1•.06 5023990 18807 APP #2 25,150.00 FOUNDERS PARKS INTRAS
i
sooz i o gnd
APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT aaAl
TO (OWNER): PROJECT: Founders Park Infrastructure Phase 1 APPLICATION NO. 2 DISTRIBUTION TO:
Carmel/ Clay Board of Parks and Recreation OWNER XX
Attn.: Mark Westermeler
1411 East 116th Street VIA (ARCHITECT): PERIOD TO: 712512008
Carmel, IN 46032
FROM: Central Engineering Construction Associates, Inc. ARCHITECTS C v
3862 N. Commercial Parkway PROJECT NO: AUG o 1 2008
Greenfield, IN 46140
CONTRACT FOR: SITE IMPROVEMENTS CONTRACT DATE: 22 -May -08 p 3y: _L_ Z__L
Application made for Payment, as shown below, in connection
CONTRACTOR'S APPLICATION FOR PAYMENT with the contract.
Continuation Sheet Is attached.
CHANGE ORDER SUMMARY
1. ORIGINAL CONTRACT SUM $1,015,718.00
Change Orders approved In ADDITIONS DEDUCTIONS 2. Net Change by Change Orders ($16,100.00)
previous months by owner 3. CONTRACT SUM TO DATE $999,618.00
TOTAL 4. TOTAL COMPLETED STORED TO DATE $5D9,091.00
Approved this Month (Column G)
No. Date Approved 5. RETAINAGE:
1 16,100.00 a. 10.00% of Completed Work $50,909.10
(Column D +E)
b. 10.00% of Stored Material
(Column F) U n(olr) $0.00
TOTALS 16,100.00 Total Retainage (Line 5a +5b) or 2., K $50,909.10
Net Change by Change Orders (Total in Column 1) LJ� 25
($16,100.00) 6. TOTAL EARNED L ESS RETAINAGE $458,181.90
The undersigned Contractor certifies that to the best of the Cantractor's (Line 4 less Line 5 Total)
knowledge, information, and belief the Work covered by this Application 7. LESS PREVIOUS CERTIFICATES FOR $231,831.90
for Payment has been completed In accordance with the Contract Docu- PAYMENT (Line 6 from prior Certificate)
ments, that all amounts have been paid by the Contractor for Work for 8. CURRENT PAYMENT DUE C F_ I YW<Y. $226,350.00
for which previous Certificates for Payment were Issued and payments 9. BALANCE TO FINISH, PLUS RETAINAGE $541,436.10
received from the Owner, and that current payment shown herein is (Line 3 less Line 6)
now due.
CONTRACTOR: CENTRAL ENGINEERING CONSTRUCTION ASSOC., INC.
Stale of Indiana County of: Hancock
BY: p j- DATE: 7! 2_'Q 08 Subscribed and m to before me this 2 s i'` day of July 2008
Karen Horth Powers, President Notary Public: ran^
My Commission Expires: April 21, 2016 J
AMOUNT CERTIFIED
ARCHITECT'S CERTIFICATE FOR PAYMENT (Attached explanation If amount certified differs from the
amount applied for.)
In accordance with the Contract Documents, based on on -site observa- ARCHITECT:
tions and the data comprising the above application, the Architect certifies
to the Owner that to the best of the Architect's knowledge, information, By: Date:
and belief the Work has progressed as indicated, the quality of the Work is This Certificate in not negotiable. The AMOUNT CERTIFIED is
Is in accordance with the Contract Documents, agOWtractor Is payable only to the Contractor named herein. Issuance, pay
entitled to payment of the AMOUNT CERTIFIEDDe3cription EQ ment and acceptance of payment are without prejudice to any
P.O. 16 F�07 right Uwner or Contractor under this contract.
G.L. I n(0 5,oQ t Central E% neeri n9 2:2(,;a)350,00
Line Li 6'1 col n V) 2 5. 1 5 O 00
c_�e, .r��s
Z Date
CONTINUATION SHEET AIA DOCUMENT G703 PAGE 2 OF 2 PAGES
PROJECT: FOUNDERS PARK INFRASTRUCTURE PHASE 1 APPLICATION NO.: 2
Job: 437 APPLICATION DATE: 25- Jul -08
PERIOD TO: 25-Jul-08
ENGINEER'S PROJECT NO.:
A B C D E F G H I
WORK COMPLETED MATERIALS TOTAL
FROM PRESENTLY COMPLETED BALANCE RETAINAGE
ITEM DESCRIPTION OF WORK SCHEDULED PREVIOUS THIS STORED AND STORED TO (IF VARIABLE)
NO. VALUE APPLICATION PERIOD (NOT IN TO DATE (G C) FINISH RATE
(D E) D OR E) (D +E+F) (C G)
1 Mobilization 40,806.00 23,806.00 23,806.00 58% 17000.00 2380.60
2 Construction Staking 14,086.00 7,000.00 6,000.00 13,000.00 92% 1086.00 1300.00
3 Clearing 55,307.00 55,307.00 55,307.00 100% 0.00 5530.70
4 Earthwork 289,035.00 65,500.00 150,000.00 215,500.00 75% 73535.00 21550.00
5 Eroslon Control 38,151.00 24,000.00 24,000.00 63% 14151.00 2400.00
6 Sanitary Sewer 35,110.00 34;110.00 34,110.001 97% 1000.00 3411.00
7 Storm Sewer 104,921.00 7,240.00 95,500.00 102,740.00 98% 2181.00 10274.00
8 Concrete Curbs/Sidewalk 177,447.00 0.00 0.00 0%1 177447.00 0.00
9 Asphalt Paving 138.189.001 0.00 0.00 0% 138189.00 0.00
10 Seeding 82,038.00 0.00 0.00 0% 82038.00 0.00
11 Bonds Insurance 40,628.00 40,628.00 40,628.00 100% 0.00 4062.80
12 Change Order #i: Asphalt 7,100.00 0.00 0% 7100.00 0.00
Concrete Curti /Sidewalks 9,000.00 0.00 0% 9000.00 0.00
TOTALS: $999,618.001 $257,591.00 $251,500.00 $0.00 $509,091.00 51% $400,527.00 $50,909.10
PERCENT: 25.T7%1 25.16% 0.00%1 50.93% 49.07%
CEIVED
AUG 0 1 2008
BY:
r"
AFFIDAVIT AND WAIVER OF LIEN
Final Partial Payment to Follow
STATE OF INDIANA
County of HANCOCK
Karen Horth Powers being duly sworn states that she/he is the President of Central Engineering
Construction Associates, Inc. having contracted with the Carmel/Clay Board of Parks and
Recreation to furnish certain materials and/or labor as follows Site Improvement for a Project
known as Founders Park Infrastructure Phase I, located in Carmel, IN 46032 and owned by
the Carmel /Clay Board of Parks and Recreation and does further state
PARTIAL WAIVER: that the final balance due from the owner is the sum of Two Hundred
Twenty -Six Thousand Three Hundred Fifty and 00 /100 Dollars
($226,350.00)
receipt of which is hereby acknowledged; or
the payment of which has been promised as the sole consideration
for this Affidavit and Partial Waiver of Lien which is given to and
for said amount, effective upon receipt of such payment;
FINAL WAIVER: that the final balance due from the owner is the sum of Dollars
receipt of which is hereby acknowledged; or
the payment of which has been promised as the sole consideration
for this Affidavit and Final Waiver of Lien which shall become
effective upon receipt of such payment.
THEREFORE, the undersigned waives and releases unto the Owner of said premises any and all
lien or claim whatsoever on the above described property and improvements thereon on account
of labor or material or both, finished by the undersigned thereto, and fin certifies that no
other party has any claim or right to a lien on account of any work performed or material
furnished to the undersigned for said project, and within the scope of this affidavit and waiver.
�enorth Powers
President
Title
Witness My Hand and Notarial Seal, this ZS4 da of 2008.
u R---
Notary Public
Li -Ching Wu
Notary Public Printed Signature
My Commission Expires
April 21, 2016
County of Residence
Hamilton
AUG 0 1 2008
BY:
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice of bill to be properly itemized must show; kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Purchase Order No. 18807
Lincoln Bank Terms
ATTN: max C Hank
905 Southfield Drive
Plainfield, IN 46168
Invoice Invoice Description
Date Number (or note attached invoice(s) or bill(s)) Amount
7/25/08 App 2 Founders park Infrastructure Phase I Escrow Pmt 25,150.00
Total 25,150.00
1 hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6
20_
Clerk- Treasurer
Voucher No. Warrant No.
Lincoln Bank Allowed 20
ATTN: max C Hank
905 Southfield Drive
Plainfield, IN 46168 In Sum of
4/
25,150.00
ON ACCOUNT OF APPROPRIATION FOR
106 Park Impact Fee Fund
PO# or INVOICE NO. ACCT #/TITLE AMOUNT Board Members
Dept
18807 App#2 5023990 25,150.00 1 hereby certify that the attached invoice(s), or
bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
i
4 -Aug 2008
CO Y'\
Signature
25,150.00 Accounts Payable Coordinator
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund