In August of 2000, the City received a request that was brought to the Board of Public Works and Safety,
regarding the City taking over responsibility of Century Drive, which runs along Woodland Professional
Center. At that time, the Board approved the City taking this street conditional upon certain
improvements and modifications being done (copy of original BPW letter attached). However, after the
Board's action, the petitioner determined that the expense of those improvements would prohibit him from
pursuing this request any further.
Currently, in conjunction with the 116 Street road improvements, the Utility Department will be installing
new lengths of sanitary and water lines in the vicinity of this property. A portion of the sanitary pipe will need
to be installed directly within Century Drive, which will involve removal of asphalt sections.
Due to this large amount of pavement restoration, John Duffy, the Utility Director, and I discussed the
plausibility of implementing the necessary improvements that would be required to bring the road up to the
City's standards, allowing us to assume responsibility for the street. The Utility Department will incur certain
costs to obtain the required easement and to make repairs to the streets, and therefore, the costs of the required
improvements are within an acceptable range for the Utility Department to pay.
Therefore, I would recommend the Board update their approval to accept the streets within Carmel
Station into the City's street system conditional upon the following:
1. The Utility Depaitiuent (not the petitioner) shall be responsible for replacement of the street and STOP
signs throughout the development to meet City standards for street signs, post types and heights. This will
likely be done by the Street Department, with the Utility Depaitnient paying for the materials.
2. The Utility Department (not the petitioner) shall pay for the repair and resurfacing of the street sections.
Previously, I recommended that the streets be re -built so that they do not have inverted crown sections
(low point is in the middle of the road, rather than on each side along the curbs /gutters) but have since
discussed this with the Street Commissioner, and we are satisfied that there is adequate pavement
thickness, and with the proper resurfacing and care, this should not be a problem to the City.
3. The Utility Department (not the petitioner) shall be responsible for the preparation of a legal description
and the paperwork/recording of required documents to dedicate such right -of -way boundaries to include
this road section. The Engineering Department has agreed to assist the Utility Department with this task.
If there are any questions regarding this request, I would be happy to discuss prior to, or at the Board's
meeting.
Sincerely,
M. Kate Weese, P.E.
City Engineer
JAMES BRAINARD, MAYOR
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441, FAx 317.571 -2439
EMAIL kweese @ci.carmel.in.us
August 30, 2000
Board of Public Works and Safety
City of Carmel
One Civic Square
Carmel, Indiana 46032
City of Carmel
Dear Board of Public Works and Safety:
DEPARTMENT OF ENGINEERING
An original request from Tracey Bruick. and follow -up correspondence from Diana Overstreet. both with
Williams Realty Group, and representing the Owners of Stratford Center and Dr. John Barbour of Cannel
Orthodontics located in Woodland Professional Center on Century Drive, requests the City of Carmel accept
the dedication of Century Drive between 116 Street and Merchants Square Drive West.
The issue of dedication of (previously) privately owned streets has been the subject of review for the last fey
years. Both the Department of Engineering and the Street Department have Nyorked together to develop a
process of evaluation that would fairly and consistently determine the feasibility of the City•s acceptance of
such requests.
Specific to this request for Century Drive.] have summarized the results of this Departments evaluation:
The street width meets the City's standard requirements.
Both the pavement and cross sectional design fall below the City's standards. This street has an inverted
crown section (lowest point is in middle. Nyhcre inlets and drainage are directed). The Citv'standard road
design includes a crown cross section (highest elevation in the center, each side collects drainage). The
petitioner agreed to pay for pavement core samples to determine depths. The results of these analyses
concluded that the pavement depths and quality are deficient and are in need of immediate repairs.
The development did not plat or dedicate any right -of -way. There are no sidewalks along this section of
road.
Size and mounting of Street and STOP signs does not meet Cite standards.
Records from the development period (at the time of Technical Advisory Committee TAC) indicate that the
City expressed concern over the design and construction of inverted crown sections. This design has in fact
caused the pavement in the central portion of the roadway to deteriorate. The City would incur major expense
to repair and/or rebuild this pavement immediately to reduce or eliminate constant maintenance problems.
Therefore, I would recommend the Board approve this request to accept the streets within Carmel
Station into the City's street system conditional upon the following:
1. The petitioner shall be responsible for replacement of the street and STOP signs throughout the
development to meet City standards for street signs, post types and heights.
2. The petitioner shall pay for the repair and re- structuring of the street sections to be crown sections. Even
the rebuilding of the inverted crown sections may not be enough to avoid similar. constant deterioration of
the street pavement sections. which Nyould affect the fair and reasonable financial responsibility of
maintaining this road as a City Street.
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571 -2441
3. The petitioner shall be responsible for the preparation of a legal description and the paperwork/recording
of required documents to dedicate such right-of-way boundaries to include this road section.
Sincerely,
M. Kate Weese. P.E.
City Engineer
Th
I
`l !1 II h
J
1 I `I r L I
.l I1111111jli11111 II IliIILfItIIIIIL) _J3
11111111!!11111! n i,�
)�11! :11:1{!:1!1!
6 nlnl!!111!III I (i
MARSH
MERCHANT'S SQUARE
ffl!It'll III! 11
lit! *1 11111
fh:I11111111!III:II!I
J
0 t:%.�Y
CARMEL DRIVE
7
J !I J L
L�
c L
I
1 1 :11 11 1111:!! !I!!�i i'.
1 '1711
l!!II!IIIIIIii
1 u 1111111111111
i!fllltlilll
111
11 1 1 i!imi,lnlullll!! r
,t iii m III:11111i1111111 T.'.5
JI B
I �iaa fI
5 Ill llllllllllil!l;;tIill I G M
G -13,
II!III :I:IIIIIIII!t i
Illlli!iiii li!i!!'w i
IIIIIIIIIIIIIIIIIIIIIIiii
,,Iti 11!Ililtllllll!!I
11 111111111!111111:1 7
/'•�I II.1 :H\41:lllllli 1
IIIIIIII
=r--
X1111 =:rte
J
11111110 V 1!11111 V ,,,,,,,,i:ll e, 71
u ti p( 1: I' I
r ii i :1 1 1 I; 11 :..:1: 11- u 1 f `.n
v -la
.L
C