreptietor: ATTEST:: Date: /44" 2 2-:Q1/ Ali D iana cordray; erk,Treasurer Date: (ZWIsialTiof..5% &GOC4 S.AEointsrut020)14./SICo.shanis AM Svc, do..:4/1/ 4011 10.09 AM1 a fi .21 I 0 111 CITY* :1EL April 25, 201 1 JAMES BRAINARD, MAYOR Mr. Greg R. Wendling, P.E. USI Consultants 8415 E. 56 Street, Suite A Indianapolis, IN 46216 RE: Additional Service Amendment #1, P.O. #27511 Dear Mr. Wendling: As we discussed, the City of Carmel has a need for additional professional services and pursuant to our current contract with USI Consultants, Contract #040410.05 dated April 4. 2010, I have requested and received from you the proposed scope of services and fee estimates for the following work task: Additional Service Amendment #1— Northwood Hills Westwood Drive Bridge Replacement Design; Preliminary Engineering See "Attachment A" Not to Exceed: $35,100.00 Per our contract procedural requirements, I hereby approve these Additional Professional Services estimates, and request that the Board of Public Works ratify the above referenced Contract Amendment. PLEASE NOTE Please be advised that "Additional Services" performed on City contracts must be billed separately from the original contract and other additional services. More importantly, the invoice must reference the appropriate Additional Service and P.O. shown above. Invoices received without the Additional Service referenced will be returned for proper identification. Thank you for your continued assistance in providing the City of Cannel with your professional, quality services. If you should have any questions, please give me a call. Sincerely, Michael T. McBride, P.E. City Engineer -viewed and appr ved by: S. C. En _elking Director of Administration DEPARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 F.'x 317.571.2439 EMAIL engineeringncarmel.in.gov USI CONSULTANTS INC. FEE JUSTIFICATION EXHIBIT FEE SUMMARY LOCALLY FUNDED BRIDGE DESIGN Project No Northwood Hills Subdivision Owner: City of Carmel Description:IWestwood Drive over Mitchener Ditch File Name:IS: \201 1 Proj \201 1 -XXX \City of Carmel Northwood Hills Westwood Dr Bridge Design Fee Just March 201 1.xls Preliminary Plans Direct Salary Cost 15,309.76 Final Plans Bid Documents Direct Salary Cost $19,158.09 Direct Non -Salary Cost $596.00 SUB -TOTAL $35,063.85 USE TOTAL PRELIMINARY ENGINEERING FEE $35,100.00 Part -Time Constr. Mngmt. Direct Salary Cost $11,801.12 Part -Time Constr. Mngmt. Direct Non -Salary Cost $454.00 SUB -TOTAL $12,255.12 USE TOTAL PART -TIME CONSTR. MNGMT. FEE $12,300.00 Exhibit At d8 Z March 2011 USI Consultants, Inc. Summary Page