Loading...
HomeMy WebLinkAboutAdd'l Lighting Approval 6-1-11Conn, An eiina V From: Sent: To: Cc: Subject: Hollibaugh, Mike P Tuesday, May 31, 2011 5:44 PM 'Forgey, Craig'; Conn, Angelina V; Donahue -Wold, Alexia K Crowley, Thomas; Jon Dobosiewicz; Blanchard, Jim E RE: Additional lights for CVS at Rangeline and Medical Drive Thank you Craig. Let this email suffice as administrative approval for the light installation. A copy will be placed with the project file and official record. Please file for an ILP with Building and Code Enforcement, they will want to look at the electrical work and do a final inspection. Mike Hollibaugh p. 571 2422 From: Forgey, Craig fmailto: cforaev Caaershmanbrowncrowlev.coml Sent: Tuesday, May 31, 2011 5:01 PM To: Hollibaugh, Mike P; Conn, Angelina V; Donahue -Wold, Alexia K Cc: Crowley, Thomas; Jon Dobosiewicz Subject: RE: Additional lights for CVS at Rangeline and Medical Drive Mike, Sorry for the delayed response. The only difference between the EM17 and the EM25 is the size of the fixture. The EM17 is a little smaller; both lights have a 175w lamp, and the photometric plan was based on the EM17 which we plan to install. Please let me know if we are ok to proceed. Thanks Craig W. Forgey Regional Construction Manager Gershman Brown Crowley, Inc. 600 East 96th Street Su'te 150 Indianapolis, iN 46240 Office: 317- 819 -01 Cell: 317- 508 -7960 From: Hol baug ke P f ma` to:MHollibauahCa carmel.in.Qov1 Sent: Mo a a 23 2 1 7:41 PM To: Forgey C a g; Conn, A:;ge na V; Donahue -Wold, Alexia K Cc: Crowley, T omas; Jon Dobosiewicz Subject: RE: Additional I`ghts for CVS at Rangeline and Medical Thank you Craig, th's he ps a ot. I do have one other question Iight was run (EM17) than what the literature covers EM25 It is used, but would like that clar'f'ed. Mike Drive From: Forgey, Craig fmailto: cforaev Cacershmanbrowncrowlev.coml Sent: Monday, May 23, 2011 9:34 AM To: Hollibaugh, Mike P; Conn, Angelina V: Donahue -Wold, Alexia K Cc: Crowley, Thomas; Jon Dobosiewicz Subject: FW: Additional lights for CVS at Rangeline and Medical Drive it appears from the photometric plan that a different probably doesn't matter if the lower watt (175 w) Tamp Mike, Thanks for your response. Below please find a response from our architect for the questions you posed on Friday. With regards to the style of the fixture, all existing lighting on the building are either the wall packs on the east side of the building, which we did not feel was appropriate for the north and south sides, or canopy lighting. Therefore, we felt the proposed fixture would blend with the architecture of the building the best. Thanks for your help, and please let me know if we are ok to proceed. Thanks. Craig W. Forgey Regional Construction Manager Gershman Brown Crowley, Inc. 600 East 96th Street Suite 150 Indianapolis, IN 46240 Office: 317 819 -0116 Cell: 317 508 -7960 From: Anderson, Erik J. f mailto :Erik.Anderson @jacobs.coml Sent: Friday, May 20, 2011 2:42 PM To: Forgey, Craig; SACiocca @cvs.com Subject: RE: Additional lights for CVS at Rangeline and Medical Drive Craig 1. The wall packs on the back of the building will not match the rest of the new fixtures- that is fine with me. They could be changed out if necessary. 2. The lights will be installed by drilling through the wall and running the wire internally. There will be no exposed conduit. 3. The fixture does not have an LED option. The lamp will be the same as the existing rear wall pack fixtures. Thanks, Erik Anderson, Assoc. A A JACOBS I Project Manager Global Buildings N.A., Fort Worth 1 817.222.8752 office I 817.739.8484 cell 817.222.8605 fax 1 erik.anderson @jacobs.com www.iacobs.com From: Forgey, Craig fmai to: cforgev @gershmanbrowncrowlev.coml Sent: Friday, May 20, 2011 12:59 PM To: Anderson, Erik J.; SACiocca @cvs.com Subject: Fw: Additional lights for CVS at Rangeline and Medical Drive Er k, Can you please help a ^swer ti ese questions ASAP. Thanks From: Hollibaugh, Mike P <MHollibaugh @carmel.in.gov> To: Forgey, Craig; Conn, Angelina V <Aconn @carmel.in.gov> Cc: Crowley, Thomas; Donahue -Wold, Alexia K <awold @carmel.in.gov> Sent: Fri May 20 13:38:45 2011 Subject: RE: Additional lights for CVS at Rangeline and Medical Drive Craig, Sorry it has taken so long gettng back to you on this. We are in agreement of the need to light better the CVS exterior, and wi'I not require additiona approvals. The light you are proposing is very nice looking. We do not have a problem moving forward with it, but do have the following questions? 2 1. The light itself is not like the other lights with the project. Does that matter to you? 2. Can you give us a better idea of how the lights will be installed and powered? Will their be exterior conduit or is there a way to access and power the Tight from the inside? 3. Is there an LED Tamp option that goes with that fixture? Please get back with me on the above. Thanks, Mike H. p. 5711 2422 From: Forgey, Craig fmailto: cforgey (agershmanbrowncrowlev.coml Sent: Wednesday, May 11, 2011 8:27 AM To: Hollibaugh, Mike P Cc: Crowley, Thomas Subject: Additional lights for CVS at Rangeline and Medical Drive Mike, I dropped of a submittal to your office last Thursday with our request to add some additional lighting to the new CVS we constructed at Rangeline and Medical Drive. CVS has expressed some concerns with the low level of lighting near their building on both the north and south sides of the building. Please let me know if you have had a chance to review our request, and if we have your approval to install the additional lighting. We appreciate your help. Thanks. Craig W. Forgey Regional Construction Manager Gershman Brown Crowley, Inc. May 5, 2011 Mike Hollibaugh City of Camel Department of Community Services Once Civic Square Carmel, IM 46032 RE: Lighting for CVS /Pharmacy at Medical Drive and Rangeline Road Dear Mr. Hollibaugh: CVS /Pharmacy has expressed concerns with the low level of lighting on the north and south sides of their new building constructed at above referenced intersection. They have asked us to seek the City's approval to install additional for security purposes. Attached please find specification sheets of the proposed lighting along with a new photometrics plan showing the increase lighting levels. Please let us know if we have your approval to install the additional lighting per the attached documents. Sincerely Ig l�orgey Regional Construction Manager Gershman Brown Crowley, Inc. GBC GERSHMAN BROWN CROWLEY INC. 600 E. 96TH STREET SUITE 150 ND ANAPO 5, IN 46240 o: (317) 574 -7333 f (317) 574 -7336 www.gershmanbroumcrowiey.com