Loading...
HomeMy WebLinkAbout0200.97 Building Plans 6i-� i� i v� n-re-�� ic.^� ir �w ry .�4 4�� z Q vv �P` N N Q Q N RI DGE W O u Q �`V d� L t21 DGE Q a 1/ALLEY DOWN I /12 1�OWN 12/12� b- �7 Q METAL ROOF S�DDLE ��q RAKE RAICE N W P�2 Q Q tY METAL ROOI I�eSign LoadS: �LOOR 40 P5F L I\/E LO/�D l0 P5F DEfi�t7 LOAD ROOF 30 P�F L I\/E LO�D 10 PSF DEP�D LOAD Des ign Loads I. TNE G�4RPENT�R SHP�LL G,4RE�ULLY L�Y OUT A�ND �l�.EGT ALL STRUGTUR�L MEMBERS OF ROUGH �G�RPENT�?Y, FRAMiNG, SHEATHINC�, P�ND BRIDGING. P�LL MEN6BER5 SHALL BE PROPERLY PLUMBED, LE1/ELED, �ND' BRA�GED UNTIL �4LL STRUGTURAL GOMNEGTIO�JS 1hRE IN PLAGE. SUF� I G I ENT NUMBER. OF NA I L5, SGREWS, A�ND BOLTS SHALL BE USED TC� INSURE THE RIGIDITY THE GONSTRUGTIC?N. 2. �RAt�iI�tG LUMB�R 51-��LL GON�ORM WITH �l/�TIONr4L DE51G1� SPEG{FIGP�TIONS FOR 5TRE55 GR�DE �UMBER r4ND I T5 F1�5TENI NC�S. JOI STS AND P�LL OTHER: N4.2 DOUGLAS FIR L�RGH �R YELLOW PINE Fb 1450 psi F� i000 p5� i,�bo,000 pa� 3. ALL FI R5T �LOOR 51 LL PLATES, GR�4WL SPAGE FRAMINC�, �4ND STRUGTU�AL MEMBERS EXP05ED TO 1N��4THER SNP�LL BE W4LM�4NIZ�I� PRE55URE TiREA�TED. 4. ROO� TRU55 DE51GN, SPEGI�IGP�TION, AND 'EREGTION PROGEDURE TO BE SUPPLIED BY THE TRU�S M,�h1UF�4GTURER. MlGRO-L�4M E3��44M STRUGTURAL PROPERTIES, Fb 2�0o p5� �G 270� p51 E 2,000,00o pst 6. PROV I DE D I �GONP�L BRA�G I NG AT ALL EXTiERI 4R GORNEizS. FRAMINC� O�ER GIRDER /�ND BEARING P�4}�TITIONS. JOISTS M1�Y BE BUTTEI7 TOG�THER OY�R. THC GENTER BEARING, PRO\/IDE J015T5 �RE TIED TOC�ETHER, OR J015T5 MAY BE L�PF'EI7 A�ND NAIL�D T4GETHER. MI NI MUM LAP, 4 I NGHES; M1�X. O\/ERHF�NG, I 2" S. FLOOR �015T5 SHALL BE DOUBLE UNDER E:�GN P�RP�LLEL Pf�RTlT14N. q. BRIDGING. M,4XIMUM 5P�4GING 14'. BRIDGING SHALL BE GR05SBR117G NG U511�G I x3 I h�GH BOl�RDS OR SC,�L I[� BRIDGINC� U� J015T DINfEN5101�1. 5ET 54LID B1�IDGING ►1� A�1� OFFSET FA�SHION. ID. WALL P,4RTITION �R/�MING. UNLE55 OTHERWISE SHOWN SP�hGE 5TUD5 I6 O.G. DOUBL� 5TUD5 AT OPEN{�1G5. GONSTRUGT PA� GOf�NERS W'',ITH N4 LE55 THA�N 3 FULL MEMBERS. W�LLS �ND �3EA�►RING PA�RTITIOl�lS SHALL HAYE DOUBLE TOP PLATE�'a. PLA�TES RESTING C)N M,�50NRY OF GOi�GRET� SH�LL BE �NGH4RED WI TH BOLTS. II. GLUE 5UB-FLOOR U51NC� REGOMMENDED �I�HE51�/E, A�PPLY GLUE B��D TO FRAMING AND ALONG �'�NEL C�RO'�E �DC�ES, NRIL W/ IOD N�hILS c� 12" U.G. 12. PRQ�/IDE N�lLERS, I�AILING 5TR1�'S, �1�1D C-aROUNI7S �-45 NEGE55ARY r4MD RIC�IDLY SEGURE Ii� PLAGE FOR �TTA�GHMENT O� TRiM, FIN15H, P�1�D OTHER WOt�.K. 13. J015T Hf�NGERS ��LL FLUSH BE�4M5 SH,�hI!�L BE MIN. I6 Gr4L�/. STEEL, fi�ND PROPERLY 51 ZED TO r�GGEPT J015T5. ASPH�LT SHINGLES W/ #30 BUILC�ING Pf�PER ON I/2" ROOF SHERTHING W! 5P�4GER5 PRE-ENG WD. TRU55E5 24" O.G. BY TRU55 MA1�tUFl�.G1URER T}-+15 i��C-�� I�� �==C�� fi�������G� Q1�1L'r'. ���i� TO 1���'�.K I N.C� ���W I N�5 �C�i�. ���GI�IG I�I��'f��1510NS I��T/�ILS. II II II II I� II I� 7�T II II II II II II II II 5PLA5H BL4GK r o�. SGALE: I/8" !'-O" .,..���n I GON7 INSULAT�ION A5 REQUIRED 5E�4MLE55 /�LUMINUM GUTTER W/ DC7WN SPOUTS ON Ixb FASGlA WI ND BFZAG I NG EXTERIOR GORNERS PP.OVIT�E FREEZE B4�RD �5 SNOWN 4N ELEVATIONS BRIGK W/ A�IRSPAGE 5/8" EXTERIOR SHEATHING W/ 2x4 WD. 5TUD5 I6" 4.G. 3 I/?_" (R-II) BF�TT INSULATION ON I/�" DRY1N/�LL FINISN �LOOR 01�! �18" T G 12" TIZI M.1015T (5PAG1 NG VARI E5) 4" GONG. SLAB W/ 6 MIL POLYETHELENE �T e �-�L_� i/2"=1'-p" ASPNP�LT SHINGLES I/2" RpOF SF+EATHIN� I" x b" ROUGH SAWN- I" x I Q" ROUGH SF�WM HOR. L�P SIDING TRU55 B�YOi�iD 5/8" SHEI�THING--� ��T�I�. ✓lJY""l�l._: I/�11�'I�O11 51 DE AND REA�"L ELEVATION DETAI L 12 /�5PH�4LT SHINGLES 8 �IN15H GRADE Tp VARY I/2" ROOF SHEATHIN 1 '�NC�TE: A,DJ. HEEL HEIGHT ON 12/12 SLOPE TO MATGH 8/12 X 8 FASG I A In" f�OURED GOh1G. WaLL V�1/ WATERPROO�ING EXTERIOR �/2�� SHEATHING 2x4 LOOKOUT I xb STUGGO SU8 FA�GIA W/ STUGGO GOVE I" x 12" BLOGK A5 REQ. 5/8" SHEATHIN �"ti DR/�IN TILE 5ET IN 12" 2x4 STUD W/ IN L. PEA GRAVEL BED 12" MIN. 2" BED-4" G�' :`ER I 2c�"xl0" GOHT. GO1�1G. SPREAD FT'G. W1 �,ONTINUOUS KEYWAY AND (2)-#5 RE-Bf�RS G0�1T'INUc"�USLY c�,T I Y 1��T�1� SGA�LE: I"= I'-O" ASPHf�LT 5HII�GLES I/2" ROOF SHEATHINC i x 8�� �H s,�wH- I" x 10" ROUGH SA�WN HC?R. LAP SIDING TRU55 BEYQND 5/�" SHE/�THING-- I��T� I sca�E: i i�2°=i�-o�� FRONr ELEVArlort pETAiL ASPHALT SHINGLES 8� I/2" ROOF SHEATHING *�(OTE: ADJ. ��EEL HEIGHT pN 12/12 SLOPE TU M�TGH 8/12 2x4 LGOKDUT---�� I" x 8 F,�SG I A I/?_" SHEATHING 7� I "�b" STUGGO 5UB Fl-�G W/ STUGGO GOVE MOLDIMG 57'1�1. STUGGC? 5/8" SHEATNING--- 2x4 STUD W/ INSUL: V ]��T�I� 5G/4l_E: i I'-O" TRU55 'G' 5�i'-4" ATTIG 5�"ORAGE TR1J55 STIGK FRAME o NOOK RE� PORGH 12 �6 W 12x14 STEEL BERM c".� T I O N� 2 SGP�LE: I,'8° �_O�� r v re-� w��r- i r►c i n i^ n-r-e-�� v- ir__ i S��JT I �%f'T�� I i_ C �ir C'-- r'H�-.' FQG "t" t� 5 t t .nLUMNS PAD FOOTING STL. GOLUMNS F44TING STL. GOLUMNS rR� FOOTI NG STL. GOLUMNS PAD FOOTI NG STL. GOLUMNS ii ii� ii� 24'-O" TF.lJ55 'H' ii� ir ii ir ii� .-L S�GT I ON� �o SGALE: I/8" I s O c� Q O dJ 3� O� N t�