Loading...
HomeMy WebLinkAboutinforeq45FAN SCHEDULE TAG ff-1 EF-2 ff-3 MFG GREENHECK GREENHECK GREENHECK MOD SP-B90 SP-B110 SP-6150 CF�I 101 133 160 DESIGN CF�I 75 105 150 S.P. .25 .25 .25 RPM 700 950 1050 HP 0.65 AMP 1.14 AMP 1.70 AI�IP VOLTi46E 115 60 1 115 60 1 115 60 1 OUTLET SCREEN GRAVffY INLEf LOCATION WOI�ENS RR SHOWER �IENS RR DISC. SWITCH YES YES YES NOTE: EC to provide switch for fans in each room. GRILLES, REGISTERS DIFFUSERS TAG SIZE NECK SIZE �IF6R MODEL NOTES SD1 24 24 6"� PRICE SCD SD2 24 24 8'� PRICE SCD SD3 24 24 10"0 PRICE SCD 1 1 PRICE 80-fR RG1 12 12 2 2 RG2 24 24 24 24 PRICE 80-FR TAG: LSD IS PRICE I�ODEL �AST SLOT DIFFUSER FCU PRICE I�ODQ� FCHCB FANCOIL UNfT SIZE 10, 3/ row, 4 pipe 690 CFM Design 21.5 I�BH Cooling, 5.3 GP�I 47.7 MBH Heating, 2.5 GPi� FCU PRICE I�ODEL� FCHCB FANCOIL UNff SIZE 12, 3/2 row, 4 pipe 965 CFlrl Design 23.8 I�BH Cooling, 5.8 GP�I 53.7 MBH Heating. 2.5 GPM FCU PRICE �IODEL� FCHCB FANCOIL UNff 3 SIZE 10, 3/ row, 4 pipe 750 CFM Design 21.5 �IBH CooGng, 5.3 GPI� 47.7 MBH Heating� 2.5 GP�I FCU PRICE �IODEL� FCHCB FANCOIL UNff SIZE 8, 4/2 row� 4 pipe 595 CFM Des�gn 15.8 MBH Cooling, 4.4 GPM 35.7 I�BH Heating, 1.5 GPM P RICE bIODEL FCH CB FANCOIL UNff FCU SIZE 6 3 2 row 4 i P Pe 5 42Q CFirl Design 12.2 f�BH Cooling, 3.0 GPM 28.7 MBH Heating, 1.5 GP�I FCU PRICE h10DEL� FCHCB FANCOIL UNff SIZE 6, 4/2 row, 4 pipe 500 CFlrl Design 13.7 I�BH Cooling, 3.9 GPI� 28.7 MBH Heating. 1.5 GP�1 specifications: Section 15500: Sco Of Pro'ect Pe J Patt 1: General 1.1 Furnish all materials and labor required to provide a complete� operable and acceptable installation as shown on the Controct Documents. 1.2 All items described w'dhin the Contract Documents shall be furnished and installed complete by the Controctor unless noted otherwise. 1.3 Worlc shall include, but not necessarily be limited to, the following: A Fan coil un'its. B. Ductwork and terminal devices. C. Exhaust ductwork and fans. D. Insulation of ductwork. E Tem rature control em. Pe F. Testing and balancing. 1.4 All i�aterials and equipment shall be in strict acco�dance with the Contract Documents and same shall be new� of the best grade and qual'ity. 1.5 Submit product data and/or shop drawings as specified in the Contract Documents. 1.6 All work must be perfoRned in accordance w'�th all Federol, State and Local Laws� Codes� Ordinances, etc. 1.7 All materials ond equipment shall be installed by mechanics 'll in their �icular trade. sk� ed pa M I�R AR s r wi 1° Q.�.� ��A...�'° OB tim�l AR 90Ut�0 90' DUCT DETA� N ALL ROOYS specifications: Section 15400: Scope Of Project Part 1: General 1.1 Fumish all materials and labor r�equired to provide a complete� operable and acc�ptabk instalkrtion as stwwn on the Controct Docume.nts. 1.2 All items described within the Contr�act Documents shall be fum�hed and install�ed complete by the Contr�octor unless noted othawise. 1.3 Work shall include� but not necessarily be lim'ded to. the folbwing: A Domestic water piping system. B. San'�tary drainage vent piPing system. C. Insulation of plumbing piping systems. D. Plumbing fixtures dt equipmer�t. 1.4 All �taterials and equipment shall be in strict accordance w'�th the Contract Documents and same shall be new, of the best grade and qual'�ty. 1.5 Submit product dota and/or shop drowings as specified in the Controct Documier�ts. 1.6 All woric must be performed in accordance wdh all Federal� State and Local Lawrs, Codes, Ordinances� etc. 1 J All materials and equipment shall be installed by mechanics skilled in their part'icular trade. 1.8 Coordination of all Sub-Controcts throughout the cor�struction of this project sMall be the r�eponsibil'dy of the Contr�actor. PLUMBING FIXTURES TAG DESCRIP'T10N WA5TE CW HYY FlXNRE TRII� WC-2 WATER CLOSET, Fl�� TIWK AD�A 4' 1 Z� AS. 2386.012 WH(TE 295SSC SEAT 111-XL-Regal LAV-2 LAVATORY� SR MA 1-1 2� 1 2� 1 2� AS. 0476.028 WH(TE DELTA 501-CNRMI-4-HDL UR-2 URINAI„ WH AD�A 2' 3 4' AS. 6541.132 WH�TE SLQAN 186-XL-R I S-2 SINK, SS, SINGLE BOMfI 25X22 1-1 2' 1 Z" 1 2' DAYrON D12522-3 DELTA 100-CHRMt-B-SWG GD GARBA6E DISPOSAL BADGER 1 Dishwasher Hook-u SH-2 SFIOMIER PACKA6E AD�A 2' 3 4' 3/4' SH383877-LGB-LHS32R 11T5153 24' Slide Grab Bar ___r 1 C 1 X �rt �r�+- f�� T��z� _�z�ri���._�r■ �s= �,r r, r.� -r t__ x Y- I r 'I L I, I I, i Mwss�� FCU 3/�4"HWS&R 6 I= r--" I FCU 1 �C4VS&R �.r���.��rf�rim. I i 1 CWS&R 5 I,i }i Il i� i i i r M i l; i �Iws&R s �ririifrtrrr�~r DN UP v ��r WS&R �j p� I��,.. z-, I 3/4 HW�B�R I I F FCU y 4 p rrrrrtxll.�r�lr_Iti' I 1 HWSB�R 1 HVNSBtR i FCU FCU 3 �y- 2 1-1 /4"CWS&R T I i ,,.1 1 4 CW�&R I I I l I r' i +.�r«��rrntr.��.---- ,i I r I 1 il i I i j FCU EX�St.Mw�&R F i 1-1 /2 HY�IS&R 1 I 'I H i n I�l k_ r- +-F I kt E�'�sf.�& I i 2�Cws&R i I, _r I� i I i i.. i I i I r T -�o C 2ND FLOOR HVAC PIPING PLAN SCALE: 1 /8"= 1'-0" j 1 I_ ��n1Il�rt�rrl.trli� s, r- i_ 'G_ S2. I i I J r�&cw I DN UP ��».viifr�r�f�xh �i �-�{�y I I i i TI to Ex�st. 4»HW ���«f��r��.r.�y I i---- �CW w ��4 H&cw 3 9 �h L i I k `e 'I/!///IlrI.Ulllli i r LAN2 2 v I I� I I I I 1-�r SH2 1 �"H&C�V► I I r I t p l �L ,;���5`?�';`� i i c J �v� �avz 1-1 ��'til I j i UR2 I, WC2 2'�V 1 _J_ 4 t �.�y i_ f 1 ��tf 2ND FLOOR VENT WATER PLAN SCALE: 1 /8"= 1'-0" t LSD2 I _t�t�2 t�D2- LSD2 210 210 250 250 rrrt� ��`i.rri�-��,,�t� F �M'I 1i11� fs 1.�_- I,�_,_ ��r'f _�,t-.-- 1 .T t_ �.r __._._._r r. i.. :r a i i �i T �r n 8� L 10� 100 r �r b� I 12� i i j i r [k �I L I i� j J r _�i n !i i I I t, i I I -i i DN UP �j SD3 300 �o� I 14� T T Y i 11 I I ,I I '��r� m I F LSD2 r1111I!/IIlIIIIII� 4`: 7 'S 250 S01 ��0 6� SD1 10 r.rrrnrlll��,• SD1 10� 10� 1Q0 LSD3 y__ 0 25 T 0 9 6 s rr.rf����.rrtxr T T 12� SD 14� 100 l LSD3 N v, r_ i i 1 i I r I ,�r.rtrm.rrr�rf�r< 250 F�, 6� f I SD v� I SD1 i 90 5D1 I iI �8 (�-T.�. to �'�x� t. I�l i F I �8� I SD2 120 6� 130 EF3 l 150 T.a. to Exist. SD1 SD2 8� SD2 SD2 90 200 200 200 _�s��_a_�r u_ 2ND FL�OR HVAC DUCTW�RK PLAN SCALE: 1 /8"= 1 '-0" )I t ,I. i r T- l���l�, ,�r S2 I� I i i i 1__ I I Y I, I I 'F l I I° DN t UP rrri�l.rrrr�rrnrr. r r i I F.. 4 f_ T I to Ex�st. rmr.rrr ry-_ �s J 4"w I I A 1 �(�L 11�r. .�rr� v1V L 1 r 'lI!!!/!l,/I/!Z1'!G/ r 4�W T I t f I f ..i� .a�.: I SH2 i i� F� I 6 ��J��' o N s LAV2 LAV2 I uRZ k 2"w� WC2 4 t tT r a r f I .._��._�_....,.�_4..<._� -<.az.- .....�..r._�.. s_s... .�r�_. 4-- i:. J: 1 ST F LOO R WASTE P LAN SCALE: 1 /8"= 1'-0" r� �..ir�c�ln I��p�s ��t�i�r�� �,��.�,��3 '��3�'t��r��'���5�����.C�� iti�■�������■�iiii N Z Z W O m�°Z f^ w i v' t LJJ F_ W I �Z� Q w L �U W Q =M U iii�����������iii Mechanical Contracting Services, Inc. 15371 Stony Creek Way Noblesville, Indiana 46060 I D �����i I i sr .s f �s� ,��v RE•��� ,I No, 20158 STATE OF �41 'c� HD I ANP••�� SS ��NAL �G� E ��a THE PLANS, IDEAS 8� DESIGNS REPRESENTED HERE ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF APRIL MCCLIJRG DESIGN CO. ALL RIGHTS RESERVED, EXCEPT WHEN WRITTEN CONSENT IS GIVEN. CONTRACTORS ARE TO VERIFY AND ARE RESPONSIBLE FOR ALL JOB SITE DIMENSIONS. i, �,ISSUE: SUBMITTAL SET''�, DATE: 08/ 10/ 11 ��I�'�,I�' 1 III MECH. PLAN i