Loading...
HomeMy WebLinkAboutRight of Way construction estimate Ii4friova r r.. n Enjineeri, y ON/Si/1h*bie. 4937 Fieldstone Drive Whitestown, IN 46075 Phone: (31 7) 769 -2514 Fax: (317) 769 -3890 Right of Way Construction Cost Estimate for AutoZone Store# 4533 Prepared December 1, 2010 The cost listed below have bee base on the Site Plan as designed by AutoZone, Inc and dated November 24 -2010 Priceslisted only'reflect those items to be dedicated to the City of Carmel Indiana and do not include construction of the private storm sewer items to be retained by AutoZone. r4 saZ- e rr x' .i: T AU NNE RN o 3_9,N1 P Rl NG 1 o 1 CURBS 2,500.00 SIDEWALK W /RAMPS 6,379,00 1* 0 4 0 M 6,184.00 ASPHALT t� 41.,, GRADING 4i4:-.., Iu..,,. m 5,805.00 t y 6 i� i'Ti�Y y ='s y SEEDING EROSION CONTR 801.00 ROW'TQ A a i t 7 4 2 l 2 669 O A t r :rtX sue J:120101101141docs12010 1 "0 Rightpof Way C Cost Estimate.docx g> A. Civil Engineering Land Planning Development Consultants 1 of 1