Loading...
163521 09/04/2008 CITY OF CARMEL, INDIANA VENDOR: 358944 Page 1 of 1 0 ONE CIVIC SQUARE CENTRAL ENGINEERING CONSTRUCT1 Q�I CARMEL, INDIANA 46032 3862 N COMMERCIAL PARKWAY G AMOUNT: $29,862.90 GREENFIELD IN 46140 CHECK NUMBER: 163521 CHECK DATE: 9/4/2008 D ACC OUNT PO NUMBE I NVOICE NUMBER AMOUNT DESCRIPTION 106 5023990 18807 3 29,862.90 FOUNDERS PARKS INTRAS APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT TO (OWNER): PROJECT: Founders Park Infrastructure Phase 1 APPLICATION NO. 3 DISTRIBUTION TO: Carmel/ Clay Board of Parks and Recreation OWNER XX Attn.: Mark Westermeier 1411 East 116th Street VIA (ARCHITECT). PERIOD TO: 8/25/2008 Carmel, IN 46032 FROM: Central Engineering Construction Associates, Inc. ARCHITECT'S 3862 N. Commercial Parkway PROJECT NO: Greenfield, IN 46140 CONTRACT FOR: SITE IMPROVEMENTS CONTRACT DATE: 22- May -08 Application made for Payment, as shown below, in connection CONTRACTOR'S APPLICATION FOR PAYMENT with the contract. Continuation Sheet is attached. CHANGE ORDER SUMMARY 1. ORIGINAL CONTRACT SUM $1.015,718.00 Change Orders approved in ADDITIONS DEDUCTIONS 2. Net Change by Change Orders ($16,100.00) previous months by owner 3. CONTRACT SUM TO DATE $999,618.00 TOTAL 16,100.00 4. TOTAL COMPLETED STORED TO DATE $542,272.00 Approved this Month (Column G) No. Date Approved 5. RETAINAGE: a. 10.00% of Completed Work $54,227.20 (ColumnD +E) b. 10.00% of Stored Material �Z\4 (Column F) $0.00 TOTALS1 O.00l Total Retainage (Line 5a +5b) or $54,227.20 Net Change by Change Orders (Total in Column 1) ($16,100.00) 6. TOTAL EARNED LESS RETAINAGE $488,044.80 The undersigned Contractor certifies that to the best of the Contractor's (Line 4 less Line 5 Total) knowledge, information, and belief the Work covered by this Application 7. LESS PREVIOUS CERTIFICATES FOR $458,181.90 for Payment has been completed in accordance with the Contract Docu- PAYMENT (Line 6 from prior Certificate) ments, that all amounts have been paid by the Contractor for Work for 8. CURRENT PAYMENT DUE $29,862.90 for which previous Certificates for Payment were issued and payments 9. BALANCE TO FINISH, PLUS RETAINAGE $511,573.20 received from the Owner, and that current payment shown herein is (line 3 less Line 6) now due. CONTRACTOR: CENTRAL ENGINEERING CONSTRUCTION ASSOC., INC. State of: Indiana County of: Hancgck BY: DATE: 1 2 Z d Subscribed and S m to before me this 22n day of bt( 2008 Ka 4n Horth Powers, President Notary Public: My Com mission Expires: April 21, 201 AMOUNT CERTIFIED ARCHITECT'S CERTIFICATE FOR PAYMENT (Attached explanation if amount certified differs from the amount applied for.) In accordance with the Contract Documents, based on on -site observa- ARCHITECT: G►7 W. �q` 867, •aO tions and the data comprising the above application, the Architect certifies to the Owner that to the best of the Architect's knowledge, information, By: e e Date: 8 Z 1 •w and belief the Work has progressed as indicated, the quality of the Work is This Certificate in not negotiable. The AMOUNT CERTIFIED is is in accordance with the Contract Documents, and the Contractor is payable only to the Contractor named herein. Issuance, pay entitled to payment of the AMOUNT CERTIFIED. ment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this contract. CONTINUATION SHEET AIA DOCUMENT G703 PAGE 2 OF 2 PAGES PROJECT: FOUNDERS PARK INFRASTRUCTURE PHASE I APPLICATION NO.: 3 Job: 437 APPLICATION DATE: 25- Aug -08 PERIOD TO: 25- Aug -08 ENGINEER'S PROJECT NO.: A B C D E F G H I WORK COMPLETED MATERIALS TOTAL FROM PRESENTLY COMPLETED BALANCE RETAINAGE ITEM DESCRIPTION OF WORK SCHEDULED PREVIOUS THIS STORED AND STORED TO (IF VARIABLE) NO. VALUE APPLICATION PERIOD (NOT IN TO DATE (G 1 C) FINISH RATE (D E) D OR E) (D+E +F) (C G) 1 Mobilization 40,806.00 23,806.00 23,806.00 58% 17000.00 2380.60 2 Construction Staking 14,086.00 13,000.00 13,000.00 92% 1086.04 1300.00 3 Clearing 55,307.00 55,307.00 55,307.00 100% 0.00 5530.70 4 Earthwork 289,035.00 215,500.00 30,000.00 245,500.00 85% 43535.00 24550.00 5 Erosion Control 38,151.00 24,000.00 24,000.00 63% 14151.00 2400.00 6 Sanitary Sewer 35,110.00 34,110.00 1,000.00 35,110.00 100% 0.00 3511.00 7 Storm Sewer 104,921.00 102,740.00 2,181.00 104,921.00 100% 0.00 10492.10 8 Concrete Curbs /Sidewalk 177,447.00 0.00 0.00 0% 177447.00 0.00 9 Asphalt Paving 138,189.00 0.00 0.00 0% 138189.00 0.00 10 Seeding 82,038.00 0.00 0.00 0% 82038.00 0.00 11 Bonds Insurance 40,628.00 40,628.00 40,628.00 100%1 0.00 4062.80 12 Change Order #1: Asphalt 7,100.00 0.00 0.00 0% 7100.00 0.00 Concrete Curb /Sidewalks 9,000.00 0.00 0.00 O-A 9000.00 0.00 TOTALS: $999,618.00 $509,091.00 $33,181,001 $0.00 $542,272.00 54% $457,346.00 $54,227.20 PERCENT: 50.93% 3.32%1 0.00%1 54.25% 45 .75% AFFIDAVIT AND WAIVER OF LIEN Final Partial Payment to Follow STATE OF INDIANA County of HANCOCK Karen Horth Powers being duly sworn states that she/he is the President of Central En ing eering Construction Associates, Inc. having contracted with the Carmel /Clgy Board of Parks and Recreation to famish certain materials and/or labor as follows Site Improvement for a Project known as Founders Park Infrastructure Phase I, located in Carmel IN 46032 and owned by the Carmel/Clgy Board of Parks and Recreation and does further state PARTIAL WAIVER: that the final balance due from the owner is the sum of Twenty -Nine Thousand Eight Hundred Sixty -Two and 90/100 Dollars ($29,862.90) receipt of which is hereby acknowledged; or the payment of which has been promised as the sole consideration for this Affidavit and Partial Waiver of Lien which is given to and for said amount, effective upon receipt of such payment; FINAL WAIVER: that the final balance due from the owner is the sum of Dollars receipt of which is hereby acknowledged; or the payment of which has been promised as the sole consideration for this Affidavit and Final Waiver of Lien which shall become effective upon receipt of such payment. THEREFORE, the undersigned waives and releases unto the Owner of said premises any and all lien or claim whatsoever on the above described property and improvements thereon on account of labor or material or both, furnished by the undersigned thereto, and further certifies that no other party has any claim or right to a lien on account of any work performed or material furnished to the undersigned for said project, and within the scope of this affidavit and waiver. Karen Ho Powers President Title Witness My Hand and Notarial Seal, this 22 day of 1, k W L� 2008. Notary Public Li -China Wu Notary Public Printed Signature My Commission Expires April 21, 2016 County of Residence Hamilton ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice of bill to be properly itemized must show; kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Purchase Order No. 358944 Central Engineering Construction Assoc., Inc. Terms 3862 N Commercial Parkway Greenfield, IN 46140 Invoice Invoice Description Date Number (or note attached invoice(s) or bill(s)) Amount 8/25108 App 3 Founders park infrastructure phase 1 29,862.90 Total 29,862.90 1 hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6 1 20 Clerk- Treasurer Voucher No. Warrant No. 358944 Central Engineering Construction Assoc., Inc. Allowed 20 3862 N Commercial Parkway Greenfield, IN 46140 In Sum of 29,862.90 ON ACCOUNT OF APPROPRIATION FOR 106 Park Impact Fee Fund PO# or INVOICE NO. ACCT #/TiTLE AMOUNT Board Members Dept 18807 App 3 5023990 29,862.90 1 hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except 28 -Aug 2008 Signature 29,862.90 Accounts Payable Coordinator Cost distribution ledger classification if Title claim paid motor vehicle highway fund