Loading...
HomeMy WebLinkAbout167207 12/17/2008 CITY OF CARMEL, INDIANA VENDOR: 356231 Page 1 of 1 ONE CIVIC SQUARE YARDBERRY LANDSCAPING EXCAV_ CHECK AMOUNT: $111,845.92 CARMEL, INDIANA 46032 9940 SOUTH 100 WEST tin�o'h ANDERSON IN 46017 CHECK NUMBER: 167207 CHECK DATE: 12117/2008 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 2200 R4462200 19775 2 111,845.92 MAIN STREET SIDE PATH CONSTRUCTION PROJECT INVOICE DATE: December 3, 2008 COMPANY NAME: Yarberry Landscape Excavating Company AND ADDRESS 9940 South 1000 West Anderson, IN 46017 TELEPHONE NO.: (765)- 620 -0981 FAX NO.: (765)- 378 -0376 PROJECT NAME: Main Street Sidepath Phase 1 Guilford Rd. to 4 th Ave. SW INVOICE NO.: 2 Construction pay items as per Progress Pay Estimates No. 2 as shown on the attached invoice for work completed between the dates of November 1, 2008 to November 30, 2008. TOTAL PAY THIS ESTIMATE: $124,273.24 MINUS 10% RETAINAGE: $12,427.32 TOTAL NOW DUE: $111,845.92 Submitted by CrossROad ineers, PC P ject pres n a ive signed name Date Jeremy St. Clair Project Representative printed name 1 of 2 CITY OF CARMEL Main Street Sidepath PROGRESS PAY ESTIMATE NO. 02 For work done during the period of: 11/1/08 through 11/30/08 Item Description• Quantity thiska Total Quantity ;1. Umt ,5-Total P r ay Total Pay No. Estimate` to•Date Price #this•Estimate. ..to Date 1 Mobilization /Demobilization 0.25 LSUM 0.75 LSUM $12,500.00 $3,125.00 $9,375.00 2 Construction Engineering 0.25 LSUM 0.75 LSUM $8,000.00 $2,000.00 $6,000.00 3 Clearing 0.25 LSUM 0.75 LSUM $20,000.00 $5,000.00 $15,000.00 4 Trees, 6 Remove EA 4.00 EA $500.00 $2,000.00 5 Headwalls and Partial Stone Wall, Remove LSUM 1.00 LSUM $2,500.00 $2,500.00 6 IValve Covers, Adjust to Grade EA 2.00 EA $500.00 $1,000.00 7 B- Borrow for Structure Backfill CYD 235.60 CYD $22.00 $5,183.20 8 Flowable BackFill for Pipes CYD CYD $115.00 9 Storm Sewer Pipe, 12" 4.00 LFT 421.00 LFT $45.00 $180.00 $18,945.00 10 Storm Sewer Pipe, 18" LFT 450.00 LFT $50.00 $22,500.00 11 Draihtile, PVC, 4" LFT LFT $25.00 12 Arch CMP, 95x67 LFT LFT $237.00 13 Inlet E -7 EA 6.00 EA $1,450.00 $8,700.00 14 Inlet J -10 EA 7.00 EA $1,450.00 $10,150.00 15 Manhole C-4 0.60 EA 3.60 EA $1,800.00 $1,080.00 $6,480.00 16 Cored Holes in Structures EA 2.00 EA $800.00 $1,600.00 17 Class A Concrete for Structures CYD 0.50 CYD $975.00 $487.50 18 Geotextile SYD SYD $5.00 19 Class II Riprap TON TON $60.00 20 Curb Ramps incl. truncated domes 57.57 SYD 98.07 SYD $130.00 $7,484.10 $12,749.10 21 4" Concrete Sidewalk 997.30 SYD 1168.70 SYD $49.00 $48,867.70 $57,266.30 22 Concrete Sidewalk Removal 5.56 SYD 109.56 SYD $10.00 $55.60 $1,095.60 23 Concrete Curb Gutter 549.50 LFT 790.50 LFT $20.00 $10,990.00 $15,810.00 24 Concrete Curb 89.00 LFT 307 -00 LFT $24.00 $2,136.00 $7,368.00 25 Concrete Curb or C &G Removal LFT 212.00 LFT $5.00 $1,060.00 26 Concrete Pavement for Drive, 6" 159.41 SYD 193.41 SYD $52.00 $8,289.32 $10,057.32 27 Modular Block Retaining Wall LFT LFT $125.00 28 Rebuilt Stone Wall LFT LFT $130.00 29 Pedestrian Railing LFT LFT $193.00 30 Flowable Backfill for Roadway Patching 10.00 CYD 27.50 CYD $115.00 $1,150.00 $3,162.50 31 Linear Grading 1312.00 LFT 1500 -00 LFT $10.00 $13,120.00 $15,000.00 32 Unsuitable Materials Remove/Replace undistribu CYD CYD $35.00 33 Compacted Ag For Base, 53 310.23 TON 468.04 TON $24.00 $7,445.52 $11,232.96 34 HMA Surface for Road Patching TON TON $115.00 35 Maintenance of Traffic 0.33 LSUM 0.66 LSUM $10,000.00 $3,300.00 $6,600.00 36 Construction Signs, A EA 16.00 EA $200.00 $3,200.00 37 Barricade, Type III undistributed EA EA $125.00 38 Silt Fencing LFT 930 -00 LFT $4.00 $3,720.00 39 I Construction Fencing LFT LFT $7.00 40 1 Ditch Inlet Protection EA EA $125.00 41 ICurb Inlet Protection EA EA $125.00 42 Tree Protection Trimming 0.25 LSUM 0.75 LSUM $4,800.00 $1,200.00 $3,600.00 43 Topsoil undistributed 56.00 CY 56.00 CY $40.00 $2,240.00 $2,240.00 44 Sod, Nursery 1200.00 SYD 1200.00 SYD $4.00 $4,800.00 $4,800.00 45 Water LSUM LSUM $1,000.00 46 Signs, Relocate 1 5.001 EA 1 5.00 EA $200.00 $1,000.00 $1,000.00 47 Mailbox, Relocate 1 2.001 EA 1 2.00 EA $150.00 $300.00 $300.00 48 1 QC Testing Videotaping 1 0.171LSUMI 0.501 LSUMI $3,000.00 $510.00 $1,500.00 124,273.24 271,6827 2of2 CITY OF CARMEL Main Street Sidepath PROGRESS PAY ESTIMATE NO. 02 For work done during the period of: 11ni08 through 11/30/08 TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $124,273.24 TOTAL PAY TO DATE $271,682.48 DEDUCT 10% RETAINAGE $27,168.25 DEDUCT PREVIOUS NET PAY ESTIMATES $132,668.32 NET PAY ESTIMATE NO. 02 $111,845.92 CrossRoad Engineers, PC Inspecting Firm By Date Yarberry Landscape Excavating Company t Z C� Contractor By Date Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995) CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Yardberry Landscape Excavating Purchase Order No. 9940 South 1000 West Terms Anderson, IN 46017 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 12/3/08 Pay App #2 Main Street Sidepath Phase 1 Gford to 4th Ave SW $111,845. Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. ALLOWED 20 IN SUM OF 9940 South 1000 West Anderson, IN 46017 $111,845.92 ON ACCOUNT OF APPROPRIATION FOR Department of Engineering Board Members PO# or INVOICE NO. ACCT #!TITLE AMOUNT DEPT. I hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and that the Hay pp 200- R4462200 2 materials or services itemized thereon for which charge is made were ordered and received except 20 Signat re Cost distribution ledger classification if Title claim paid motor vehicle highway fund