HomeMy WebLinkAbout197137 05/11/2011 CITY OF CARMEL, INDIANA VENDOR: 068025 Page 1 of 1
ONE CIVIC SQUARE CROSSROAD ENGINEERS, PC CHECK AMOUNT: $7,706.40
CARMEL, INDIANA 46032 3417 S SHERMAN DR
4 oN BEECH GROVE IN 46107 CHECK NUMBER: 197137
CHECK DATE: 5/11/2011
DEPARTMEN ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DE SCRIPTION
206 R4340100 11241 622.40 ENC ENGINEERING FEES
2200 4340100 11241 366.64 ENC ENGINEERING FEES
206 R4340100 27437 11241 483.46 ASA #11 -ON CALL REVIE
202 R4350900 27493 11242 220.00 ASA 21 /CONST INSPCT 7
206 R4340100 21824 11243 1,250.00 HAVERSTICE DRAINAGE I
206 R4340100 21791 11244 625.00 HAVERSTICK DRAINAGE P
203 R4462200 21810 11247 464.24 106TH PATH CONS INSPE
211 4340100 27500 11247 943.96 ASA #23 /106TH PATH CI
1205 R4462862 21816 11250 1,391.50 CONST INSP -HAZEL DELL
2200 R4340100 21808 11251 1,339.20 HAZEL DELL ARPA PROJE
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317 -780 -1555
City of Carmel Invoice number 11244
Gary Duncan Date 05/0412011
One Civic Square
Carmel, IN 46032 Project HAVERSTICK DRAINAGE
IMPROVEMENTS
For services performed April 2 through April 29, 2011
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and
Additional Services #3:
Cz e�i a
P.O. #21791 Z�d
Amount
Haverstick Coachman Survey
Contract Amount 5,500.00
Percent Complete 100.00
Total 5,500.00
Billed
Current Billed 0.00
Haverstick Coachman Design Permitting
Contract Amount 12,500.00
Percent Complete 100.00
Total 12,50&00
Billed
Current Billed 0.00
Haverstick Coachman Bidding
Contract Amount 2,000.00
Percent Complete 100.00
Total 2,000.00 3 4 G
Billed
Current Billie d�a �O, 0.00
Haverstick Coachman Construction Administration
Contract Amount 4,000.00 co Alr,, cy
Percent Complete 100.00 ,17
Total 4,000.00
Billed
Current Billed 0.00
�glz4� 6b$
City of Carmel Invoice number 11244 Invoice dale 0510412011
Page 1 of 3
City of Carmel Invoice number 11244
Project HAVERSTICK DRAINAGE IMPROVEMENTS Date 05/04/2011
Amount
Lexington Lane Survey
Contract Amount 2,000.00
Percent Complete 100.00
Total 2,000.00
Billed
Current Billed 0.00
Lexington Lane Design Permitting
Contract Amount 5,000.00
Percent Complete 100.00
Total 5,000.00
Billed
Current Billed 0.00
Lexington Lane Bidding
Contract Amount 1,000.00
Percent Complete 100.00
Total 1,000.00
Billed
Current Billed 0.00
Lexington Lane Construction Adminstration
Contract Amount 2,500.00
Percent Complete 100.00
Total 2,500.00
Billed
Current Billed 0.00
106th St at 106th Place Survey
Contract Amount 2,000.00
Percent Complete 100.00
Total 2,000.00
Billed
Current Billed 0.00
106th St at 106th Place Design Permitting
Contract Amount 5,000.00
Percent Complete 100.00
Total 5,000.00
Billed
Current Billed 0.00
106th St at 106th Place Bidding
Contract Amount 1,000.00
Percent Complete 100.00
Total 1,000.00
Billed
Current Billed 0.00
106th St at 106th Place Construction Administration
Contract Amount 2,500.00
Percent Complete 75.00
Total 1,875.00
Billed
Current Billed 625.00
Total 625.00
City of Carmel Invoice number 11244 Invoice date 0510412011
Page 2 of 3
City of Carmel Invoice number 11244
Project HAVERSTICK DRAINAGE IMPROVEMENTS Dale 05104/2011
Invoice total 625.00
Thank You1
Chi ha t
President
City of Carmel Invoice number 11244 Invoice date O5104 /2011
Page 3 of 3
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317- 780 -1555
City of Carmel Invoice number 11251
Michael McBride, City Engineer Date 05/04/2011
1 Civic Square
Carmel, IN 46032 Project HAZEL DELL PARKWAY
IMPROVEMENTS
For services performed April 2 through April 29, 2011
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our LPA- Consulting contract dated March 17, 2010:
Des No.: 0901163 2 \C6 0%
ARRA Inspection
Professional Fees
Billed
Hours Rate Am ou n t
Director 4.00 143.76 575.04
Resident Project Representative 12.00 61.98 743.76
Reimbursables
Billed
Units Rate Am ou n t
Miles 51.00 0.40 20.40
Phase subtotal 1,339.20
Invoice total 1,339.20
Thank ou!
C
Chi (3hL V
President
City of Carmel Invoice number 11251 Invoice date 05104/2011
Page 1
Hazel Dell Parkway Improvements
ARRA Inspection
Date Range from: 4/2/2011 to.4/29/2011 Work In Progress
Emp To tal Billed WIP Total Billable Deferred Hold Non Billable Writeoff
Andrew J. Wolf 12.00 12.00
Billable Time 12.00 12.00
Date Total Billed WIP Total Billable Deferred Hold Non Billable Writeoff
4/22/2011 2.00 2.00
4/28/2011 8.00 8.00
4/29/2011 2.00 2.00
Trent E. Newport 4.00 4.00
Billable Time 4.00 4.00
Date Total Billed WIP Total Bill Deferred Hold Non Billable Writeoff
4/25/2011 1.00 1.00
4/27/2011 1.00 1.00
4/28/2011 1.00 1.00
4/2 1.00 1.00
Total 16.00 16.00
Hazel Deli Parkway ARRA Inspection M ileage Report
I
A RR Inspection 51.0 20.40
04/28111 Hazel Dell Parkway Improvem Mileage 41.00 16.40
04/29/11 Hazel Dell Parkway Improvem Mileage 10.00 4.00
51.00 20.40
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317 -780 -1555
City of Carmel Invoice number 11250
Michael McBride, City Engineer Date 05/04/2011
1 Civic Square
Carmel, IN 46032 Project HAZEL DELL PARKWAY
IMPROVEMENTS
For services performed April 2 through April 29, 2011
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and
Additional Services 9
PO #21816 ,c
Local Inspection
Professional Fees
Billed
Hours Rate Amount
Resident Project Engineer 12.00 100.00 1,200.00
Survey Manager 0.50 95.00 47.50
Crew Chief 1.50 80.00 120.00
Reimbursables
Billed
Units Rate Amount
Miles 50.00 0.48 24.00
Phase subtotal 1,391.50
Invoice total 1,391.50
Thank You!
Chip Charles
President
City of Carmel Invoice number 11250 Invoice date 05104/2011
Page i
U"
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317 780 -1555
City of Carmel Invoice number 11241
Michael McBride, City Engineer Date 05/04/2011
1 Civic Square
Carmel, IN 46032 Project CITY OF CARMEL ON CALL PLAN
REVIEW
For services performed April 2 through April 29, 2011
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract #0319.97.02 dated March 19, 1997 including the
Additional Services Amendment #11 P.O. #27437: CWOAOb
General Plan Review �qO\
Professional Fees
�O Billed
Hours Rate Amount
Senior Project Manager 1.00 115.00 115.00
116th Centre Apartments
Professional Fees
Billed
Hours Rate Amount
Senior Project Manager 1.50 115.00 172.50
Project Engineer 9.50 85.00 807.50
Phase subtotal 980.00
Walnut Creek Drive Extension
Professional Fees
Billed
Hours Rate Amount
Senior Project Manager 0.50 115.00 57.50
Penn Circle
Professional Fees
701,x` Billed
r Hours Rate Amount
IZA Project Engineer M t 2.00 85.00 170.00
Regions Bank
Professional Fees 0o
.a
Billed
Hours Rate Am ou n t
Assistant Project Engineer C8 9Z j Z ivZv' 2.00 75.00 150.00
Invoice total 1,472.50
City of Carmel Invoice number 11241 Invoice date 05/04/2011
Page 1 of 2
City of Carmel Invoice number 11241
P roject CITY OF CARMEL ON C PLAN R Date 05104/2011
Thank You!
i
C i r e P. t
President
City of Carmel Invoice number 11241 Invoice date 0510412011
Page 2 of 2
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317 -780 -1555
City of Carmel Invoice number 11242
Michael McBride, City Engineer Date 05/04/2011
1 Civic Square
Carmel, IN 46032 Project PARCEL 7A STREETSCAPE,
LANDSCAPE, OTHER SITE
IMPROVEMENTS
For services performed April 2 through April 29, 2011
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract #0319.97.02 dated March 19, 1997 including the
Additional Services Amendment #21 P.O. #27493
Inspection �p'L
Professional Fees
Billed
Hours Rate Amount
Director 1.00 130.00 130.00
Asst. Resident Project Engineer 1.00 90.00 90.00
Phase subtotal 220.00
Invoice total 220.00
Than Y.0 U!
c
C 'p a s, P. E. f 0 �7
President
J
cn M u
c*1
,i iY ENG. ii i LL-.i �v
41 zEZZZ�.z °ti
City of Carmel Invoice number 11242 Invoice date 05/0412011
Page 1
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317 -780 -1555
City of Carmel Invoice number 11247
Michael McBride, City Engineer Date 05/04/2011
1 Civic Square
Carmel, IN 46032 Project 106TH STREET PATH KEYSTONE TO
WESTFIELD
For services performed April 2 through April 29, 2011
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract #03.03.10.03 approved March 3, 2010 and
Additional Services 6:
PO #21810 P.O. #27500: A 0
Inspection
Professional Fees
Billed
Hours Rate Amount
Director 1.50 130.00 195.00
Assistant Project Inspector 18.00 65.00 1,170.00
Reimbursables
Billed
Units Rate Amount
Miles 90.00 0.48 43.20
Phase subtotal 1,408.20
Invoice total 1
'S&5�s7jR 01
Thank Ylou!
P
Chip C ar, E.
President
City of Carmel Invoice number 11247 Invoice date 05/04/2011
Page 1
Q
CrossRoad Engineers, PC
3417 Sherman Drive
Beech Grove, IN 46107
317- 780 -1555
City of Carmel Invoice number 11243
Gary Duncan Date 05/04/2011
One Civic Square
Carmel, IN 46032 Project HAVERSTICK DRAINAGE
IMPROVEMENTS
For services performed April 2 through April 29, 2011
PROMPT PAYMENT OF INVOICE IS APPRECIATED!!
These services were provided in accordance with our contract #0319.97.02 dated March 19, 1997 including the
Additional Services Amendment #10 P.0.#211824:
Amount
Lakeshore Drive East Lakeview Drive Survey
Contract Amount 2,000.00
Percent Complete 100.00
Total 2,000.00
Billed
Current Billed 0.00
Lakeshore Drive East Lakeview Drive Design/Permitting
Contract Amount 5,000.00
Percent Complete 100.00
Total 5,000.00
Billed
Current Billed 0.00
Lakeshore Drive East Lakeview Drive Bidding
Contract Amount 1,000.00
Percent Complete 100.00
Total 1,000.00
Billed
Current Billed 0.00
Lakeshore Drive East Lakeview Drive Construction Admin.
ContractAmount 2,500.00
Percent Complete 75.00
tal X,875.00
1
To
Binle`d
(U! Current Billed 625.00
tn
�i
City of Carmel Invoice number 11243 Invoice date 05/04/2011
Page 1 of 3
City of Carmel Invoice number 11243
Project HAVERSTICK DRAIN IMPROVEMEN Date 05104/2011
Amount
Stratford Place N. of 106th Street Survey
Contract Amount 2,000.00
Percent Complete 100.00
Total 2,000.00
Billed
Current Billed 0.00
Stratford Place N. of 106th Street Design /Permitting
Contract Amount 5,000.00
Percent Complete 100.00
Total 5,000.00
Billed
Current Billed 0.00
Stratford Place N. of 106th Street Bidding
Contract Amount 1,000.00
Percent Complete 100.00
Total 1,000.00
Billed
Current Billed 0.00
Stratford Place N. of 106th Street Construction Admin.
Contract Amount 2,500.00
Percent Complete 30.00
Total 750.00
Billed
Current Billed 0.00
106th Place N. of 106th Street Survey
Contract Amount 2,000.00
Percent Complete 100.00
Total 2,000.00
Billed
Current Billed 0.00
106th Place N. of 106th Street Design /Permitting
Contract Amount 5,000.00
Percent Complete 100.00
Total 5,000.00
Billed
Current Billed 0.00
106th Place N. of 106th Street Bidding
Contract Amount 1,000.00
Percent Complete 100.00
Total 1,000.00
Billed
Current Billed 0.00
106th Place N. of 106th Street Construction Admin.
Contract Amount 2,500.00
Percent Complete 75.00
Total 1,875.00
Billed
Current Billed 625.00
Total 1,2 50.00
City of Carmel Invoice number 11243 Invoice date 05104/2011
Page 2 of 3
City of Carmel Invoice number 11243
Project HAVERSTICK DRAINAGE IMPROVEMENTS Date 05/0412011
Invoice total 1
Than You!
Y
Chi Charl
President
City of Carmel Invoice number 11243 Invoice date 0510412011
Page 3 of 3
Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995)
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Crossroad Engineers
Purchase Order No.
3417 S. Sherman Dr.
Terms
Beech Grove, IN 46107
Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or biII(s))
514111 11244 Haverstick Drainage Improvements Design $625.00
5/4/11 11251 Hazel Dell ARRA portion; Inspection $1,339.20
5/4/11 11250 Hazel Dell Local portion; Inspection $1,391.50
5/4/11 11241 On Call Plan Review $1,472.50
5/4/11 11242 Parcel 7A Streetscape; Inspection $220.00
514/11 11247 106th St. Path Keystone to Westfield $1,408.20
4 1 243 Haverstick Drainage Inspection $1,250.00
Total
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20 $7,706.40
Clerk- Treasurer
VOUCHER NO. WARRANT NO.
ALLOWED 20
Crossroad Engineers IN SUM OF
3417 S. Sherman Dr
Beech Grove, IN 46107
$7,706.40
ON ACCOUNT OF APPROPRIATION FOR
Department of Engineering
Board Members
PO# or INVOICE No. ACCT /TITLE AMOUNT I hereby certify that the attached invoice(s), or
21 Rog 11251 2200 R404 1,339.2c) bill(s) is (are) true and correct and that the
21816k 11 2 25 0 1205-R4462862 1 291 510 materials or services itemized thereon for
1 -941 which charge is made were ordered and
2Z 1 J 0 J 1241 201-r401 received except
2749W 11242 202 -r509 $220.00
21810 k 11247 203- r4462200 $464.24
27500 11247 211 -401 $943.96
21824 11243 206 -x401 $1,250.00
20
Signature
Title
Cost distribution ledger classification it
claim paid motor vehicle highway fund