Loading...
162318 08/07/2008 CITY OF CARMEL, INDIANA VENDOR: 358653 Page 1 of 1 t' ONE CIVIC SQUARE ENGLEDOW, INC 1, CARMEL, INDIANA 46032 1100 E 116TH ST CHECK AMOUNT: $16,459.90 CARMEL IN 46032 CHECK NUMBER: 162318 CHECK DATE: 817/2008 D EPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 2200 R4462401 16522 4 16,459.90 4TH MAIN RAB LANDSC J01 2 3 ?000 RUNDELL ERNSTdERGER ASSOC. FINAL CONSTRUCTION PROJECT INVOICE DATE: July 1, 2008 COMPANY NAME: Engledow Inc. AND ADDRESS 1100 East 116 Street Carmel, IN 46032 TELEPHONE NO.: 317 575 -1100 FAX NO.: 317- 573 -7339 PROJECT NAME: Carmel Streetscape Fourth and Main Street Roundabout PROJECT NO.: 05 -02L (REA Project No. 1024) INVOICE NO.: #4 —FINAL S'4 162 i Construction pay items as per Final Pay Estimate as shown on the attached invoice for work completed between the dates of June 1, 2007 to June 19, 2008. In addition, acceptance of the Final Pay Estimate by the Contractor shall release the City of Carmel from any further claims, financial, liable or otherwise, by the General Contractor and /or it's sub contractors, agents, personnel or otherwise. Acceptance of the Final Pay Estimate does not release the Contractor of it's responsibilities as stated in the Contract Documents. TOTAL PAY THIS ESTIMATE: $00.00 PLUS RETAINAGE DUE: $16,459.90 TOTAL NOW DUE: $16,459.90 Su itted by Runde I Ern tberger Associates, LLC `1/24108 roject epresentative s ned name Date Project Representative printed name ed y 'Co c Name" Pr ject Represe tive signed name Date a0ille5 L. C Project Representative printed name AIA Document G702 TIVI -1992 3 ;Me,3 Application and Certificate for Payment TO OWNER: PROJECT: 4t Main Street APPLICATION NO Distribution to: City of Carmel., Roundabout PERIOD TO'. 6/19/08 OWNER CONTRACT FOR: Landscape &Irrigation ARCHITECT FROM CONTRACTOR: VIA ARCHITECT: CONTRACT DATE: 2/28/07 CONTRACTOR Engledow Inc. Rundell Ernstberger PROJECT NOS: 16522/ FIELD OTHER CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information Application is made for payment, as shown below, in connection with the Contract. and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for Continuation Sheet, AIA Document G703, is attached. which previous Certificates for Payment were issued and payments received from the Owner, and 1. ORIGINAL CONTRACT SUM 182,341.00 that current payment shown herein is now due. 2. Net change by Change Orders -17 742.00 CON 7TO% E ngl ow, Inc. 3. CONTRACT SUM TO DATE (Line 1 2) 164,599.00 By: Date: 4. TOTAL COMPLETED 8 STORED TO DATE (Column G on G703) 164,599.00 State f: 't0f)UWX 5. RETAINAGE County of: a. 10 of Completed Work Subscribed and sworn to before (Column D E on G703) 0.00 me this (�h day of b. of Stored Material 0.00 `,�g�t►..l�p,� (Column F on G703) Notary Public. My Commission expires: Total Retainage (Lines 5a 5b or Total in Column I of G703) 0.00 6. TOTAL EARNED LESS RETAINAGE 164,599.00 ARCHITECT'S CERTIFICATE FOR PAYMENT (Line 4 Less Line 5 Total) In accordance with the Contract Documents, based on on -site observations and the data comprising 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT 148,139.10 this application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in (Line 6 from prior Certificate) accordance with the Contract Documents, and the Contractor is entitled to payment of the 8. CURRENT PAYMENT DUE AMOUNT CERTIFIED. 9. BALANCE TO FINISH, INCLUDING RETAINAGE AMOUNT CERTIFIED 11614 (Line 3 less Line 6) 0.00 (Attach explanation if amount certified differs froin the amount applied. Initial all figures on this Application and on the Continuation. Sheet that are changed to conform with the amount certified.) CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS ARCHITECT: �y Total changes approve d previous months by Owner $305.00 By: C p� Cy Date: 1 �O$ 0.00 18,047.00 Total approved this: This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor TOTALS $305.00 $18,047.00 named herein. Issuance payment and acceptance of payment are without prejudice to any rights of NET CHANGES b Change Order 77,742.00 the Owner or Contractor under this Contract. CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that cha will not be obscured. AIA Document G702TM 1992. Copyright 1953, 1963, 1965, 1971, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright @aia.org. A Document G702"— 1992 Instructions Application and Certificate for Payment GENERAL INFORMATION Purpose and Related Documents AIA Document G702, Application and Certificate for Payment, is to be used in conjunction with AIA Document G703, Continuation Sheet. These documents are designed to be used on a Project where a Contractor has a direct Agreement with the Owner. Procedures for their use are covered in AIA Document A201, General Conditions of the Contract for Construction. Use of Current Documents Prior to using any AIA Contract Document, users should consult www.aia.org or a local AIA component to verify the most recent edition. Reproductions This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G702, but only for use in connection with a particular project. The AIA will not permit reproduction outside of the limited license for reproduction granted above, except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User License Agreement (EULA). To report copyright violations of AIA Contract Documents, e -mail The American Institute of Architects' legal counsel, copyright @aia.org. COMPLETING THE G702 FORM After the Contractor has completed AIA Document G703, Continuation Sheet, summary information should be transferred to AIA Document G702, Application and Certificate for Payment. The Contractor should sign G702, have it notarized, and submit it, together with G703, to the Architect. The Architect should review G702 and G703 and, if they are acceptable, complete the Architect's Certificate for Payment on G702. The Architect may certify a different amount than that applied for, pursuant to Sections 9.5 and 9.6 of A201. The Architect should then initial all figures on G702 and G703 that have been changed to conform to the amount certified and attach an explanation. The completed G702 and G703- should be forwarded to the Owner. MAKING PAYMENT The Owner should make payment directly to the Contractor based on the amount certified by the Architect on AIA Document G702, Application and Certificate for Payment. The completed form contains the name and address of the Contractor. Payment should not be made to any other party unless specifically indicated on G702. EXECUTION OF THE DOCUMENT Persons executing the document should indicate the capacity in which they are acting (i.e., president, secretary, partner, etc.) and the authority under which they are executing the document. Where appropriate, a copy of the resolution authorizing the individual to act on behalf of the firm or entity should be attached. AIA Document G702TM 1992. Copyright 1953, 1963, 1965, 1971, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e -mail The American Institute of Architects' legal counsel, copyright@aia.org. r- TM Document G703 992 Continuation Sheet AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, APPLICATION NO 4 containing Contractor's, sibned certification is attached. APPLICATION DATE: 06/19/08 In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. PERIOD TO: 11/30/07 ARCHITECT'S PROJECT NO: 16522 A B C D E F' G H 1 WORK COMPLETED MATERIALS TOTAL BALANCE SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED TO RETAINAGE ITEM DESCRIPTION OF WORK STORED AND STORED (IF VARIABLE NO. VALUE APPLICATION THIS PERIOD (NOT IN TO DATE (G C) FINISH RATE) (D E) D OR E) (D +E +F) (C G) 1 Maintenance of Traffic $500.00 $500.00 $0.00 $500.00 100% $0.00 $0.00 2 Unit Paver $3,077.00 $3,077.00 $0.00 $3,077.00 100% $0.00 $0.00 3 Precast Stone Wall Veneer $7,448.00 $7,448.00 $0.00 $7,448.00 100 $0.00 $0.00 4 Precast Wall Cap Stone $8,862.00 $8,862.00 $0.00 $8,862.00 1 100% $0.00 $0.00 5 Concrete A, Substructure $31,752.00 $31,752.00 $0.00 $31,752.00 100% $0.00 $0.00 6 Compacted Aggregate, O, No.53 $1,240.00 $1,240.00 $0.00 $1,240.00 100% $0.00 $0.00 7 Topsoil $1,680.00 $1,680.00 $0.00 $1,680.00 100% $0.00 $0.00 8 Mulch, harwood Shredded Bark $165.00 $165.00 $0.00 $165.00 100% $0.00 $0.00 9 Plant, Perennial, 1 Gal. $2,650.00 $2,650.00 $0.00 $2,650.00 100% $0.00 $0.00 10 Plant, Annual, 4" Container $330.00 $330.00 $0.00 $330.00 100% $0.00 $0.00 11 Directional Bore $9,295.00 $9,295.00 $0.00 $9,295.00 100% $0.00 $0.00 Ha a Credit Directional Bore $9,295.00 $9,295.00 $0.00 $9,295.00 100% $0.00 $0.00 1 1 b Investigative work for Dir. Bore $681.00 $681.00 $0.00 $681.00 00% $0.00 $0.00 12 Irrigation System $5,57.00 $5,571.00 $0.00 $5,571.00 100% $0.00 $0.00 13 Fountain Installation $4,920.00 $4,920.00 $0.00 $4,920.00 00 $0.00 $0.00 14 Fountain Mechanical Install $53,267.00 $53,267.00 $0.00 $53,267.00 100% $0.00 $0.00 14a Fountain Modifications $3,795.00 $3,795.00 $0.00 $3,795.00 00% $0.00 $0.00 Total $125,938.00 $125,938.00 $0.00 $0.00 38 125,9.00 100% $0.00 r$0.00 CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document G703TM 1992. Copyright 1963, 1965, 1966, 1967, 1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten 0 0) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright@aia.org. flillwAIADocument G703"- 1992 Instructions Continuation Sheet GENERAL INFORMATION Purpose and Related Documents. AIA Document G702, Application and Certificate for Payment, is to be used in conjunction with AIA Document G703, Continuation Sheet. These documents are designed for use on Projects where the Contractor has a direct Agreement with the Owner. Procedures for their use are covered in AIA Document A201, General Conditions of the Contract for Construction. Use of Current Documents. Prior to using any AIA Contract Document, users should consult www.aia.org or a local AIA component to verify the most recent edition. Reproductions. This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G703, but only for use in connection with a particular project. The AIA will not permit reproduction outside of the limited license for reproduction granted above, except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User License Agreement (EULA). To report copyright violations of AIA Contract Documents, e -mail The American Institute of Architects' legal counsel, copyright @aia.org. COMPLETING THE G703 FORM Heading: This information should be completed in a manner consistent with similar information on AIA Document G702, Application and Certificate for Payment. Columns A, B C: These columns should be completed by identifying the various portions of the Project and their scheduled values consistent with the schedule of values submitted to the Architect at the commencement of the Project or as subsequently adjusted. The breakdown may be by sections of the Work or by Subcontractors and should remain consistent throughout the Project. Multiple pages should be used when required. Column C should be subtotaled at the bottom when more than one page is used and totaled on the last page. Initially, this total should equal the original Contract Sum. The total of column C may be adjusted by Change Orders during the Project. Column D: Enter in this column the amount of completed Work covered by the previous application (columns D E from the previous application). Values from column F (Materials Presently Stored) from the previous application should not be entered in this column. Column E: Enter here the value of Work completed at the time of this application, including the value of materials incorporated in the project that were listed on the previous application under Materials Presently Stored (column F). Column F: Enter here the value of Materials Presently Stored for which payment is sought. The total of the column must be recalculated at the end of each pay period. This value covers both materials newly stored for which payment is sought and materials previously stored which are not yet incorporated into the Project. Mere payment by the Owner for stored materials does not result in a deduction from this column. Only as materials are incorporated into the Project is their value deducted from this column and incorporated into column E (Work Completed —This Period.) Column G: Enter here the total of columns D, E and F. Calculate the percentage completed by dividing column G by column C. Column H: Enter here the difference between column C (Scheduled Value) and column G (Total Completed and Stored to Date). Column I: This column is normally used only for contracts where variable retainage is permitted on a line -item basis. It need not be completed on projects where a constant retainage is withheld from the overall contract amount. Change Orders: Although Change Orders could be incorporated by changing the schedule of values each time a Change Order is added to the Project, this is not normally done. Usually, Change Orders are listed separately, either on their own G703 form or at the end of the basic schedule. The amount of the original contract adjusted by Change Orders is to be entered in the appropriate location on the G702 form. Construction Change Directives: Amounts not in dispute that have been included in Construction Change Directives should be incorporated into one or more Change Orders. Amounts remaining in dispute should be dealt with according to Section 7.3 in A201. The following is an example of a Continuation Sheet for work in progress. Please note that dollar amounts shown below are for illustrative purposes only, and are not intended to reflect actual construction costs. A B C D f: F G H I WORK CONIPLF.TED MATERIALS TOTAL BALANCE I'KF:SF,NT1.1' CU \II'LI; I'I:D Kl:'fAl \AGI: ITEM SCHEDULED FROM PREVIOUS 'I 'U DESCKII'TION OI' WORK S'IORF.D AND S'IORI:D III` V. \KI. \KLE NO. VALUE AM'LICATION 'PHIS I'IiRIOD (O =C) FINISH (NU l' IN 'I'O DATE RATE) (O +EI 1) OR E) ID +E +1') (C C.) 1 MOBILIZATION 5,000 5,000 0 0 5,000 100 0 2 STUMP REMOVAL 5,000 5,000 0 0 5.000 100 0 3 EARTH WORK 15,000 10,000 5,000 0 15,000 100 0 4 LOWER RETAINING WALL 10,000 0 5,000 0 5,000 50 5,000 5 CURBS 6 MISC. CONC. 5,000 0 0 0 0 0 5,000 6 PAVING, UPPER DRIVE 20,000 0 0 0 0 0 20,000 7 PAVING, LOWER DRIVE 20,000 0 0 0 0 0 20,000 8 PAVERS 20.000 0 0 10,000 10,000 50 10,000 9 BRICK WORK 5,000 0 0 0 0 0 5.000 10 11 1 105,000 20,000 10,000 10,000 1 40,000 1 65,000 AIA Document G703TM 1992. Copyright 1963, 1965, 1966, 1967, 1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e -mail The American Institute of Architects' legal counsel, copyright @aia.org. TM Document G703 —1992 Continuation Sheet AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT APPLICATION NO` 4 containing Contractor's signed certification is attached. APPLICATION DATE: 06/19/08 In tabulations below; amounts are stated to the nearest dollar. Use Column I 6n Contracts where variable retainage for line items may apply. PERIOD T0: 08/31/07 ARCHITECT'S PROJECT NO: 16522 A B C D E F G H I WORK COMPLETED MATERIALS TOTAL BALANCE SCHEDULED FROM PREVIOUS PRESENTLY COMPLETED TO RETAINAGE ITEM DESCRIPTION OF WORK STORED AND STORED (IF VARIABLE NO, VALUE APPLICATION THIS PERIOD (NOT IN TO DATE (G C) FINISH RATE) (D E) D OR E) (D +E +F) (C G) 15 Mobilization Demobilization $3,500.00 $3,500.00 $0.00 $3,500.00 100% $0.00 $0.00 16 Electrical Sys., 4th Main St. $(100 $0.00 $0.00 17 Alternate $30,037,00 $30,037.00 $0.00 $30,037.00 100% $0.00 $0.00 17a Electrical Modifications $4,023.00 $4,023.00 $0.00 $4,023.00 100% $0.00 $0.00 18 Sidewalk repair for Meter Tap $1,101.00 $1,101.00 $0.00 $1001.00 100% $0.00 $0.00 Subt tats $38,661.00 $38,661.00 $0.00 $0.00 $38,661.00 00% $OAO $0.00 Total $164,599.00 $164,599.00 $0.00 $0.00 S 164,599.00 00% $0.00 $0.00 CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED. An original assures that changes will not be obscured. AIA Document G703TM 1992. Copyright (D 1963, 1965, 1966, 1967, 1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AlODocument is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible undei the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, copyright @aia.org. IxC� A IA Document G703 1992 Instructions Continuation Sheet GENERAL INFORMATION Purpose and Related Documents. AIA Document G702, Application and Certificate for Payment, is to be used in conjunction with AIA Document G703, Continuation Sheet. These documents are designed for use on Projects where the Contractor has a direct Agreement with the Owner. Procedures for their use are covered in AIA Document A201, General Conditions of the Contract for Construction. Use of Current Documents. Prior to using any AIA Contract Document, users should consult www.aia.org or a local AIA component to verify the most recent edition. Reproductions. This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G703, but only for use in connection with a particular project. The AIA will not permit reproduction outside of the limited license for reproduction granted above, except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software. Licensed AIA software users should consult the End User License Agreement (EULA). To report copyright violations of AIA Contract Documents, e -mail The American Institute of Architects' legal counsel, copyright @aia.org. COMPLETING THE G703 FORM Heading: This information should be completed in a manner consistent with similar information on AIA Document G702, Application and Certificate for Payment. Columns A, B C: These columns should be completed by identifying the various portions of the Project and their scheduled values consistent with the schedule of values submitted to the Architect at the commencement of the Project or as subsequently adjusted. The breakdown may be by sections of the Work or by Subcontractors and should remain consistent throughout the Project. Multiple pages should be used when required. Column C should be subtotaled at the bottom when more than one page is used and totaled on the last page. Initially, this total should equal the original Contract Sum. The total of column C may be adjusted by Change Orders during the Project. Column D: Enter in this column the amount of completed Work covered by the previous application (columns D E from the previous application). Values from column F (Materials Presently Stored) from the previous application should not be entered in this column. Column E: Enter here the value of Work completed at the time of this application, including the value of materials incorporated in the project that were listed on the previous application under Materials Presently Stored (column F). Column F: Enter here the value of Materials Presently Stored for which payment is sought. The total of the column must be recalculated at the end of each pay period. This value covers both materials newly stored for which payment is sought and materials previously stored which are not yet incorporated into the Project. Mere payment by the Owner for stored materials does not result in a deduction from this column. Only as materials are incorporated into the Project is their value deducted from this column and incorporated into column E (Work Completed —This Period.) Column G: Enter here the total of columns D, E and F. Calculate the percentage completed by dividing column G by column C. Column H: Enter here the difference between column C (Scheduled Value) and column G (Total Completed and Stored to Date). Column I: This column is normally used only for contracts where variable retainage is permitted on a line -item basis. It need not be completed on projects where a constant retainage is withheld from the overall contract amount. Change Orders: Although Change Orders could be incorporated by changing the schedule of values each time a Change Order is added to the Project, this is not normally done. Usually, Change Orders are listed separately, either on their own G703 form or at the end of the basic schedule. The amount of the original contract adjusted by Change Orders is to be entered in the appropriate location on the G702 form. Construction Change Directives: Amounts not in dispute that have been included in Construction Change Directives should be incorporated into one or more Change Orders. Amounts remaining in dispute should be dealt with according to Section 7.3 in A201. The following is an example of a Continuation Sheet for work in progress. Please note that dollar amounts shown below are for illustrative purposes only, and are not intended to reflect actual construction costs. A H C D IL Y G H I WORK l'(),%jpI,r, I) MATERIALS TOTAL Nr \LA \CI. I'RI;SI,N'II. CO \11'LF: 1' }:,D Rl:'I'AINA(i l: 17 SCIIL'DULLU PRO N11'RLVIO US 'r0 DI35CRI Pi9ON OF WORK SPORE ANDSr4RED (11 VARIn13Le NO, VALUE APPLIC. \'PION' Ills PERIOD (NO'I'IN '10DA'rl; I�rrC) 1=1N'ISI1 RA'I'L) 1 MOBILIZATION 5,000 5,000 0 0 5,000 100 0 2 STUMP REMOVAL 5,000 5,000 0 0 5,000 100 0 3 EARTHWORK 15000 10000 5,000 0 15,000 100 0 4 LOWER RETAINING WALL 10,000 0 5,000 0 5,000 50 5,000 5 CURBS d MI5C. CONC. 5,000 0 0 0 0 0 5,000 6 PAVING, UPPER DRIVE 20,000 0 0 0 0 0 20,000 7 PAVING, LOWER DRIVE 20,000 0 0 0 0 0 20,000 S PAVERS 20,000 0 0 10,000 10,000 50 10,000 9 BRICK WORK 5,000 0 0 0 0 0 5,000 0 11 105.000 20,000 10000 10,000 40,000 65,000 AIA Document G703TM 1992. Copyright OO 1963, 1965, 1966, 1967, 1970, 1978, 1983 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this document when completed. To report copyright violations of AIA Contract Documents, e -mail The American Institute of Architects' legal counsel, copyright@aia.org. TvT 1100 East 116th Street Phone: (317) 575 1100 ENGLED). VV Carmel, IN 46032 Fax: (317) 573 7339 GR vP INVOICE 306830 INVOICE DATE 06/1912008 BILL TO PROPERTY ADDRESS City of Carmel RAB 4th Main Board of Public Works Safety 4th Main St. One Civic Square Carmel, IN 46032 Carmel, IN 46032 Telephone: INVOICE DATE TERMS PO SALES REP 06/19/2008 Net 30 Days Dale Morris DESCRIPTION PRICE 05/02/2008: WORK ORDER: 1391 $16,459.90 Carmel 4th Main roundabout retainage. INVOICE TOTAL $16,459.90 PROPERTY AMOUNT INVOICE INVOICE DATE 1180 $16,459.90 306830 06/19/2008 ENGLEDI W 1100 East 116th Street Carmel, IN 46032 GR UID Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to-be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price-per unit, etc. Payee Engledow, Jnc. Purchase Order No. 1100 East 116th Street Terms Carmel, IN 46032 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s).or bill(s)) 7/1/08 App 4 -FINAL 4th and Main RAB 116,459.90 ree scape Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. ALLOWED 20 tee` ew I m. IN SUM OF 1100 East 116th Street Carmel, IN 46032 $16,459.90 O ON ACCOUNT OF APPROPRIATION FOR Department of Engineering Board Members PO# or INVOICE NO. ACCT #/TITLE AMOUNT DEPT. I hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and that the materials or services itemized thereon for 16522 pp #4 -FINAL 2 00- R4462401 $16,459.90 which charge is made were ordered and received except /y 200 ig ure Cost distribution ledger classification if Tlt claim paid motor vehicle highway fund