HomeMy WebLinkAboutCorrespondence2004 Sto~l~lw~th & Associate, Inc. ATTN: Bill Bryant 9940 Allisonvill~ Ro~d Fish, rs, IN 46038-2005 VIA FACSIMILB: $49-~942 Dear Mr. Bryant: We have reviewed the revised construciion plsn~ and secondary plat submitted ~o the Hamilton County Surveyor's Office on December 23, 2003 for this project and have the following c. omraer~: 1. Please address all comment in the re~iew letier by Crossroad F_ogineers, for tho City of Carmel, and resubmit construction plans to this office. 2. Please submit an outlet permit requcst for tho proposed project outlet into the Vestal Regulat~ Drain, The forms nre available on our website at !~ click on Dep~utmont Directory. then Surveyor's Office. 3. Please note the ndditional comments may be warranted at a lamr dam. Should you have any questions, I can be r~w. lxed at 317-776-g495. Plan Reviewer Cc: Ion Dobosiowicz -Cml DOCD Dick Hill - Carmel Bnginccring $ohn South- HCSWCD Tim Walter- Platinum Properties Janua~ 29,2004 Mr. Bob Olson CSO 280 E. 96th Street, Suite 200 Indianapolis, IN 46240 RE: Dear Mr. Olson: I have received and reviewed the plans submitted for the above-mentioned project. I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, Michael D. Fogarty Chief of Police MDF:vb cc: Dept. of Community Services (517) 571-2,500 A Nationally Accredit~.~,, forcement Agency Fax (317) 571-2,512 ~c~ 9, 2003 ~~ CSO A~: ~, Bob Ols~ ~ 280 ~ 96m S~ S~ 200 ~d~lis, ~ 46240 ~1~ V~ FACS~: 57~957 Desr Mr. Olson: We have reviewed the comtn~tion plans submitted to rite Hamilton County Surveyor's Office on Dec, erabzr 2, 2003 for this project and have the following comments: 1. This proposed project falls within the jurisdiction of the City of Carmel. 2. The proposed projeo~ falls within the W.R. Fei'tiE Watershed. 3, Pleas~ submit an indire~ outlet permit to this office for the increase in impervious area. 4. Please copy this office on all future submittals of ~onstmction plans and drainage issues. 5. Please note the additional oomments may 1~ warranted at a ~ date. Should you have aay questions, I can b~ reaehed at 317-776-M95. Sincerely, Pl~a l~vi~w~r Cc: Jon Dobosiewioz - Cannel DocD lohn South- HCSWCD Dick Hill - Carmel Enginc~lng December 3, 2003 Mr. Bob Olson CSO 280 E. 96th Street, Suite 200 Indianapolis, IN 46240 -, ~ Dear Mr. Olson: I have received and reviewed the plans submitted for the above-mentioned project. I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, Michael D. Foga~ Chief of Police MDF:vb cc: Dept. of Community Services {517) 571-2500 A Nationally Accredit~forcement Agency F~ (317) 571-2.512 December 16, 2003 CI EL J&'vlES BP, AIN,qP, D, MAYOR Mr. Robert R. Olson CSO Engineers 280 East 96th Street, Suite 200d Indianapolis, IN 46240 RE:~l/~~~l~view #1 Dear Mr. Olson: We have reviewed the drawings submitted for this project and offer the following comments: GENERAL INFORMATION 1. The project site is within current City of Carmel Coq>orate Limits. The following jurisdictions will apply to this project. 2. Jurisdictions: · Street and Right of Way - City of Carmel/City Center Drive, 3ra Avenue SW · Water, Sanitary Sewer- Carmel Utilities · Storm Sewer- City of Carmel 3. Board of Public Works and Safety Approval Requirements: · Commercial Curb Cut- I believe that all necessary curb and median cut approvals are on our Board of Public Works and Safety agenda on December 17th for approval. · Water and Sanitary Sewer Availability. · Consent to Encroach Agreements for any permanent improvement to be installed within dedicated right of way and/or dedicated easements. This includes any proposed irrigation systems. I am enclosing a schedule for Board of Public Works and Safety meeting dates and agenda deadlines for your use. Please use the Engineering Department deadlines for submissions to the Board. Any submission to the Board requires prior final approval by the Carmel Clay Plan Commission and/or the Board of Zoning Appeals and completion of review by the Technical Advisory Committee. All written requests to be place on the Board's agenda must include the appropriate Docket Numbers and the date (or dates) of approval by the Plan Commission and/or BZA. 4. TAC Review/Drawings submitted for approval: We request that all comments and comment letters generated by this office be answered in writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not be approved for construction until all issues have been resolved. The design engineer must certify all drawings submitted for final approval. This office will require a minimum of five-sets of approved drawings after all issues have been resolved. The drawings will be stamped approved and signed by the City Engineer and by the Director of Carmel Utilities. The Developer/Owner will receive one-set which is to be maintained on the construction site at all times. Our Public Works Inspector will receive one-set, Cannel Utilities will receive two-sets and one-set will be maintained in the Department of Engineering. If more than the minimum five-sets are requested to be approved, the additional sets (maximum total of two additional) must be submitted with the three required sets. 5. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated right of way and/or dedicated easements will require a Consent to Encroach Agreement between the DEPARYMENT OF ENGINEERING ONI-: CIVIC SQU^~£, C^I~M~-:I., IN 46032 O~:~'ICV 317.571.2441 F^x 317.571.2439 Mr. Robert R. Olson December 16, 2003 Page 2 Owner/Developer and the City of Carmel. This Agreement requires Board of Public Works and Safety approval. 6. Cannel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water main and sanitary sewer main locations. 7. Carmel Utilities will provide separate review and comments for all water and sanitary sewer issues. 8. I am including copies of the following with this correspondence: · Commercial Project ApprovalProcedures. · Permit Data, Contacts, etc. · Commercial Permitting Procedures. BONDING REQUIREMENTS 9. Upon initial review, it appears that there would be no bonding requirements other than the following right of way issue: Right of Way Permit and Bonding Requirements Any work in dedicated right of way City Center Drive and 3~ Avenue SW will require a Right of Way Permit and a License and Pexmit Bond. This would apply to the December 17t~ Board of Public Works and Safety c~b cut approvals. Please contact Fred Glaser, Right of Way Manager/Inspector, for details regarding this perwAt and bonding. WATER/SANITARY SEWER AVAILABILITY AND CONNECTION 10. Please provide the following information: · Total square footage of the building. Water and Sanitary Sewer Connection Fees for office buildings are based upon 0.5 EDUs per 1000 square feet of office space. Water and Sanitary Sewer Connection Fees arc $1,310.00 per EDU and $795.00 per EDU respectively. Please provide a legal description that contains the acreage of this development. Water and Sanitary Sewer Availability (acreage) Fees are $1,010.00 per acre and $1,365.00 per acre respectively. Please contact Carmel Utilities with questions regarding this issue. We reserve the right to provide additional review and comments upon receipt of detailed construction drawings and drainage calculations. If you have questions, please contact Mike McBride or me at 571-2441. Dick Hill, Assistant Director Department of Engineering Enclosures CC; M~jke M_c_B~ride,.Assistant City_Engi_n~eer.(w.o. encl.) .......... J'on Dobosiewicz, Department~ofCommtmity_Serdces:( .o. encl.)~ ~ John Duffy, Carmel Utilities (w.o. encl.) S 5PROJREV03~PEDCORPHII CSO '°" November 18, 2003 Ceq~erate Headquarters 280 East 96th Street Suite 200 Indianapolis, I~tian~ 46240 T 317.848,7800 F EI1?.574.0957 Mr. Bruce Cordingly Pedcor Investments 8888 Keystone Crossing Suite 900 Indianapolis, IN 46240 RE: Carmel City Center- Pedcor Development Phase II Dear Mr. Cordingly: At the Carmel Redevelopment Commission meeting on November 18, 2003 the schematic design concepts for your Phase II project were approved by the Commission. As you are aware, the Commission will require that a complete set of construction documents for the project be submitted for their approval before starting construction. It should be noted that the Commission will require the screening of your surface parking areas that occur on City Center Drive as well as Third Avenue with Iow brick Ftasonry walls orthe use of brick piers and wrought iron with landscaping. This is consistent with what the Commission has required from other developers on the City Center site. Once your site engineering documents are completed you will need to file for TAC review by the Carmel staff for approval prior to filing for the necessary building permits. CSO stands ready to assist you in any of your efforts involving the construction approval process since we all understand the need for urgency to get your project underway. We will contact Steve Sturtz to coordinate his efforts with the Carmel Redevelopment Commission's current Streetscape project which is bidding on November 21, 2003. if you have any questions regarding any of the above please do not hesitate to contact me. Very truly yours, Principal /al cc: ,_Mayor_ Br_ainard, Ed Burke, Kart Haas, Steve Engleking, Steve Sturtz, t.;awmnce~g, Kate Weese, Bob Olson, file Cso November 19, 2003 Corporate Headquarters 280 East 96m 81reet Suite 200 Indianapolis, indiana 46240 T 317.8482800 F :317.574.09§7 Mr. Steve Sturtz Crews and Sturtz 8132 Hunters Place Indianapolis, IN 46236 Re: Carmel City Center Pedcor Development Phase II Dear Mr. Sturtz: At the Carmel Redevelopment Commission meeting on November 18, 2003 CSO presented the sign concept to be located in the screen wall at the intersection of City Center Drive and Third Avenue. Upon reViewing the sign layout it was the recommendation of the Commission that the overall size of the sign be approved, however, it was their recommendation that the sign be changed to read in larger letters the Pedcor Square followed by smaller letters that would say "at City Center". The Commission felt leaving the word Carmel off was appropriate for this sign. Please resubmit a revised sign layout reflecting this change assuming that it is acceptable to Pedcor Development since they are contributing towards the cost of construction of the screen wall. If you have any questions regarding any part of this, please do not hesitate to contact me. Very truly yours, Les S. Olds, AIA Principal /al cc: Mayor Brainard Ed Burke Karl Haas Steve Engleking ~ruce Cordingly 'j~..a~m__n~.~:~ Ldhg~} Kate ~-e~'s~--~ Bob Olson File PROJECT: Carmel Streetscape / Pedcor Screen Wall. LOCATION: CSO BY: Bob Olson PROJECT NO: 22395C MEETING DATE: 09/30/03 REPORT DATE: 09/30/03 PARTICIPANTS: Steve Sturtz Crews & Sturtz Bob Olson CSO Engineering ' cc: Les Olds Kevin Sellers CSO Architects CSO Engineering This meeting was held to review the preliminary plan provided by Steve Sturtz and the dimensions and sections that CSO has developed from this plan. The object was to make sure the intent by Steve Sturtz was being followed. Bob Olson reviewed walls section sketches showing the 7'-0" Wall facing the intersection and the 5'-0" wall on the backside of the planters to be bricked on both sides so the upper floor of the office building would see brick and not block wall. This wall be increase from approximately 12 to 14 inches thick to 1'-7" thick. Bob Olson suggested per Les Olds comment that the block could be painted to match the brick if this was acceptable to Steve Sturtz. Steve agreed that the painted block on the inside of the wall facing the utilities would be cheaper and acceptable. Bob Olson reviewed the design of the precast stone cap that would set on top of the 5'- 0" x 7'-0" sign columns. Steve Sturtz asked if CSO had any experience using precast stone versus natural stone and if it last long without any problems and if the cost was cheaper. Bob Olson said yes, CSO uses precast stone all the time and we have used it on building for several years and it appears to be holding up quite well. The cost is cheaper and the order time is shorter. The Carmel Reflecting Pond has precast stone on the pool caps as well as the architectural feature on the pavilions. Steve agreed to us precast stone. Bob Olson reviewed the location of the proposed screen wall in relationship with the existing utilities. It appears there are existing storm lines and manholes that may need to be relocated due to the location of the wall foundations and footings, Bob Olson reviewed the existing top of curb elevations along City Center Drive and Third Street in front of the proposed screen wall. It appeared the entire perimeter could be relatively flat. Steve Sturtz would like to see that happen if possible. CSO will proceed in reliance on this report. Any discrepancies should be brought to our attention in writing within seven (7) days. Document2 Page1 Bob Olson and Steve Sturtz reviewed the construction limit between the screen wall project and the Pedcor phase II project. Steve Sturtz agreed with the layout and felt it would not impede the construction of his site. Steve Sturtz mentioned that there is an existing fire hydrant that may need to be relocated. Bob Olson is to review the relocation of the hydrant with Les Olds and may want to review with the Carmel Fire Department. Bob Olson reviewed the wall heights that he had viewed from the renderings from Crews & Sturtz. The sign columns would be 10'-0" high, the curved wall facing the intersection would be 7'-0" high, the back planter wall would be 5'-0" high and the lowest wall would be a seat wall and it would be 30 inches high. These dimensions are approximate and will increase in height with the stone cap and the brick coursing. Steve Sturtz approved the wall heights. Bob Olson reviewed the colored elevations with Steve Sturlz and asked what the intent was in the different color brick lines. Steve said that it was a printer problem. All the brick will be the same color and will be a Flemish bond. Bob Olson reviewed the water table at the base of the columns with Steve Sturtz. The water table will be made of stone and 24 inches in height. The water table at the base of the curved wall will be stone and will be approximately 0'-8" in height. The Pedcor sign is graphic only on the elevation and maybe smaller in length but is to be approximately 2'-0' to 2'-8" in height (brick coursing). The words PEDCOR SQUARE is to appear. Letter type and style was not talked about. There is to be a frieze band at the top of the column and it is to be stone and about 0'-8" in height. 10. Steve Sturtz asked if there was any additional information or meeting that are required to gain the approval for the design of the Pedcor Phase II project. Steve Sturtz also asked if CSO would be writing the legal survey for the separation of the Pedcor Phase II project from the total site. Bob Olson will review with Les Olds and will contact Steve Sturtz with the answers, Steve Sturtz asked what type of lighting was approved for the inside of the site. Bob OIson mentioned that he had faxed Tyler Crews the information about the type of streetlight that was required. Steve Stur[z asked what spacing is required for the streetlights and Bob Olson told Steve Sturtz we would leave it up to him as long as a 0.5 foot candle did not spill over the property lines. We reviewed the location of the street lights along the north side of the reflecting pond and we both agreed there were no need to install street lighting along the south of the Pedcor parking lot and drive being the street lights for the pond were so close and would provide enough light. 11. The gates will be metal and with a total of 10'-0" wide. The spacing of the panels is to be solid of very tight. Robed R. Olson CSO Engineering. CSO will proceed in reliance on this report. Any discrepancies should be brought to our attention in writing within seven (7) days. Document2 Page 2 Cc: Ed Burk, Steve Engelking, Kate Weese~-L~uTe-nce~rilli.~;~L~es Olds Steve Sturtz, File CSO will proceed in reliance on this report, Any discrepancies should be brought to our attention in writing within seven (7) days. Document2 Page 3 ,e|r uc~ion 823-6653