HomeMy WebLinkAboutRight of Way construction estimate Ii4friova
r r..
n Enjineeri, y
ON/Si/1h*bie.
4937 Fieldstone Drive Whitestown, IN 46075 Phone: (31 7) 769 -2514 Fax: (317) 769 -3890
Right of Way Construction Cost Estimate
for
AutoZone Store# 4533
Prepared December 1, 2010
The cost listed below have bee base on the Site Plan as designed by AutoZone, Inc and
dated November 24 -2010 Priceslisted only'reflect those items to be dedicated to the City of Carmel
Indiana and do not include construction of the private storm sewer items to be retained by AutoZone.
r4 saZ- e rr x' .i:
T AU NNE RN o 3_9,N1 P Rl NG 1 o 1
CURBS 2,500.00
SIDEWALK W /RAMPS 6,379,00
1* 0 4 0 M 6,184.00
ASPHALT t� 41.,,
GRADING 4i4:-.., Iu..,,. m 5,805.00
t y 6 i� i'Ti�Y y ='s y
SEEDING EROSION CONTR 801.00
ROW'TQ A a i t 7 4 2 l 2 669 O A
t
r
:rtX sue
J:120101101141docs12010 1 "0 Rightpof Way C Cost Estimate.docx
g>
A.
Civil Engineering Land Planning Development Consultants
1 of 1