HomeMy WebLinkAboutinforeq45FAN SCHEDULE
TAG ff-1 EF-2 ff-3
MFG GREENHECK GREENHECK GREENHECK
MOD SP-B90 SP-B110 SP-6150
CF�I 101 133 160
DESIGN CF�I 75 105 150
S.P. .25 .25 .25
RPM 700 950 1050
HP 0.65 AMP 1.14 AMP 1.70 AI�IP
VOLTi46E 115 60 1 115 60 1 115 60 1
OUTLET SCREEN
GRAVffY INLEf
LOCATION WOI�ENS RR SHOWER �IENS RR
DISC. SWITCH YES YES YES
NOTE: EC to provide switch for fans in each room.
GRILLES, REGISTERS DIFFUSERS
TAG SIZE NECK SIZE �IF6R MODEL NOTES
SD1 24 24 6"� PRICE SCD
SD2 24 24 8'� PRICE SCD
SD3 24 24 10"0 PRICE SCD
1 1 PRICE 80-fR
RG1 12 12 2 2
RG2 24 24 24 24 PRICE 80-FR
TAG: LSD IS PRICE I�ODEL �AST SLOT DIFFUSER
FCU PRICE I�ODQ� FCHCB FANCOIL UNfT
SIZE 10, 3/ row, 4 pipe
690 CFM Design
21.5 I�BH Cooling, 5.3 GP�I
47.7 MBH Heating, 2.5 GPi�
FCU PRICE I�ODEL� FCHCB FANCOIL UNff
SIZE 12, 3/2 row, 4 pipe
965 CFlrl Design
23.8 I�BH Cooling, 5.8 GP�I
53.7 MBH Heating. 2.5 GPM
FCU PRICE �IODEL� FCHCB FANCOIL UNff
3 SIZE 10, 3/ row, 4 pipe
750 CFM Design
21.5 �IBH CooGng, 5.3 GPI�
47.7 MBH Heating� 2.5 GP�I
FCU PRICE �IODEL� FCHCB FANCOIL UNff
SIZE 8, 4/2 row� 4 pipe
595 CFM Des�gn
15.8 MBH Cooling, 4.4 GPM
35.7 I�BH Heating, 1.5 GPM
P
RICE bIODEL FCH
CB FANCOIL UNff
FCU
SIZE 6 3 2
row 4 i
P Pe
5
42Q CFirl Design
12.2 f�BH Cooling, 3.0 GPM
28.7 MBH Heating, 1.5 GP�I
FCU PRICE h10DEL� FCHCB FANCOIL UNff
SIZE 6, 4/2 row, 4 pipe
500 CFlrl Design
13.7 I�BH Cooling, 3.9 GPI�
28.7 MBH Heating. 1.5 GP�1
specifications:
Section 15500: Sco Of Pro'ect
Pe J
Patt 1: General
1.1 Furnish all materials and labor required to provide a complete�
operable and acceptable installation as shown on the Controct
Documents.
1.2 All items described w'dhin the Contract Documents shall be
furnished and installed complete by the Controctor unless noted
otherwise.
1.3 Worlc shall include, but not necessarily be limited to, the
following:
A Fan coil un'its.
B. Ductwork and terminal devices.
C. Exhaust ductwork and fans.
D. Insulation of ductwork.
E Tem rature control em.
Pe
F. Testing and balancing.
1.4 All i�aterials and equipment shall be in strict acco�dance with
the Contract Documents and same shall be new� of the best grade
and qual'ity.
1.5 Submit product data and/or shop drawings as specified in the
Contract Documents.
1.6 All work must be perfoRned in accordance w'�th all Federol,
State and Local Laws� Codes� Ordinances, etc.
1.7 All materials ond equipment shall be installed by mechanics
'll in their �icular trade.
sk� ed pa
M I�R AR
s r wi 1°
Q.�.�
��A...�'°
OB tim�l AR 90Ut�0 90' DUCT DETA� N ALL ROOYS
specifications:
Section 15400: Scope Of Project
Part 1: General
1.1 Fumish all materials and labor r�equired to provide a complete� operable and acc�ptabk instalkrtion as stwwn on the Controct Docume.nts.
1.2 All items described within the Contr�act Documents shall be fum�hed and install�ed complete by the Contr�octor unless noted othawise.
1.3 Work shall include� but not necessarily be lim'ded to. the folbwing:
A Domestic water piping system.
B. San'�tary drainage vent piPing system.
C. Insulation of plumbing piping systems.
D. Plumbing fixtures dt equipmer�t.
1.4 All �taterials and equipment shall be in strict accordance w'�th the Contract Documents and same shall be new, of the best grade and qual'�ty.
1.5 Submit product dota and/or shop drowings as specified in the Controct Documier�ts.
1.6 All woric must be performed in accordance wdh all Federal� State and Local Lawrs, Codes, Ordinances� etc.
1 J All materials and equipment shall be installed by mechanics skilled in their part'icular trade.
1.8 Coordination of all Sub-Controcts throughout the cor�struction of this project sMall be the r�eponsibil'dy of the Contr�actor.
PLUMBING FIXTURES
TAG DESCRIP'T10N WA5TE CW HYY FlXNRE TRII�
WC-2 WATER CLOSET, Fl�� TIWK AD�A 4' 1 Z� AS. 2386.012 WH(TE 295SSC SEAT 111-XL-Regal
LAV-2 LAVATORY� SR MA 1-1 2� 1 2� 1 2� AS. 0476.028 WH(TE DELTA 501-CNRMI-4-HDL
UR-2 URINAI„ WH AD�A 2' 3 4' AS. 6541.132 WH�TE SLQAN 186-XL-R I
S-2 SINK, SS, SINGLE BOMfI 25X22 1-1 2' 1 Z" 1 2' DAYrON D12522-3 DELTA 100-CHRMt-B-SWG
GD GARBA6E DISPOSAL BADGER 1 Dishwasher Hook-u
SH-2 SFIOMIER PACKA6E AD�A 2' 3 4' 3/4' SH383877-LGB-LHS32R 11T5153 24' Slide Grab Bar
___r 1 C 1
X �rt �r�+- f�� T��z� _�z�ri���._�r■ �s= �,r
r, r.�
-r t__ x
Y-
I
r
'I L
I,
I
I,
i
Mwss��
FCU
3/�4"HWS&R 6
I=
r--" I
FCU 1 �C4VS&R �.r���.��rf�rim. I
i 1 CWS&R
5
I,i
}i
Il
i� i
i i r
M i
l; i �Iws&R
s
�ririifrtrrr�~r
DN UP
v
��r
WS&R
�j
p�
I��,..
z-,
I
3/4 HW�B�R
I I F
FCU
y 4
p rrrrrtxll.�r�lr_Iti'
I 1 HWSB�R
1 HVNSBtR
i
FCU
FCU 3
�y-
2
1-1 /4"CWS&R
T I i ,,.1 1 4 CW�&R I
I I l I r' i
+.�r«��rrntr.��.----
,i I r I
1
il i
I
i j
FCU
EX�St.Mw�&R
F i 1-1 /2 HY�IS&R
1
I
'I
H
i n I�l
k_ r- +-F
I kt
E�'�sf.�& I
i
2�Cws&R
i I, _r I�
i I i i..
i I i
I
r
T -�o
C
2ND FLOOR HVAC PIPING PLAN
SCALE: 1 /8"= 1'-0"
j
1
I_
��n1Il�rt�rrl.trli�
s,
r-
i_ 'G_ S2.
I
i I
J
r�&cw
I DN UP
��».viifr�r�f�xh
�i
�-�{�y
I
I
i
i
TI to Ex�st.
4»HW ���«f��r��.r.�y
I i----
�CW
w
��4 H&cw
3
9 �h
L i
I k `e 'I/!///IlrI.Ulllli i r
LAN2
2 v I
I� I I I I
1-�r
SH2 1 �"H&C�V► I
I
r
I t
p l �L
,;���5`?�';`� i
i c
J
�v� �avz
1-1 ��'til
I
j
i
UR2
I,
WC2
2'�V
1
_J_
4 t
�.�y
i_ f
1 ��tf
2ND FLOOR VENT WATER PLAN
SCALE: 1 /8"= 1'-0"
t
LSD2 I _t�t�2 t�D2- LSD2
210 210 250 250
rrrt� ��`i.rri�-��,,�t�
F �M'I 1i11� fs 1.�_- I,�_,_ ��r'f _�,t-.--
1 .T t_ �.r __._._._r r. i.. :r
a
i
i �i
T �r n
8� L 10� 100
r
�r
b� I 12�
i
i
j
i r [k �I
L I
i�
j J
r _�i n
!i i
I
I
t,
i
I
I
-i
i
DN UP �j
SD3
300 �o�
I
14�
T T
Y i 11
I
I
,I
I '��r� m
I
F LSD2
r1111I!/IIlIIIIII� 4`:
7 'S 250
S01
��0
6�
SD1
10 r.rrrnrlll��,•
SD1
10� 10�
1Q0 LSD3
y__ 0
25
T
0
9
6
s
rr.rf����.rrtxr
T
T 12�
SD 14�
100 l LSD3
N v, r_ i i 1 i
I r I ,�r.rtrm.rrr�rf�r< 250
F�, 6� f
I
SD
v� I SD1
i
90
5D1
I
iI
�8 (�-T.�. to
�'�x� t. I�l
i
F
I �8�
I SD2 120 6�
130
EF3
l
150
T.a. to
Exist.
SD1 SD2 8� SD2 SD2
90 200 200 200
_�s��_a_�r u_
2ND FL�OR HVAC DUCTW�RK PLAN
SCALE: 1 /8"= 1 '-0"
)I
t
,I.
i
r
T-
l���l�,
,�r S2
I� I i
i i
1__
I
I
Y I, I I
'F l
I
I° DN t UP rrri�l.rrrr�rrnrr.
r
r i I
F..
4
f_
T
I to Ex�st.
rmr.rrr
ry-_
�s
J
4"w I
I
A 1
�(�L 11�r. .�rr�
v1V L 1 r 'lI!!!/!l,/I/!Z1'!G/
r
4�W T I
t f I f ..i� .a�.: I
SH2
i
i�
F�
I
6
��J��'
o
N
s LAV2 LAV2 I
uRZ
k 2"w�
WC2 4
t
tT r
a r f
I
.._��._�_....,.�_4..<._�
-<.az.- .....�..r._�.. s_s... .�r�_. 4--
i:.
J:
1 ST F LOO R WASTE P LAN
SCALE: 1 /8"= 1'-0"
r�
�..ir�c�ln
I��p�s ��t�i�r��
�,��.�,��3
'��3�'t��r��'���5�����.C��
iti�■�������■�iiii
N
Z Z
W O
m�°Z
f^ w
i v' t
LJJ F_ W
I �Z�
Q w L
�U
W Q
=M U
iii�����������iii
Mechanical Contracting Services, Inc.
15371 Stony Creek Way
Noblesville, Indiana 46060
I D �����i
I i
sr
.s
f
�s�
,��v RE•��� ,I
No,
20158
STATE OF �41
'c� HD I ANP••��
SS ��NAL �G�
E
��a
THE PLANS, IDEAS 8� DESIGNS REPRESENTED
HERE ARE THE EXCLUSIVE INTELLECTUAL
PROPERTY OF APRIL MCCLIJRG DESIGN CO.
ALL RIGHTS RESERVED, EXCEPT WHEN WRITTEN
CONSENT IS GIVEN.
CONTRACTORS ARE TO VERIFY AND ARE
RESPONSIBLE FOR ALL JOB SITE DIMENSIONS. i,
�,ISSUE: SUBMITTAL SET''�,
DATE: 08/ 10/ 11
��I�'�,I�' 1 III
MECH. PLAN
i