HomeMy WebLinkAbout167155 12/17/2008 CITY OF CARMEL, INDIANA VENDOR: 00351554 Page 1 of 1
ONE CIVIC SQUARE POINDEXTER EXCAVATING INC
CARMEL, INDIANA 46032 PO BOX 36399 CHECK AMOUNT: $16,684.91
INDIANAPOLIS IN 46236 -0399
�o CHECK NUMBER: 167155
CHECK DATE: 12/17/2008
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER f AMOUNT DESCRIPT
1205 4350900 19141 4 12,637.61 WEST SIDE ROAD IMPROV
206 4462300 19141 4 4,047.30 WEST SIDE ROAD IMPROV
s,
e
k
U.
I NA
CONSTRUCTION PROJECT INVOICE
DATE: December 8, 2008
COMPANY NAME: Poindexter Excavating, Inc.
AND ADDRESS PO Box 36399
Indianapolis, IN 46236
TELEPHONE NO.: (317) -823 -6837
FAX NO.: (317)- 823 -4662
PROJECT NAME: 131 Street, Misc. West Side Improvements
PROJECT NO.: 08 -03
INVOICE NO.: 4
Construction pay items as per Progress Pay Estimates No. 4 as shown on the
attached requests for parts A, B, C and D for work completed between the dates of
November 1, 2008 to November 30, 2008.
TOTAL PAY THIS ESTIMATE, Part A: $14,041.79 Iob4v, 12, 9' Es'1
TOTAL PAY THIS ESTIMATE, Part B: $4,397.00
TOTAL PAY THIS ESTIMATE, Part C: $938.70 7��'' %c�
TOTAL PAY THIS ESTIMATE, Part D: zee' el $100.00
TOTAL PAY: $19,477.49
MINUS 10% RETAINAGE: 1,947.75
TOTAL NOW DUE: $17,529.74
Submitted b i i rchitects and Engineers
toe
Project Project Representative signed name Date
MicyAf-c- A. Groats -I 1
Project Representative printed name Date
aj AL
C. of Carmel
Projectl
Sprang Mill Road an Dorse t
Roundabout
PoiMexter
ITEM DESCRIPTION UNIT QUANTITY UNIT TOTAL
NO. PRICE
1 CONSTRUCTION ENGINEERING LS 0. s6.W0.00 $000
2 MOBILIZATION AND DEMOBILIZATION LS 000 $25,000.00 $000
3 CLEARING RIGHT OF WAV LS 0. 52000000 $000
PAVEMENT REMOVAL SYS 000 $1500 SO..
5 1 EXCAVATION, COMMON CYS 000 $36.00 50.00
6 TEMPORARY CHECK DAM, STRAW BALES LFT 0.00 $100.00 $000
TEMPORARY DITCH INLFTPROTECTION EACH OW s-00 80.
S CHEMICALMODIFICATION, SOILS SVB 0.00 $590 5000
9 COMPACTED AGGREGATE, NO 53 TON 0. Sao. $o W
10 MILLING. ASPHALT, 1 121N. SYS ow
11 HMA SURFACE, TYPE C TON O.. $106.00 $0..
12 HMA INTERMEDIATE, TYPE C TON 0.00 5]3.00 $0.00
13 HMA BASE, TYPE B TON 55.12 $56.. ".672
14 111 MA INTER MEDIATE. OG. TYPE C TON O f $]D. 50.00
15 AS PHALT FOR TACK COAT TON 000 5S.. 50.00
16 CURB RAMP, CONCRETE,C SY6 0.. 5210. $D.W
1] CURB RAMP, CONCRETE, L SV5 0.. $13100 $0.00
18 SIDEWALK. CONCRETE, 41N. SYS 0. s51.. som
19 TDECORATIVECONCRETE TR UCK APRON SVS a'. $112W
20 CONCRETE CURB ENDTREATMENT EACH 0..
21 CURBTURNOUT EACH OW $255.. so..
22 MODIFIED ROLL CURB I' OW $16.W $D.W
23 CUR B AN D GUTTE R, CONCR ETE. TYPE I I LFT OW $14.. SD..
24 STRAI GHT CURB, CONCR ETE LFT 0.. $16.00 $0..
25 ROLL CURB. CONCRETE LFT 0 W $16. SD..
26 TOPSOIL CVs 0.. $10. $0..
27 SODDING SYS OW S3.W $0..
28 VALVE BOX, ADJUST TO GRADE EACH 0.. $300.. S) W
29 CASTING, ADJUSTTO GRADE EACH OW $5W. $0..
30 FIRE HYDRANT, RELOCATE EACH 00(1 $4,5W00 80.
31 DETOUR ROUTE MARKE R ASSEMBLY EACH 0.. $135.00 SO..
32 CONSTRUCTION SIGN, A EACH 0.. $210.00 SO..
33 CONSTRUCTION SIGN, B EACH 0 $6400 80..
34 MAINTAINING TRAFFIC LS 0.. $20,0... SO..
35 BARRICADE, III -A LFT 75 SO E48.. E3.6W.W
36 BARRICADE, IIFB LFT 8000 s60.. S- W
37 SIGNPOST. SQUARE, I, REINFORCED ANCHOR BASE LFT 0.00 $17.80 $0..
38 ISIGN. SHEET, ENCAPSULATED LENS WITH LEGEND, 0.060 IN, THICKNESS SFT 0. $23.10 $0..
39 SIGN, SHEET. ENCAPSULATED LENS WITH LEGEND. 0.1 W IN THICKNESS SFT 0. $26.4D 50..
40 IRRIGATION CONDUIT, 2 IN (UNDISTRIBUTED) LFT 0.. $22.80 80.
HANDHOLE, LIGHTING EACH 0. 51.1.. $0..
42 WIRE, N0.4, COPPER, IN PLASTIC DUCT, IN TRENCH.4 11C LFT 0. 522.00 SD..
43 DECORATIVE STREET LIGHT, WIRING AND INSTALIATION EACH 0. $10,]80.. 50..
LIGHTING POWER DISTRIBUTION PANEL EACH 0. $],1... 80.
45 TRANSVERSE MARKINGS. THERMOPLASTIC. CROSSWALK, WHITE, 241N. LFT 0. $10C 50..
46 LINE, THERMOPLASTIC, SOLID, WHITE, 41N. LFT 6]6.W 80.60 5405.60
47 NRANSVERSEMARKINGS, PAINT. SOLID, YELLOW CROSSHATCH LINE, 8 LFT 101. $5.
48 LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN LFT 123.. $0.80 $73 ED
49 SNOWPLOWABLE RAISED PAVEMENT MARKER EACH 0.. 5210. $0..
50 PAVEMENT MESSAGE MARKING, THERMOPLASTIC. TEETH' LFT 0.. $9.. $0.00
51 LINE, THERMOPLASTIC, BROKEN, WHITE, 61N. (3' LINE.3 GAP)
52 CONSTRUCTION SIGN, D EACH O.. $300.. $0.00
'S3 RELOCATE HYDRANT, CHANGE ORDER ITEM EACH 100 S2.77067 277067
PART 3A TOTAL: s+4.9a1 �s
MINUS RETAINAGE 81 A04.16
TOTAL $12.631.61
IRIGINAL
City o/ Carmel
Project No. 08 -03 B
RoanCatroat Bypass Lane, WB 116th Street 0 NB Spring Mill Roatl
Pointlexter
ITEM DESCRIPTION UNIT QUANTITY UNIT TOTAL
NO. PRICE
1 CONSTRUCTION ENGINEERING LS 0.00 $3.800.00 $0.00
2 MOBILIZATION AND DEMOBILIZATION LS 000 88,000.00 so DO
3 CLEARING RIGHT OF WAY LS 0.00 512,000.00 $0.00
q 0.00 $0.00
5 CURB AND GUT TER, REMOVE LFT 0.00 $6.00 $0.00
6 SIGN, SHEET, REMOVE EACH 000 $100.00 5000
7 0.00 SO80
8 INLET, REMOVE EACH 0.00 $500.00 $0.00
9 EXCAVATION, COMMON CYS 0.00 $46.00 $0.00
10 TEMPORARY EROSION AND SEDIMENT CONTROL, CURB INLET EACH 0.00 $130.00 $0.00
PROTECTION
it TE MPORARY SILT FENCE LFT 0.00 $200 $0.00
12 STRUCTURE BACKFILL, TYPE 1 CYS 0 D $75.00 $0.00
13 CHEMICAL MODIFICATION, SOILS SYS 0.00 $6.00 $0.00
14 COMPACTED AGGREGATE, NO 53, BASE TON 0.00 $31.00 $O.DO
15 MILLING, ASPHALT, 1 121N. SYS 0.00 $8.00 $0.00
16 HMA SURFACE. TYPE A TON 0.00 $154.00 $0,00
17 HMA SURFACE. TYPE C TON 0.00 $150.00 $000
18 HMA INTERMEDIATE, TYPE A TON 0.00 $84.00 $0,00
19 HMA INTERMEDIATE, TYPE C TON 0.00 $10000 $000
20 HMA INTERMEDIATE OG, TYPE C TON 0.00 $8180 $O. DO
21 HMA BASE, TYPE B TON 0.00 $71.00 $000
22 ASPHALT FOR TACK COAT TON 0.00 $740.00 $0.00
23 CURB RAMP, CONCRETE, G SYS 0.00 $19300 $080
24 CURB AND GUTTER. CONCRETE. TYPE III LFT 0.00 $25.00 $0. DD
25 CURB AND GUTTER, CONCRETE, TYPE II LFT 0.00 $1700 $000
26 DECORATIVE PAD. CONCRETE, 71N. LFT 0.00 $95.00 $0.00
27 TOPSOIL CYS 000 $1900 50.00
28 SODDING SYS 245.00 $3.00 $73500
29 PIPE, TYPE 2. CIRCULAR, 121N. LFT 0 D $7580 $0.00
30 PIPE END SECTION, 121N. EACH 0.00 $500.00 $0.00
31 CASTING, ADJUST TO GRADE EACH 0.00 $60000 $000
32 INLET. J10 EACH 0.00 $1,800.00 $0.00
33 INLET, M10 EACH 000 $1 BMW $0.00
34 MAINTAINING TRAFFIC LS 0.00 $8.800.00 $0.00
35 SIGN POST, SQUARE. 1, REINFORCED ANCHOR BASE LFT 000 $1760 $0.00
36 SIGN, SHEET, RELOCATE EACH 0.00 $71.50 $0.00
37 SIGN, SHEET, ENCAPSULATED LENS WTH LEGEND, 0OW IN THICKNESS SFT 0.00 $23.10 50.00
38 SIGN, SHEET, ENCAPSULATED LENS WITH LEGEND, 0.100 IN THICKNESS SFT 0.00 $26.40 $0.00
39 HANDHOLE EACH 000 5110000 $000
40 WRE. NOA COPPER, IN PLASTIC DUCT, IN TRENCH, 4 1/C LFT COO $22.00 $0.00
41 DECORATIVE STREET LIGHT, RELOCATION EACH 0.00 $3,85000 $0.00
42 PAVEMENT MESSAGE MARKINGS, REMOVE EACH 200 $96.00 $192.00
43 LINE, THERMOPLASTIC, BROKEN. WHITE, 41N, LFT 40.00 $1.70 $68.00
44 LINE, THERMOPLASTIC, SOLID. WHITE, 41N. LFT 100.00 51.70 $170.00
45 LINE, THERMOPLASTIC, SOLID, WHITE, B IN LFT 192.00 $280 $384.00
46 TRANSVERSE MARKINGS, THERMOPLASTIC. CROSSWALK LINE, 61N, LFT 32.00 $2.00 $64.00
47 PAVEMENT MESSAGE MARKINGS. THERMOPLASTIC, LANE INDICATION EACH 3.00 $15000 $450.00
ARROW
48 PAVEMENT MESSAGE MARKINGS. THERMOPLASTIC, WORD (ONLY) EACH 2.00 $165.00 $33000
49 LINE, THERMOPLASTIC, SOLID, WHITE, 121N. LFT 14.00 $4.00 $5600
50 LINE, THERMOPLASTIC, BROKEN, WHITE. 61N. (3 LINE. 3' GAP) LFT 6880 $3.00 $204.00
51 PAVEMENT MESSAGE MARKING, THERMOPLASTIC. 'FISHHOOK ARROW' EACH 400 $400.00 $1.600.00
52 PAVEMENT MESSAGE MARKING, THERMOPLASTIC, "SHARK'S TEETH LFT 76.00 $900 $144.00
PART 3B TOTAL: $4,397.00
MINUS 10 %RE7AINAGE 5439.70
TOTAL $3.957.30
j'RIGINAL
City of Carmel
project No. 08 -03 C
Additional Entry Lanes for Spring Mill Road and 131st Street Roundabout
Poindexter
ITEM DESCRIPTION UNIT QUANTITY PRICE TOTAL
1 Construction Engineering LS 0.00 $4,300.00 $0.00
2 Mobilization and Demobilization LS 0.00 $10,000.00 $0.00
3 Clearing Right -of -Way LS 0.00 $18,000.00 $0.00
4 Concrete Curb, Remove LFT 0.00 $8.00 $0.00
5 Concrete Center Curb, Remove SYS 0.00 $100.00 $0.00
6 Concrete Curb Ramp, Remove SYS 0.00 $20.00 $0.00
7 Sign and Support. Remove EA 0.00 $50.00 $0.00
8 Asphalt Milling, 1.5 in. SYS 0.00 $4.00 $0.00
9 Linear Grading LFT 0.00 $15.00 $0.00
10 Temporary Silt Fence LFT 0.00 $2.00 $0.00
11 Subgrade Treatment, Type IA SYS 0.00 $11.00 $0.00
12 Compacted Aggregate, No. 53, Base TON 0.00 $42.00 $0.00
13 HMA Surface, Type C TON 0.00 $128.00 $0.00
14 Widening with HMA, Type C TON 0.00 $14100 $0.00
15 HMA Surface, Type A TON 0.00 $138.00 $0.00
16 HMA Intermediate, Type A TON 0.00 $111.00 $0.00
17 Curb Ramp, Concrete SYS 0.00 $96.00 $0.00
18 Combined Curb and Gutter Type II LFT 0.00 $20.00 $0.00
19 Combined Curb and Gutter Type III LFT 0.00 $21.00 $0.00
20 Straight Concrete Curb LFT 0.00 $32.00 $0.00
21 Center Curb, D, Concrete SYS 0.00 $180.00 $0.00
22 Water kGAL 0.00 $100.00 $0.00
23 Topsoil CYS 0.00 $20.00 $0.00
24 Sodding, Nursery SYS 0.00 $3.00 $0.00
25 Pipe, Type 4, Circular, 6 in. Double Wall, Smooth Interior LFT 0.00 $10.00 $0.00
26 Aggregate for Underdrain CYS 0.00 $28.00 $0.00
27 Geotextiles for Underdram SYS 0.00 $100 $0.00
28 Construction Sign, A EA 0.00 $210.00 $0.00
29 Maintaining Traffic LSUM 0.00 $15,000.00 $0.00
30 Sign Post, Square, 1, Reinforced Anchor Base LFT 0.00 $17.60 $0.00
31 Sign Sheet, Encapsulated Lens with Legend, 0.080 in. SFT 0.00 $23.00 $0.00
32 Reset Decorative Street Sign Assembly EA 0.00 $2,090.00 $0.00
33 Sign, Sheet Relocation EA 0.00 $71.50 $0.00
34 Concrete Foundation with Grounding, 30 in Diameter x 96 in, EA 0.00 $2,200.00 $0.00
35 Reset Street Light Pale Assemly EA 0.00 $1,650.00 $0.00
36 Wire, No 4, Copper, In Plastic Duct, In Trench, 4 11C LFT 1 0.00 $22.00 $0.00
37 Line, Thermoplastic, Dotted White, 8 in, 2' Line, 2' Gap LFT 30.00 $2.00 $60.00
38 Line, Thermoplastic, Dotted White, 4 in. 2' Line, 6' Gap LFT 11.00 $1.70 $18.70
39 Line, Thermoplastic, Solid, White, 4 in. LFT 80.00 $1.70 $136.00
40 Line, Thermoplastic, Solid, Yellow, 4 in. LFT 0.00 $1.70 SO.00
41 Snowplowable Raised Pavement Marker EA 0.00 $200.00 $0.00
42 Pavement Message Markings, Thermoplastic, Lane Indication Arrow EA 2.00 $130.00 $260.00
43 Pavement Message Markings, Thermoplastic, Word (ONLY) EA 1.00 $170.00 $170.00
44 Transverse Markings, Thermoplastic, Crosswalk Line, 24 in. LFT 4200 $7.00 $29400
45 Transverse Markings, Thermoplastic, White Yield Line, 27 in. LFT 0.00 $9.00 $0.00
46 Restore Landscape and Irrigation System LSUM 0.00 $7,000.00 $0.00
PART 3C TOTAL: $938.70
MINUS 10% RETAINAGE $93.87
TOTAL $844.83
_.J 1 O'GIi R9AL
CIry of Cannel
Pmjact No. 08-03 D
Rourea4ot4 Bypass Lana for EB 131st Shaer to SB Illinois Street
Ppindeeer
ITEM DESCRIPTION UNIT QUANTITY UNIT TOTAL
1 Constmdlon Engtheering LS 000 53.800.00 $0.00
2 WNI.ation and De- ba-lion LS 000 57.000.00 $0.00
3 Clearing RighlaFVAy LS 0.00 $5,000.00 5000
4 Concrete Curb. Remove LFT 0.00 $8.00 $0.00
5 Gamete Curb Ramp, Remove SV5 000 550.00 50.00
6 Sign"' Support, Remove EA 2.00 $50.00 $IWO)
.7 Asphalt Milling, 1.5u, SYS 0 W 55.00 50.00
8 Linear Guiding LFT o.00 $15.00 $0.00
9 Temporary Drop Intel Protection EA 000 $200.00 50.00
10 Temporary Sift Fexe LFT 0.00 $2.00 $000
11 Subgrade Treatment. Type IA SYS 0.00 51200 $0.00
12 Compacted Aggregate. No. 53, Base TON 0.00 55200 $0.00
13 Colored and .Meted Con Its. T SYS 0.00 $112.00 $0.00
14 MA Surface. Type C TON 0.00 $17000 $0.00
15 NSd -mg .11 HMA, Type TON 0.00 5134.00 !000
16 HMA Surface, Type A TON 0.00 S1 T1.00 50.00
17 HMA Intermedale, Type A TON 0.00 $120.00 SOW
18 Cum Ramp, Conctele SYS BOD $189.00 SOW
19 Combined Curb are Gutter Type II LFT 000 $20.00 $0.00
20 ShaigN Coneate Curb LFT 0.00 53000 SOW
21 Center Curb. D. Concrete SYS 000 5258.00 $0.00
22 Water kGAL 000 $l W'O0 $000
23 Topsoil CVS 0.00 $20.00 5000
24 Sodding. Nursery SYS 000 $3.00 50.00
25 Rpe. Type 4, Ci-lar, 6 in. Double Wall, Smooth Interior LFT 000 $10.00 $0.00
26 Aggregate for UWem am CYS 0.00 !30.00 50.00
27 Geot -lea for Ureeroraln SYS 0.00 A5.OD !0.00
28 Structure No .2 1-SUM 0.00 E2, 500.00 SO .W
29 5tmdua No.3 -SUM 0.00 82.500.00 $000
30 Structure No .4 1-SUM BOB $600.00 $0.00
31 Centered- Sign, A EA 0 D $210.00 SOW
32 Maintaining Tmffw LSUM 0.00 510.000.00 5000
33 Sign Post, Square, 1, Reinforced A-, Base LFT 000 $17.60 $0.00
34 Sign Sheet, Encapsulated Lens with Legend, D.080 m. SFT 000 $23.10 $000
35 Sign, Sheet Re-- EA 000 $7150 $0.00
36 Concrete Foundation wth Groundug, W in Demeter. 96 in EA 000 $2.200.00 50.00
37 Reset Street Light Pole Assembly EA 0 O S1 650.00 $0.00
W We, No 4, Copper. In Pledic Dud. In Trench, 4 1 IC LFT 000 522.00 $0.00
39 Cable Dud Market EA 0 0 $150.00 5000
40 We, No 4. Copper. In 2'm. GaNs-ed Steel Conduit, 41 /C LFT 000 522.00 $000
41 Conduit Sleel, Galvanized, 2" LFT 0.00 $28.00 $000
42 Litre, Thermee Dotted Vane. 8 in. 2 Line. 2 Gap LFT 0 00 $5.00 saw
43 Line, Thermoplasuc, Dented Mile, 4m. 2 Litre, 6 Gap LFT 0.00 $2.00 SOW
44 Line, Thermoplastic, Solid, VMite.4 in. LFT 000 $100 $0.00
45 Snowpewawe Raised Pavement MsMer EA 000 5200.00 $0.00
46 Pavement Message Markings, Themeoplasbc, Lane Ireicalion A- EA 00D $150.OD 50.00
47 Pavement Message Markings, Then- Pastic, Nord (ONLY) EA 0.00 8200.00 $0.00
48 Tremvem Merkbgs, Themanuladic, Crosswalk Line. 24 in. LFT 0.00 57.00 $000
49 Tramverse Markings, Thermoplastic. V to Yiee Line. 27m LFT 000 59.00 5000
50 Restore Landscape aM Irdgehon System L.U. 0.00 57,00000 EO.00
PART 3D TOTAL: $100.00
MINUS 10% RETAINAGE $1
$90.00
PART 3A TOTAL OWED FOR NOVEMBER WORK $12.637.61
PART 3B TOTAL OWED FOR NOVEMBER WORK $3,957.30
PART 3C TOTAL OWED FOR NOVEMBER WORK $844.83
PART 3D TOTAL OWED FOR NOVEMBER WORK 590 .00
TOTAL OF ALL 4 PARTS $17,529.74
Project Represe live Acceptance Sgnature Dale
Conlre r Rep u live Applieumos 5 ignal Date
POINDEXTER
Excavating, Inc. e
INVOICE' S
PO Box 36399
Indianapolis, IN 46236 -0399 INVOICE 31912
(317) 823 -6837
FAX: (317) 823 -4662 INVOICE DATE: 12/8/2008
DUE DATE: 1/7/2009
Page 1 of 1
CITY OF CARMEL
MAYOR'S OFFICE
1 CIVIC SQUARE
CARMEL IN 46032
m
08 -043 Misc. Westside Road Improvements
City of Carmel
Project 08 -03
P0#1 9141
Quantities thru December 10, 2008
Application #4: Section 3A 1.00 14,041.79 14,041.79
nt a l A rO
Less ol. retoiiv1a9e -d 404• l
AMOUNT DUE: IL lj, l
This invoice is priced at our special T M rates. This pricing is offered with the understanding that no retainage will be withheld
and that payment will be made within 30 days of invoice date.
1.5% PER MONTH FINANCE CHARGE WILL APPLY ON UNPAID BALANCE AFTER 30 DAYS
*We are an Equal Opportunity Employer
POINDEXTER
7T5W77 7''
Excavating, Inc. s
INVOICE
PO Box 36399
Indianapolis, IN 46236 -0399 INVOICE 31915
(317) 823 -6837
FAX: (317) 823 -4662 INVOICE DATE: 12/8/2008
DUE DATE: 1/7/2009
Page 1 of 1
CITY OF CARMEL
MAYOR'S OFFICE
1 CIVIC SQUARE
CARMEL IN 46032
08 -043 Misc. Westside Improvements
City of Carmel
Project 08 -03
PO #19141
Quantities thru December 10, 2008
Application 4: Section 313 1.00 4,397.00 4,397.00
t*a +3a�
Bess ior. re� aih age <43a•
AMOUNT DUE
This invoice is priced at our special T M rates. This pricing is offered with the understanding that no retainage will be withheld
and that payment will be made within 30 days of invoice date.
1.5% PER MONTH FINANCE CHARGE WILL APPLY ON UNPAID BALANCE AFTER 30 DAYS
*We are an Equal Opportunity Employer***
POINDEXTER
Excavating, Inc.
INVOICE�
x
u
PO Box 36399
Indianapolis, IN 46236 -0399 INVOICE 31916
(317) 823 -6837
FA X: (317) 823 -4662 INVOICE DATE: 12/8/2008
DUE DATE: 1/7/2009
Page 1 of 1
CITY OF CARMEL
MAYOR'S OFFICE
1 CIVIC SQUARE
S C ARMEL IN 46 xy
08 -043 Misc. Westside Road Improvements
City of Carmel
Project #08 -03
P0#1 9141
Quantities thru December 10, 2008
Application #4: Section 3C 1.00 938.70 938.70
i 0 t !A IrYlt Q 3 F. '10
Less lDT reFaivia
AMOUNT DUE g4-43
This invoice is priced at our special T M rates. This pricing is offered with the understanding that no retainage will be withheld
and that payment will be made within 30 days of invoice date.
1.5% PER MONTH FINANCE CHARGE WILL APPLY ON UNPAID BALANCE AFTER 30 DAYS
*.We are an Equal Opportunity Employer
POINDEXTER
Excavating, Inc.
PO Box 36399
Indianapolis, IN 46236 -0399 a r a INVOICE 31917
(317) 823 -6837
FAX: (317) 823 -4662 INVOICE DATE: 12/15/2008
DUE DATE: 1/14/2009
Page 1 of 1
CITY OF CARMEL
MAYOR'S OFFICE
1 CIVIC SQUARE
CARMEL IN 46032
08 -043 Misc. Westside Road Improvements
City of Carmel
Project 08 -03
PO# 19141
Quantities thru December 10, 2008
Application #4: Section 3D 1.00 100.00 100.00
To�u,1 19 vent- l G o• 0 0
Len" 107 �-M i h Je 10.00>
AMOUNT DUEJ .00
This invoice is priced at our special T M rates. This pricing is offered with the understanding that no retainage will be withheld
and that payment will be made within 30 days of invoice date.
1.5% PER MONTH FINANCE CHARGE WILL APPLY ON UNPAID BALANCE AFTER 30 DAYS
*We are an Equal Opportunity Employer
Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995)
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
Poindexter Excavating, Inc.
Purchase Order No.
P6 Box 36399
Terms
Indianapolis, IN 46236
Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
12/8/08 Inv.#4 Spring Mill /Dorset RAB (A) $12,637.61
116th /Spring Mill (B) $3,957.30
131 st/Illinois(D) $90.00
Total 6,684.91
1 hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
VOUCHER NO. WARRANT NO.
ALLOWED 20
Peandl Excavating, Ins. IN SUM OF
PO Box 36399
Indianapolis, IN 46236
$16,684.91
ON ACCOUNT OF APPROPRIATION FOR
Department of Engineering
Board Members
PO# or INVOICE NO. ACCT #!TITLE AMOUNT
DEPT. I hereby certify that the attached invoice(s), or
bill(s) is (are) true and correct and that the
1914 Inv. #4 1205 -509 materials or services itemized thereon for
nv. 206- 4462300 which charge is made were ordered and
nV. 206 4462300 received except
20
Signature
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund