Loading...
198656 06/22/2011 CITY OF CARMEL, INDIANA VENDOR: 364873 Page 1 of 1 ONE CIVIC SQUARE MONROE LLC CHECK AMOUNT: $77,843.21 CARMEL, INDIANA 46032 4440 W STATE ROAD 46 NASHVILLE IN 47448 CHECK NUMBER: 198656 CHECK DATE: 6/22/2011 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 211 4350900 4 7,782.61 OTHER CONT SERVICES 211 R4350900 27458 4 70,060.60 RIVER ROAD PATH VOUCHER NO. WARRANT NO. ALLOWED 20 IN SUM OF ON ACCOUNT OF APPROPRIATION FOR Board Members PO# or DEPT INVOICE NO. ACCT #!TITLE AMOUNT I hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and that the &/materials or services itemized thereon for which charge is made were ordered and received except 20/1 ign ure. Cost distribution ledger classification if Title claim paid motor vehicle highway fund Prescribed by State Board of Accounts City Form No 201 (Rev. 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. r Payee L �_C' Purchase Order No. 44go j6e� Xv Terms Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) I Total 2 I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer CONSTRUCTION PROJECT INVOICE DATE: June 10, 2011 COMPANY NAME: Monroe, LLC. AND ADDRESS 4440 West State Road 46 Nashville, IN 47448 TELEPHONE NO.: (812)- 988 -1615 FAX NO.: (317)- 847 -2697 PROJECT NAME: 106 Street Path from Gray Road to Hazel Dell Parkway PROJECT NO.: 10 -14 INVOICE NO.: 4 Construction pay items as per Progress Pay Estimates No. 4 as shown on the attached invoice for work completed between the dates of May 1, 2011 to June 8, 2011. TOTAL PAY THIS ESTIMATE: $86,492.46 MINUS 10% RETAINAGE: $8,649.25 TOTAL NOW DUE: $77,843.21 Submitted by CrossRoad Engineers, PC Project Representative`- signed name Date Lance Stahley Project Representative printed name 1 of 2 CITY OF CARMEL 106th Street Path Grey Rd. to Hazel Dell Pkwy River Rd. Path PROJECT NO. 10 -14 PROGRESS PAY ESTIMATE NO. 04 For work done during the period of: 5/1/11 through 618/11 Item Description Quantity this Total Quantity Unit Total Pay Total Pay No. Estimate to Date Price this Estimate to Date 1 Mobilization and Demobilization 0.48 LS 0.95 LS $20,000.00 $9,600.00 $19,000.00 2 Maintenance of Traffic 1.00 LS 1.00 LS $2,000.00 $2,000.00 $2,000.00 3 Clearing Right of Way LS 1.00 LS $5,000.00 $5,000.00 4 Linear Grading for Path LFT 4103.00 LFT $5.00 $20,515.00 5 Relocate Existing Sign 0.50 EA 1.00 EA $750.00 $375.00 $750.00 6 Fence, Wood, Remove and Reset LFT 65.00 LFT $10.00 $650.00 7 Sanitary Manhole, Adjust to Grade EA 1.00 EA $800.00 $800.00 8 Water Manhole, Adjust to Grade 1.00 EA 2.00 EA $800.00 $800.00 $1,600.00 9 Water Valve, Adjust to Grade EA 10.33 EA $300.00 $3,099.00 10 12" RCP LFT 35.00 LFT $40.00 $1,400.00 11 12" Concrete Pipe End Section EA 3.00 EA $700.00 $2,100.00 12 Structure Backfill CYS 10.04 CYS $60.00 $602.40 13 Reinforced Concrete Headwall LS 1.00 LS $2,500.00 $2,500.00 14 Handrail 11.00 LFT 11.00 LFT $90.00 $990.00 $990.00 15 HMA Surface, 9.5 mm, Type A 312.86 TON 312.86 TON $90.00 $28,157.40 $28,157.40 16 HMA Intermediate, 19.0 mm, Type A 667.10 TON 667.10 TON $63.00 $42,027.30 $42,027.30 17 Compacted Agg. No. 53, Base 115.58 TON 1297.92 TON $22.00 $2,542.76 $28,554.24 18 Curb Ramp, Concrete, Type C SYS 6.60 SYS $100.00 $660.00 19 Curb Ramp, Concrete, Type D SYS 21.87 SYS $100.00 $2,187.00 20 Transverse Marking, Thermoplastic Crosswalk LFT LFT $12.00 Line 6" 21 Nursery Sodding SYS SYS $4.00 22 Mulched Seeding SYS SYS $2.00 $86,492.46 1 $171,877.34 ,i 2 of 2 CITY OF CARMEL 106th Street Path Grey Rd. to Hazel Dell Pkwy River Rd. Path PROJECT NO. 10 -14 PROGRESS PAY ESTIMATE NO. 04 For work done during the period of: 5/1/11 through 6/8111 TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $86,492.46 TOTAL PAY TO DATE $171,877.34 DEDUCT 10% RETAINAGE $17,187.73 DEDUCT PREVIOUS NET PAY ESTIMATES $76,846.39 NET PAY ESTIMATE NO. 04 $77,843.21 CrossRoad Engineers, PC Inspecting Firm 1By Date Monroe, LLC G 1 Contractor IVY Date