HomeMy WebLinkAbout157666 03/19/2008 F CITY OF CARMEL, INDIANA VENDOR: 356934 Page 1 of 1
ONE CIVIC SQUARE SIGNATURE CONSTRUCTION LLC CHECK AMOUNT: $141,672.19
e CARMEL INDIANA 46032
720 3RD AVE SW
CARMEL IN 46032 CHECK NUMBER: 157666
CHECK DATE: 3/19/2008
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
902 4460805 141,672.19 RETAIL SITE #5
E
jI
APPLICATION AND CERTIFICATION FOR PAYMENT A.IA DOCUMENTG702 PAGE ONE OF 2 PAGES
TO OWNER: Carmel Redevelopment Commission PROJECT: Parcel 513 APPLICATION NO: Draw Number 5 Distribution to:
One Civic Square Phase I Carmel City Center Signature costs OWNER
Carmel, Indiana 46032 Motor Court =ARCHITECT
PERIOD TO: 2/21/2008 7C CONTRACTOR
FROM CONTRACTOR: VIA ARCHITECT. Pedcor Design 0
Signature Construction LLC
720 3rd Avenue S.W. PROJECT NOS: CSO Project 21010
Carmel, Indiana 46032
CONTRACT FOR: CONTRACT DATE: 9/7/2007
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best oftbe Contractor's knowledge,
Application is made for payment, as shown below, in connection with the Contract. information and belief the Work covered by this Application for Payment has been
Continuation Sheet, AIA Document 6703, is attached. completed in accordance with the Contract Documents, that all amounts have bee LINDA BUCHANAN
the Contractor for Work for which previous Certificates for Payment were issued io a•._
payments received tiom the Owner, and that current payment shown herein is now Ise: Hancock County
My Commission Expires
L UKIGINAL CONTRACT SUM S 2,841,863.00 .'F August 20, 2011
2. Net change by Change Orders U.00 CONTKAC'I'OK:
3. CONTRACT SUM'I'O DA'I E (Lme I t 2)
4. '1'01'AL COMP LE'I ED ST'ORED'TU
By; Date:
5. REIAINAGE' e rte
a. 0.0998 of Completed Work S 179,465.86 Subscribed and swom to before me this 25th day of February, 2007
o umn D E on G703)
b. of Stored Material S
o umn F on G703)
total Retamage tLines �a+ �o or
Total in Column 1 of G703) 179,465.86
6. 'TOTAL EAKNED LESS REI AINAGE In accordance with the Contract Documents, based on on -site observations and the data
(Line 4 Less Line 5 Dotal) comprising the application, the Architect certifies to the Owner that to the best of the
7. LESS PREVIOUS CER'I'IF'ICA'I'ES FOR Architect's knowledge, information and beliefthe Work has progressed as indicated,
PAYMENT (Line 6 from prior Certificate) S 1,477,520.58 the quality of the Work 1s in accordance with the Contract Documents, and the Contractor
8. CURRENT PAYMENT• DUE 141 is entitled to payment of the AMOUNT CER "fiFIED.
9. BALANCE TO FINISH, INCLUDING RE'TAINAGE
(Line 3 less Line 6) AMOUNT CEK I IFIED i may 2 ,1 9
(Atmch espl lion J amount certified differs from the amount applied. Initial all figures on this
ota changes approve App(icat
in previous months by Owner AKC
1'EC'I':
n and o the C ulio Sheel that are changed to conform with the amount cerlified.)
Total approved this Month By. Date:
TOTALS $0.00 $0.00 This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
Lontractor nameu nerem. issuance, payment anu acceptance or payment are worroui
NET CHANGES by Change Order $0.00 prejudice to any rights of the Owner or Contractor under this Contract.
A €A DOCUMENT G702 APPLICATION AND CERTIFICATION FOR PAYMENT 1992 EDITION AIA 01992 THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW, WASHINGTON, DC 20006 -5292
Users may obtain validation of this document by requesting a completed AIA Document D401 Certification of Document's Authenticity from the Licensee.
G703 CONTINUATION SHEET Page 2 cf 2
To: From:. Project: Application No. 7 0
Carmel Redevelopment Commission Signature Construction LLC Parcel 5B Application Date: 2/21/08
One Civic Square 720 3rd Avenue S.W. Phase I Carmel City Center Period To: 2/21/08
Carmel, Indiana 46032 Carmel, Indiana 46032 Motor Court Engineer's Project No.
A B C D E F G H I
Work Co pleted Materials Total
Presently Completed Balance Retainage
Item Scheduled From Previous Stored and Stored To If
Description of Work Value Application This Period (Not in To Date (G /C) Finish Variable
D or E) (D+EhF) (C -G)
101 General Requirement 132,109.09 75,302.18 7,926.55 0.00 83,228. 63% 48,880.36 8,322.87
Bonding 113,675.00 113,675.00 0.00 0.00 113,675.00 100% 0.00 11,367.50
Insurance 25,000.00 25,000.00 0.00 0.00 25,000.0 100 0.00 2,500.00
102 Existing Conditions 0.00 0.00 0.00 0.00 0.00 0$ 0.00 0.00
103 Concrete 2,170,090.00 1 149,487.00 0.00 1,511,104.0 70% 658,986.00 151,110.40
104 Masonry 50,000.00 0.00 0.00 0.00 0.00 0 9 6 50,000.00 0.00
105 Metals 19,368.00 0.00 0.00 0.00 0.00 0% 19,368.00 0.00
106 Wood, Plastics and Composites 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
107 Thermal and Moisture Protection 68,430.00 4,000.00 0.00 0.00 4,000.00 6% 64,430.00 0.00
108 Openings 6,100.00 0.00 0.00 0.00 0.00 0% 6,100.00 0.00
109 Finishes 26,360.00 0.00 0.00 0100 0.00 0% 26,360.00 0.00
110 Specialties 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
111 Equipment 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
112 Furnishings 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
113 Special Construction 0.00 0.00 0.00 0.00 0.00 0 9 6 0.00 0.00
114 Conveying Equipment 0.00 0.00 0.00 0.00 0.00 0S6 0.00 0.00
121 Fire Suppression 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
122 Plumbing 31,000.00 0.00 0.00 0.00 0.00 0% 31,000.00 0.00
123 Heating, Ventilation AC 0.00 0.00 0.00 0.00 0100 0% 0.00 0.00
125 Integrated Automation 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
126 Electrical 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
127 Communications 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
128 Electronic Safety Security 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
131 Earthwork 89,640.00 0.00 0.00 0.00 0.00 0% 89,640.00 0.00
132 Exterior Improvements 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
133 utilities 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
134 Transportation 0.00 0.00 0.00 0.00 0.00 Oak 0.00 0.00
140 Process Integration 0.00 0.00 0.00 0.00 0.00 0% 0.00 0.00
141 Material Processing Handling Equip. 0.00 0.00 0.00 0.00 0,.00 0% 0.00 0.00
144 Pollution Control Equipment 0.00 0.00 0.00 0.00 0.0.0 0% 0.00 0.00
Construction Fee 110,090.91 1 61,650.91 (0.00) 0.00 61,650.91 56$ 48,440.00 6,165.09
2,841,863.00 1,641,245.09 157,413.55 0.00 1,798,658.64 63% 1,043,204.36 179,465.86
PARTIAL
Payment to Follow
AFFIDAVIT AND WAIVER OF LIEN
STATE OF INDIANA
SS:
COUNTY OF HAMILTON
Steve Warne being duly sworn states that he is the Vice President of SIGNATURE
CONSTRUCTION, LLC having contracted to furnish certain materials and /or labor as
follows: Site Development for a project known as Parcel 5B Phase I Carmel City
Center Motor Court located at CARMEL, IN and owned by Carmel Redevelopment
Commission and does further state:
PARTIAL WAIVER: that the balance due from the owner is the sum of one
hundred forty one thousand six hundred seventy —two
dollars and nineteen cents the payment of which has been
promised as the sole consideration for this Affidavit and
Partial Waiver of Lien which is given to and for said
amount, effective upon receipt of such payment.
THEREFORE, the undersigned waives and releases unto the Owner of said premises any
and all lien or claim whatsoever on the above described property and improvements
thereon on account of labor or material or both, furnished by the undersigned thereto, and
further certifies that no other party has a any claim or right to a lien on account of any
work performed or material furnished to the undersigned for said project, and within the
scope of this affidavit and waiver.
SIGNATURE CONSTRUCTION, LLC
toff "P'
LINDA BUCHANAN
teven Warne °rpA"
Hancock County
My Commission Expires
Au ust 20, 2011
Vice President
Subscribed and sworn to before me this: 9 6 ADO P`
Notary Public:
Prescribed b{; State Board of Accounts City Form No. 201 (Rev. 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
(0- s14 c Purchase Order No.
�Ve CJ Terms
(Q0 3Z Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
2
/4' la
P4,- I S'Q M� Co�.� 1 N! 72
Total L 14-. 2a '72
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in`a rdance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
VOUCHER NO. WARRANT NO.
ALLOWED 20
L`c IN SUM OF
t
Tit/ �f Z
ON ACCO LINT OF PROPRIATION FOR
1�
yqlaokaS
Board Members
PO# or INVOICE NO. ACCT #!TITLE AMOUNT
DEPT. I hereby certify that the attached invoice(s), or
c O' bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
11 06-
Sign
Cost distribution ledger classification if T
claim paid motor vehicle highway fund