Loading...
HomeMy WebLinkAbout163954 09/17/2008 CITY OF CARMEL, INDIANA VENDOR: 356934 Page 1 of 1 0 ONE CIVIC SQUARE SIGNATURE CONSTRUCTION LLC, CHECK AMOUNT: $6,242.50 CARMEL, INDIANA 46032 720 3RD AVE SW CARMEL IN 46032 CHECK NUMBER: 163954 CHECK DATE: 9/17/2008 D ACCOUNT PO N UMBER INVOICE NUMBER AMOUNT DESCRIPTION 902. 4460805 6,242.50 RETAIL SITE #5 I APPLICATION AND CERTIFICATION FOR PAYMENT AIA DOCUMENT G70 PAGE ONE OF 2 PAGES TO OWNER Cannel Redevelopment Commissic PROJECT: Parcel 5B APPLICATION NO Draw Number 12 Distribution to: One Civic Square Phase I Carmel City Center Signature costs =OWNER Carmel, Indiana 46032 Motor Court =ARCHITECT PERIOD TO: 9/1/2008 X CONTRACTOR FROM CONTRACTOR: VIA ARCHITECT: Pedcor Design Signature Construction LLC 720 3rd Avenue S.W. PROJECT NOS: CSO Project 21010 Carmel, Indiana 46032 CONTRACT FOR: CONTRACT DATE 9/7/2007 CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certihes that to the best of the Contractor's knowledge, Application is made for payment, as shown below, in connection with the Contract. information and belief the Work covered by this Application for Payment has been Continuation Sheet, AIA Document G703, is attached. completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. 1. ORIGINAL CONTRACT SUM 2,841,86100 2. Net change by Change Orders S 0.00 CONTRACTOR: 3. CONTRACT SUM TO DATE (Line 1 t 2) 2,841,863.00 4. TOTAL COMPLETED STORED TO S 2,542,619.00 L Date; �Z By: Z 5. RETAINAGE: om Koon President a. 0.099 of Completed Work 251,169.30 Su scribed an worn to before me this 22nd day of Aug, 2008 (Column D E on G703) b. of Stored Material I LINDA BUCHANAN (Column F on G703) OTAR t Hancock County Total Retainage (Lines 5a+ 5b or 9E.�r My Commission Expires Total in Column I of G703) 251,1 69.30 AUCJuSi 20, 2011 6. TOTAL EARNED LESS RETAINAGE 2,291,449.70 In accordance with the Contract Documents, based on on -site observations and the data (Line 4 Less Line 5 Total) comprising the application, the Architect certifies to the Owner that to the best of the 7. LESS PREVIOUS CERTIFICATES FOR Architect's knowledge, information and belief the Work has progressed as indicated, PAYMENT (Line 6 from prior Certificate) 2,285,20710 the quality of the Work is in accordance with the Contract Documents, and the Contractor 8. CURRENT PAYMENT DUE 6.242.50 is entitled to payment of the AMOUNT CERTIFIED, 9, BALANCE TO FINISH, INCLUDING RETAINAGE 5 550,4{3.30 (Line 3 less Line 6) AMOUNT CERTIFIED S CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS (Attach anari I ifamoum certified dtffrr from the amount applied lninal all figvres nm this Total changes approved Appli lion and whe nunt tion.S ei that are changed to conform with the amount ceri feed) in previous months by Owner AR HTECT Total approved this Month By Date: TOTALS $0.00 $0.00 This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to de Uontractor named herein. Issuance, payment and acceptance of payment are without NET CHANGES by Change. Order $0.00 prejudice to any rights of the Owner or Contractor under this Contract. AIA DOCUMENT G702 -APPLICATION AND CERTIFICATION FOR PAYMENT 1992 EDITION AIA 01992 THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., N.W.. WASHINGTON, DC 20006 -5292 Users may obtain validation of this document by requesting a completed AIA Document D401 Certification of Document's Authenticity from the Licensee. G703 CONTINUATION SHEET Page 2of2 To: From: Project: Application No.: 13 Carmel Redevelopment Commission Signature Construction LLC Parcel 5B Application Date: 9/1/08 One Civic Square 720 3rd Avenue S.W. Phase I Carmel City Center Period To: 911/08 Carmel, Indiana 46032 Carmel, Indiana 46032 Motor Court Engineer's Project No. A B C D E F G H I Work Com leted Materials Total Presently Completed Balance Retainage Item Scheduled From Previous Stored and Stored To If Description of Work Value Application This Period (Not in To Date (G /C) Finish Variable D or E) (D +E +F) (C -G) 101 General Requirement 132,109.09 117,577.09 0.00 0.00 117,577.09 89% 14,532.00 11,757.71 Bonding 113,675.00 113,675.00 0.00 0.00 113,675.00 100% 0.00 11,367.50 Insurance 25,000.00 25,000.00 0.00 0.00 25,000.00 100% 0.00 2,500.00 102 Existing Conditions 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 103 Concrete 2,170,090.00 2,153,775.00 3,685.00 0.00 2,157,460.00 99% 12,630.00 215,746.00 104 Masonry 50,000.00 0.00 0.00 0.00 0.00 0% 50,000.00 0.00 105 Metals 19,368.00 0.00 0.00 0.00 0.00 0% 19,368.00 0.00 106 Wood, Plastics and Composites 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 107 Thermal and Moisture Protection 68,430.00 28,000.00 2,926.00 0.00 30,926.00 45% 37,504.00 0.00 108 Openings 6,100.00 0.00 0.00 0.00 0.00 0% 6,100.00 0.00 109 Finishes 26,360.00 0.00 0.00 0.00 0.00 0% 26,360.00 0.00 110 Specialties 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 111 Equipment 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 112 Furnishings 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 113 Special Construction 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 114 Conveying Equipment 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 121 Fire Suppression 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 122 Plumbing 31,000.00 0.00 0.00 0.00 0.00 0% 31,000.00 0.00 123 Heating, Ventilation AC 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 125 Integrated Automation 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 126 Electrical 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 127 Communications 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 128 Electronic Safety Security 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 131 Earthwork 89,640.00 0.00 0.00 0.00 0.00 0% 89,640.00 0.00 132 Exterior Improvements 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 133 Utilities 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 134 Transportation 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 140 Process Integration 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 141 Material Processing Handling Equip. 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 144 Pollution Control Equipment 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00 Construction Fee 1 110,090.91 1 97,980.91 1 (0.00)1 0.00 97,980.91 89% 12,110.00 9,798.09 2,841,863.00 2,536,008.00 6,611.00 0.00 2,542,619.00 89% 299,244.00 251,169.30 PARTIAL Payment to Follow AFFIDAVIT AND WAIVER OF LIEN STATE OF INDIANA SS: COUNTY OF HAMILTON Tom Koontz being duly sworn states that he is the President of SIGNATURE CONSTRUCTION, LLC having contracted to furnish certain materials and /or labor as follows: Site Development for a project known as Parcel 5B Phase I Carmel City Center Motor Court located at CARMEL, IN and owned by Carmel Redevelopment Commission and does further state: PARTIAL WAIVER: that the balance due from the owner is the sum of six thousand two hundred forty two dollars and fifty cents (6,242.50) the payment of which has been promised as the sole consideration for this Affidavit and Partial Waiver of Lien which is given to and for said amount, effective upon receipt of such payment. THEREFORE, the undersigned waives and releases unto the Owner of said premises any and all lien or claim whatsoever on the above described property and improvements thereon on account of labor or material or both, furnished by the undersigned thereto, and further certifies that no other party has a any claim or right to a lien on account of any work performed or material furnished to the undersigned for said project, and within the scope of this affidavit and waiver. SIGNATURE CONSTRUCTION, LLC TqA Koontz President Subscribed and sworn to before me this: S avo� Notary Public: xx-e4Aa� ;�arPG•. LINDA BUCHANAN NOTARY Hancock County My Commission Expires •�OFiNO;� August 20, 2011 Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by ,whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Purchase Order No. 7 Zo Terms C` t N `t 3Z Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 2 8 s N 4- PG'e-e r �sQ Z L/ Total (v 2 y2 so I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. ALLOWED 20 S r�via ..L (_6nJ N VC�Io� LGC IN SUM OF ZLf -z so ON ACCOUNT OF APPROPRIATION FOR 4' 4q&6F05 Board Members PO# or INVOICE NO. ACCT #/TITLE AMOUNT DEPT. I hereby certify that the attached invoice(s), or 9 a 2 4 q o gos (v Z y?. s° bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except 20 Signa re D l/ ec Cost distribution ledger classification if Title claim paid motor vehicle highway fund