HomeMy WebLinkAbout164135 09/30/2008 CITY OF CARMEL, INDIANA VENDOR: 00350562 Page 1 of 1
e� ONE CIVIC SQUARE AMERICAN STRUCTURE POINT, INC
CARMEL, INDIANA 46032 7260 SHADELAND STATION CHECK AMOUNT: $461,362.08
o� INDIANAPOLIS IN 46256 -3917 CHECK NUMBER: 164135
CHECK DATE: 9/30/2008
DEPAR AC COUNT PO NUMBER INVOICE NU MBER AMOUNT DESCRIPTION
920 R4470203 18327 35054 150',860.69 KEYSTON RECONSTRUCTIO V
v'920 R4470403 18327 35054 151,766.89 KEYSTON RECONSTRPCTIO/
920 4470301 18346 35228 88,414.20 DESIGN SERVICE
X920 R4470601 18301 35229 70,320.30 136TH DESIGN /ROW SERI✓
cS
Remit to:
7260 Shadeland Station
Indianapolis, IN 46256 -3957
AMERICAN TEL 317.547.5580
F STRUCTUREPOINT FAX 317.543.0270
N C. www.structurepoint.com
Federal Tax ID: 35- 1127317
Invoice Number: 35228
September 26, 2008
City of Carmel Re: Job IN20030661
Attn: Engineering Department Keystone Ave Expressway
One Civic Square 96th St to 146th Street (Keystone Parkway)
Carmel, IN 46032
Total Due This Invoice (see breakdown below) 88,414.20
Consulting Services from August 01, 2008 tlirough August 31, 2008
Billing Group: 031
Additional Services #2007.11(4470301)
PO #E18346
Billing Fee:$1,948,060.00
Phase Percent
Phase Fee Complete Fee Earned Prior Billink Current Fee
Road Design $1,263,060.00 19.00 $239,981.40 $151,567.20 $88,414.20
Lighting Design $40,000.00 0.00 $0.00 $0.00 $0.00
Conceptual Drive "Through Videos $50,000.00 0.00 $0.00 $0.00 $0.00
Bridge Design $271,000.00 25.00 $67,750.00 $67,750.00 $0.00
Retaining Wall Design $324,000.00 0.00 $0.00 $0.00 $0.0
Phase Total: $88,414.20
TOTAL. AMOUNT DUE FOR BILLING GROUP 88,414.20
TOTAL PROJECT INVOICE AMOUNT: $88 ,414.20
Very truly yours,
merican Structurepoint, Inc.
J. Samuel Balog, PE
Indianapolis, Indiana Columbus, Ohio South Bend, Indiana
American Structurepomt, Inc. Invoice: 35228
Project: IN20030661 September 26, 2008
Page 2 of 2
Aged Receivables:
't
Current 31 -60 Days 61 -90 Days 91 -120 Days >120 Days
191,335.70 0.00 0.00 0.00 0.00
Full payment of this invoice is due within 30 days from lire invoice date.
Interest at the rate of 1.5% per month (525.00 1month ininimunt) plus any /all collection costs/attarney costs may be
charged if payment is not received within 60 days from the invoice dale.
Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
American Structurepoint, Inc. Purchase Order No. 18346
7260 Shadeland Station Terms
Indianapolis IN 46256 Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
09/26/08 35228 Keystone Reconstruction Project $88,414.20
Design Services for 116th Street
Project 07 -08
Additional Services #2007.11
Total $88,414.20
1 hereby certify that the attached invoice(s), or bills(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
VOUCHER NO. WARRANT NO.
American Structurepoint, Inc. ALLOWED 20
7260 Shadeland Station IN THE SUM OF
Indianapolis IN 46256
88,414.20
ON ACCOUNT OF APPROPRIATION FOR
American Structurepoint, Inc.
PO# or INVOICE NO. ACCT #/TITLE AMOUNT Board Members
DEPT.#
18346 35228 4470301 $88,414.20
1 hereby certify that the attched invoice(s), or
bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
September 29 20 08
/,g,/
Total $88 ,414.20 Signature
Cost distribution ledger classification if Cit En
claim paid motor vehicle highway fund Title
Remit to:
7260 Shadeland Station
Indianapolis, IN 46256 -3957
AMERICAN TEL 317.547.5580
STRUCTUREPOINT FAX 317.543.0270
INC. www.structurepoint.com
Federal Tax ID: 35- 1127317
Invoice Number: 35229
September 26, 2008
City of Carmel Re: Job IN20030661
Attn: Engineering Department Keystone Ave Expressway
One Civic Square 96th St to 146th Street (Keystone Parkway)
Carmel, IN 46032
Total Due This Invoice (see breakdown below): Y 70,320.30
Consulting Services from August 01, 2008 through August 31, 2008
Billing Group: 017
Additional Services #52 (4470601)
PO #18301
Billing Fee: $994,520.00
Phase Percent
Phase Fee Complete Fee Earned Prior BillinK Current Fee
136th Street Interchange Final Road Design $543,240.00 94.00 $510,645.60 $488.916.00 $21,729.60
136th Street Interchange Final Bridge Design $145,890.00 90.00 $131,301.00 $116,712.00 $14,589.00
Keystone Parkway over Cool Creek Reh Final Design $123,390.00 95.00 $117,220.50 $1 13,518.80 $3,701.70
136th Street Retaining Wall Design $162,000.00 75.00 $121,500.00 $97,200.00 $24,300.00
136th Street Lighting Design $20,000.00 80.00 $16,000.00 $10,000.00 $6,000.00
Phase Total: $70,320.30
TOTAL AM.OU 5TIDUE FdR BILL1IIIG GROUP $70,320.30
TOTAL PROJECT INVOICE AMOUNT: $70,320.30
Very truly yours,
American Structurepoint, Inc.
J. Samuel Balog, PG
Indianapolis, Indiana Columbus, Ohio South Bend, Indiana
American Structurepoint, Inc. Invoice: 35229
Project: IN20030661 September 26, 2008
Page 2 of 2
Aged Receivables:
i
Current 31 -60 Days 61 -90 Days 91 -120 Days >120 Days
261,656.00 0.00 0.00 0.00 0.00
Fall payment of this invoice is due within 30 days from the invoice date.
Interest at the rate of 1.5% per month (525.00 1north minimum) plus any /all collection costs/ attorney costs may be
charged if payment is not received within 60 days from the invoice date.
Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
American Structurepoint, Inc. Purchase Order No. 18301
7260 Shadeland Station Terms
Indianapolis IN 46256 Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
09/26/08 35229 Keystone Reconstruction Project $70,320.30
136th Street Engineering Design Services
Project 07 -08
Additional Services #52, 2007.2
Total $70,320.30
I hereby certify that the attached invoice(s), or bills(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
VOUCHER NO. WARRANT NO.
American Structurepoint, Inc. ALLOWED 20
7260 Shadeland Station IN THE SUM OF
Indianapolis IN 46256
70,320.30
ON ACCOUNT OF APPROPRIATION FOR
American Structurepoint, Inc.
PO# or INVOICE NO. ACCT #/TITLE AMOUNT Board Members
DEPT.#
18301 35229 4470601 $70,320.30
I hereby certify that the attched invoice(s), or
bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
September 29 20 08
Total $70,320.30 Signature
Cost distribution ledger classification if Cit En
claim paid motor vehicle highway fund Title
Remit to:
7260 Shadeland Station
Indianapolis, IN 46256 -3957
O AMERICAN TEL 317.547.5580
F_]® STRUCTUREPOINT FAX 317.543.0270
NC www.structurepoint.com
�El Invoice Number: 35054 Federal Tax ID: 35- 1127317
September 22, 2008
City of Carmel
Attn: Mr. Mike McBride Project Number: IN20080349
One Civic Square
Carmel, IN 46032
Re: Keystone Avenue Reconstruction: 106th Street
126th Street CI
Carmel, IN
Additional Services 2007.8
P.O. 18327
Dear Mr. Mike McBride,
This is an invoice for engineering and/or architectural services for the above referenced project through August 31, 2008. Full payment
of this invoice is due within 30 days from the invoice date.
Total Due This Invoice (see breakdown below): 302,627.58
106th Street Keystone Avenue CI
Professional Services
Anjam Barkat Masih 90.00 hrs. $80.00 /hr. $7,200.00
Bart A. Harvey 63.50 hrs. $80.00 /hr. $5,080.00
Brittany N. Scherer 44.00 hrs. $65.00 /hr. $2,860.00
Craig M. Parks 2.00 hrs. $135.00 /hr. $270.00
David A. Day 2.00 hrs. $135.00 /hr. $270.00
David P. Machala 150.00 hrs. $90.00 /hr. $13,500.00
Dongzhan (Jenny) Zhou 1.00 hrs. $90.00 /hr. $90.00
James D. Garretson 10.00 hrs. $80.00 /hr, $800.00
Jeffery R. Reeves 15.00 hrs. $90.00 /hr, $1,350.00
Jeffrey R. Swenson 1.50 hrs. $135.00 /hr, $202.50
Joshua A. McCormick 12.00 hrs. $80.00 /hr, $960.00
Kenneth R. Olson 161.00 hrs. $80.00 /hr. $12,880.00
Kyle P. O'Brien 160.00 hrs. $80.00 /hr. $12,800.00
Marvin Sean Porter 7.00 hrs. $135.00 /hr. $945.00
Matthew I. Heidenreich 85.50 hrs. $80.00 /hr. $6,840.00
Melissa L. Walker 34.50 hrs. $65.00 /hr. $2,242.50
Phillip A. Sundling 168.00 hrs. $80.00 /hr. $13,440.00
Rodrigo M. Pizarro III 56.00 hrs. $80.00 /hr. $4,480.00
Samory D. White 85.50 lirs. $80.00 /hr, $6,840.00
Walter A. Williams 88.00 hrs. $65.00 /hr. $5,720.00
Zachary L. Piercy 32.00 hrs. $65.00 /hr. $2,080.00
Indianapolis, Indiana Columbus, Ohio South Bend, Indiana
American Structurepoint, Inc. Invoice: 35054
Project: IN20080349 September 22, 2008
Page 2 of 4
$100,850.00
Professional Overtime
Anjam Barkat Masih 15.00 hrs. $92.00 /hr. $1,380.00
Bart A. Harvey 16.50 hrs. $92.00 /hr. $1,518.00
Brittany N. Scherer 12.00 hrs. $74.75 /hr. $897.00
Craig A. Shroyer 8.00 hrs. $103.50 /hr. $828.00
David P. Machala 104.00 hrs. $103.50 /hr. $10,764.00
Joshua R. Reeves 10.50 hrs. $74.75 /hr. $784.88
Kenneth R. Olson 97.50 hrs. $92.00 /hr, $8,970.00
Kyle P. O'Brien 69.00 hrs. $92.00 /hr. $6,348.00
Matthew I. Heidenreich 4.50 hrs. $92.00 /hr. $414.00
Phillip A. Sundling 91.50 hrs. $92.00 /hr. $8,418.00
Rodrigo M. Pizarro II1 20.00 hrs. $92.00 /hr. $1,840.00
Samantha A. Hess 8.00 hrs. $74.75 /hr. $598.00
Samory D. White 27.50 hrs. $92.00 /hr. $2,530.00
Walter A. Williams 19.75 hrs. $74.75 /hr. $1,476.31
Zachary L. Piercy 22.00 hrs. $74.75 /hr. $1,644.50
$48,410.69
Reimbursables
Nuclear Guage Usage 32.00 50.00 $1,600.00
$1,600.00
American Structurepoint, Inc. Invoice: 35054
Project: IN20080349 September 22, 2008
Page 3 of 4
126th Street Keystone Avenue CI
Professional Services
Anjam Barkat Masih 80.00 hrs. $80.00 /hr. $6,400.00
Bart A. Harvey 104.50 hrs. $80.00 /hr. $8,360.00
Brittany N. Scherer 44.00 hrs. $65.00 /hr, $2,860.00
Craig M. Parks 4.00 hrs. $135.00 /hr, $540.00
Daniel S. Osborn 3.00 hrs. $80.00 /hr. $240.00
David A. Day 9.00 hrs. $135.00 /hr. $1,215.00
David C. Lancet 160.00 hrs. $90.00 /hr. $14,400.00
Dongzhan (Jenny) Zhou 1.00 hrs. $90.00 /hr. $90.00
Heather L. Grimstad 80.00 hrs. $80.00 /hr. $6,400.00
James D. Stevenson 23.50 hrs. $65.00 /hr. $1,527.50
Jeffery R. Reeves 17.00 hrs. $90.00 /hr. $1,530.00
Joshua A. McCormick 152.00 hrs. $80.00 /hr. $12,160.00
Joshua R. Reeves 56.00 hrs. $65.00 /hr. $3,640.00
Kenneth R. Olson 7.00 hrs. $80.00 /hr. $560.00
Marvin Sean Porter 3.50 hrs. $135.00 /hr. $472.50
Melissa L. Walker 34.50 hrs. $65.00 /hr. $2,24150
Michael H. Wenning 8.00 hrs. $135.00 /hr, $1,080.00
Paul M. Rosetta 119.00 hrs. $80.00 /hr. $9,520.00
Rodrigo M. Pizarro III 99.50 hrs. $80.00 /hr. $7,960.00
Ryan M. Cummins 4.00 hrs. $90.00 /hr. $360.00
Samory D. White 32.00 hrs. $80.00 /hr. $2,560.00
Stephen C. Rushfeldt 88.00 hrs. $65.00 /hr. $5,720.00
Zachary L. Piercy 56.00 hrs. $65.00 /hr. $3,640.00
$93,477.50
Professional Overtime
Anjam Barkat Masih 43.00 hrs. $92.00 /hr. $3,956.00
Bart A. Harvey 72.50 hrs. $92.00 /h $6,670.00
Brittany N. Scherer 9.50 hrs. $74.75 /hr. $710.13
Christopher B. Dowty 8.00 hrs. $92.00 /hr. $736.00
Daniel S. Osborn 3.00 hrs. $80.00 /hr. $240.00
David C. Lancet 108.50 hrs. $103.50 /hr, $11,229.75
Heather L. Grimstad 41.50 hrs. $92.00 /hr. $3,818.00
Joshua A. McCormick 9 1. 00 hrs. $92.00 /hr. $8,372.00
Joshua R. Reeves 20.50 hrs. $74.75 /hr, $1,532.38
Paul M. Rosetta 57.75 hrs. $92.00 /h $5,313.00
Rodrigo M. Pizarro III 54.00 hrs. $92.00 /hr. $4,968.00
Samory D. White 7.00 hrs. $92.00 /hr. $644.00
Stephen C. Rushfeldt 32.50 hrs. $74.75 /hr. $2,429.38
Thomas J. Mobley, II 10.00 hrs. $92.00 /hr. $920.00
Timothy P. Conarroe 24.00 hrs. $103.50 /hr. $2,484.00
Zachary L. Piercy 33.00 hrs. $74.75 /hr. $2,466.75
$56,489.39
American Structurepoint, Inc. Invoice: 35054
Project: IN20080349 September 22, 2008
Page 4 of 4
Reimbursables
Nuclear Guage Usage 36.00 50.00 $1,800.00
$1,800.00
TOTAL 126TH STREET KEYSTONE AVENUE CI $302,627.58
TOTAL AMOUNT DUE FOR BILLING GROUP $302,627.58
TOTAL PROJECT INVOICE AMOUNT. $302,627.58
Very truly yours,
American Structurepoint, Inc.
f�4
Todd A. Rutledge,
CONTRACT AMOUNT: 2,987,368.00
LESS PREVIOUS INVOICES: 725,700.19
LESS THIS INVOICE: $302,627.58
AMOUNT REMAINING: $1
Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
American Structurepoint, Inc. Purchase Order No. 18327
7260 Shadeland Station Terms
r Indianapolis IN 46256 Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
09/22/08 35054 Keystone Reconstruction Project $302,627.58
Construction Inspection 106th 126th
Project 07 -08, Additional Services 2007.8
Total $302,627.58
I hereby certify that the attached invoice(s), or bills(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
1
VOUCHER -NO. WARRANT NO.
American Structurepoint, Inc. ALLOWED 20
7260 Shadeland Station IN THE SUM OF
Indianapolis IN 46256
302,627.58
ON ACCOUNT OF APPROPRIATION FOR
American Structurepoint, Inc.
PO# or INVOICE NO. ACCT /TITLE AMOUNT Board Members
DEPT.#
18327 35054 4470203 $150,860.69
4470403 $151,766.89 1 hereby certify that the attched invoice(s), or
bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
September 29 20 08
Total $302,627.58 Signature
Cost distribution ledger classification if City En
claim paid motor vehicle highway fund Title