163287 09/03/2008 CITY OF CARMEL, INDIANA VENDOR: 361523 Page 1 of 1
ONE CIVIC SQUARE LINCOLN BANK
CHECK AMOUNT: $3,318.10
CARMEL, INDIANA 46032 ATTN MAX C HANK
905 SOUTHFIELD DR CHECK NUMBER: 163287
PLAINFIELDIN 46168
CHECK DATE: 9/3/2008
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUM AMOUNT DESCRIPTION
106 5023990 18807 3 3,318.10 FOUNDERS PARKS INTRAS
i
APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT
TO (OWNER): PROJECT: Founders Park Infrastructure Phase 1 APPLICATION NO. 3 DISTRIBUTION TO:
Carmel/ Clay Board of Parks and Recreation OWNER XX
Attn.: Mark Westermeier
1411 East 116th Street VIA (ARCHITECT): PERIOD TO: 8/2512008
Carmel, IN 46032
M FROM: Central Engineering 8 Construction Associates, Inc. ARCHITECTS
3862 N. Commercial Parkway PROJECT NO:
Greenfield, IN 46140
CONTRACT FOR: SITE IMPROVEMENTS CONTRACT DATE: 22 -May -08
Application made for Payment, as shown below, in connection
CONTRACTOR'S APPLICATION FOR PAYMENT with the contract.
Continuation Sheet is attached.
CHANGE ORDER SUMMARY
1. ORIGINAL CONTRACT SUM $1,015,718.00
Change Orders approved in ADDITIONS DEDUCTIONS 2. Net Change by Change Orders ($16,100.00)
previous months by owner 3. CONTRACT SUM TO DATE $999,618.00
TOTAL 16,100.00 4. TOTAL COMPLETED STORED TO DATE $542,272.00
Approved this Month (Column G)
No. Date Approved 5. RETAINAGE:
a. 10.00% of Completed Work $54,227.20
(Column D +E) 50 cpq, ID
b. 10.00% of Stored Material
2c)vQ 3,3i8,k0
(Column F) $0.00
TOTALS1 0.001 Total Retainage (Line 5a +5b) or $54
Net Change by Change Orders (Total in Column 1)
($16,100.00) 6. TOTAL EARNED LESS RETAINAGE $488,044.80
The undersigned Contractor certifies that to the best of the Contractor's (Line 4 less Line 5 Total)
knowledge, information, and belief the Work covered by this Application 7. LESS PREVIOUS CERTIFICATES FOR $458,181.90
for Payment has been completed in accordance with the Contract Docu- PAYMENT (Line 6 from prior Certificate)
ments, that all amounts have been paid by the Contractor for Work for S. CURRENT PAYMENT DUE $29,862.90
for which previous Certificates for Payment were issued and payments 9. BALANCE TO FINISH, PLUS RETAINAGE $511,573.20
received from the Owner, and that current payment shown herein is (Line 3 less Line 6)
now due.
CONTRACTOR: CENTRAL ENGINEERING CONSTRUCTION ASSOC., INC.
State of: Indiana County of: Hangck
BY: DATE: 23 (22 O Subscribed and Vm to before me this 22 day of Q 2008
Ka 4n Horth Powers, President Notary Public:
My Commission Expires: April 21, 2016 1
AMOUNT CERTIFIED
ARCHITECT'S CERTIFICATE FOR PAYMENT (Attached explanation if amount certified differs from the
amount applied for.)
In accordance with the Contract Documents, based on on -site observa- ARCHITECT: Zvi G� Z ad
tions and the data comprising the above application, the Architect certifies IIZt �O ry c f.
to the Owner that to the best of the Architect's knowledge, information, By: Date:
and belief the Work has progressed as indicated, the quality of the Work is This Certificate in not negotiable. The AMOUNT CERTIFIED is
is in accordance with the Contract Documents, and the Contractor is payable only to the Contractor named herein. Issuance, pay
entitled to payment of the AMOUNT CERTIFIED. ment and acceptance of payment are without prejudice to any
rights of the Owner or Contractor under this contract.
i
CONTINUATION SHEET AIA DOCUMENT G703 PAGE 2 OF 2 PAGES
PROJECT: FOUNDERS PARK INFRASTRUCTURE PHASE I APPLICATION NO.: 3
Job: 437 APPLICATION DATE: 25- Aug -08
PERIOD TO: 25- Aug -08
ENGINEER'S PROJECT NO.:
A B C D E F G H I
WORK COMPLETED MATERIALS TOTAL
FROM PRESENTLY COMPLETED BALANCE RETAINAGE
ITEM DESCRIPTION OF WORK SCHEDULED PREVIOUS THIS STORED AND STORE TO (IF VARIABLE)
NO. VALUE APPLICATION PERIOD (NOT IN TO DATE (G C) FINISH RATE
(D E) D OR E) (D+E +F) (C G)
1 Mobilization 40,806.00 23,806.00 23,806.00 58%1 17000.00 2380.60
2 Construction Staking 14,086.00 13,000.00 13,000.00 92%1 1086.00 1300.00
3 Clearing 55,307.00 55,307.00 55,307.00 100%1 0.00 5530.70
4 Earthwork 289,035.00 215,500.00 30,000.00 245,500.00 85%1 43535.00 24550.00
5 Erosion Control 38,151.00 24,000.00 24,000.00 63%1 14151.00 2400.00
6 Sanitary Sewer 35,110.00 34,110.00 1,000.00 35,110.00 100%1 0.00 3511.00
7 Storm Sewer 104,921.00 102,740.00 2,181.00 104,921.00 100% 0.00 10492.10
8 Concrete Curbs/Sidewalk 177,447.00 0.00 0.00 0% 177447.00 0.00
9 Asphalt Paving 138,189.00 0.00 0.00 0% 138189.00 0.00
10 Seeding 82,038.00 0.00 0.00 0% 82038.00 0.00
11 Bonds Insurance 40,628.00 40,628.00 40,628.00 100% 0,00 4062.80
12 Change Order #1: Asphalt 7,100.00 0.00 0.00 0% 7100.00 0.00
Concrete Curb /Sidewalks 9,000.00 0.00 0.00 0% 9000.00 0.00
TOTALS: $999,618.00 $509,091.00 $33,181.00 $0.00 $542,272.00 54°x6 $457,346.00 $54,227.20
PERCENT: 50.93% 3.32% 0.00%1 54.25% 1 45.75%
AFFIDAVIT AND WAIVER OF LIEN
Final Partial Payment to Follow
STATE OF INDIANA
County of HANCOCK
Karen Horth Powers being duly sworn states that she/he is the President of Central Engineering
Construction Associates, Inc. having contracted with the Carmel /Clay Board of Parks and
Recreation to furnish certain materials and/or labor as follows Site Improvement for a Project
known as Founders Park Infrastructure Phase 1, located in Carmel, IN 46032 and owned by
the Carmel/Clay Board of Parks and Recreation and does further state
PARTIAL WAIVER: that the final balance due from the owner is the sum of Twenty -Nine
Thousand Eight Hundred Sixty -Two and 90/100 Dollars ($29,862.90)
receipt of which is hereby acknowledged; or
the payment of which has been promised as the sole consideration
for this Affidavit and Partial Waiver of Lien which is given to and
for said amount, effective upon receipt of such payment;
FINAL WAIVER: that the final balance due from the owner is the sum of Dollars
receipt of which is hereby acknowledged; or
the payment of which has been promised as the sole consideration
for this Affidavit and Final Waiver of Lien which shall become
effective upon receipt of such payment.
THEREFORE, the undersigned waives and releases unto the Owner of said premises any and all
lien or claim whatsoever on the above described property and improvements thereon on account
of labor or material or both, furnished by the undersigned thereto, and further certifies that no
other party has any claim or right to a lien on account of any work performed or material
furnished to the undersigned for said project, and within the scope of this affidavit and waiver.
Karen Horth Powers
President
Title 11
Witness My Hand and Notarial Seal, this 2 2 day of t3 U, c i t 2008.
Notary Public
U -Ching Wu
Notary Public Printed Signature
My Commission Expires
April 21, 2016
County of Residence
Hamilton
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice of bill to be properly itemized must show; kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Purchase Order No.
361523 Lincoln Bank Terms
Attn: Max C Hank
y
905 Southfield Drive
Plainfield, IN 46168
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
8/25/08 App 3 Founders park infrastructure phase I Escrow Payment 3,318.10
Total 3,318.10
1 hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6
20_
Clerk- Treasurer
.7
Voucher No. Warrant No.
361523 Lincoln Bank Allowed 20
Attn: Max C Hank
p a) In Sum of
P.u. -W
ICI arse 1
�TION FOR
U nc��n �Gu'LCe.
-nd
PO# or INVOICE NO. ACCT #/TITLE AMOUNT Board Members
Dept
18807 App 3 5023990 3,318.10 1 hereby certify that the attached invoice(s), or
bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
28 -Aug 2008
Signature
3,318.10 Accounts Payable Coordinator
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund