CONSTRUCTION PROJECT INVOICE
DATE: September 29, 2011
COMPANY NAME: F K Construction, Inc.
AND ADDRESS 2055 W. 150 S.
Flora, IN 46929
TELEPHONE NO.: (574)- 967 -4543
FAX NO.: (574)- 967 -3934
PROJECT NAME: 106 Street Path from Westfield Boulevard to Keystone Parkway
PROJECT NO.: 09 -09
INVOICE NO.: 3 Final
Construction pay items as per Progress Pay Estimates No. 3 as shown on the
attached invoice for work completed between the dates of January 1, 2011 to August
11, 2011.
TOTAL PAY THIS ESTIMATE: $8,063.00
MINUS 10% RETAINAGE: N/A
TOTAL NOW DUE: $8,063.00
Submitted by CrossRoad Engineers, PC
gld4 1 ?9 2,,01
Project Representativ signed name Date
Lance Stahley
Project Representative printed name
1 of 2
CITY OF CARMEL
106th Street Path
Westfield Boulevard to Keystone Parkway /LaSalle to White Oak
PROJECT NO. 09-09
PROGRESS PAY ESTIMATE NO. 03
For work done during the period of: 1/111i through 8/11/11
Item Description Quantity this Total Quantity Unit Total Pay Total Pay
No. Estimate to Date Price this Estimate to Date
1 Mobilization Demobilization LS LS $29,000.00
2 Maintenance of Traffic LS LS $4,500.00
3 Clearing Right of Way LS LS $6,500.00
4 Tree Removal LS LS $21,000.00
5 Linear Ditch Grading LFT LFT $5.00
6 DELETED
7 Inlet, Type E -7 EA EA $990.00
8 i Inlet, Type J EA EA $1,400.00
9 Manhole, Type C EA EA $1,600.00
10 Manhole, Type K EA EA $2,900.00
11 Concrete Pipe Catch Basin, 18" EA EA $1,150.00
12 4" PVC, SCH 40 LFT LF' $25.00
13 8" HDPE LFT LFT $23.00
14 12" RCP LFT LFT $25.00
15 15" RCP LIFT LFT $86.00
16 24" RCP LFT LIT $42.00
17 12" Concrete Pipe End Section EA EA $860.00
18 15" Concrete Pipe End Section EA EA $870.00
19 Reinforced Concrete Headwall LS LS $25,400.00
20 Handrail LIFT LFT $145.00
21 B- Borrow for Structure Backfill CYS 92.67 CYS $30.00 $2,780.10
22 Geotextiles SYS 1 93.58 SYS $2.00 $187.16
23 Rip Rap. Revetment, Maximum 6 in. SYS SYS $16.00
24 Storm Manhole, Ad'ust to Grade EA EA $345.00
25 Water Meter, Adjust to Grade EA EA $850.00
26 Water Valve, Adjust to Grade EA EA. $235.00
27 HMA Surface, Type A TON TON $95.00
28 HMA Intermediate, Type A TON TON $64.00
29 Surface Milling, 1 -1/2" SYSI SYS $4.00
30 Compacted Agn. No. 53. Base TON TON $19.00
31 Concrete Curb Ramp, Type G SYS SYS $76.00
32 Nursery Sodding SYS SYS $5.00
33 Erosion Control Blanket SYS SYS $2.00
34 Erosion Control Measures LS LS $4,200.00
35 Topsoil Undistributed CYS CYS $13.00
36 Pipe, Remove LIFT 1 84.00 LFT $15.00 $1,260.00
37 Structure Backfiil, Type 1 CYS 56.00 CYS $45.00 $2,520.00
38 Structure Backfill, Type 3 CYS 113.76 CYS $30.00 $3,412.80
39 HMA Surface, Type C 6.25 TON 6,251 TON $560.00 $3,500.00 $3,500.00
40 PCCP, 12 IN. SYS 55.12 SYS $95.00 $5,236.40
41 Rip Rap, Class 2 TON 62.54 TON $28.00 $1,751.12
42 Win II SFT 294.30 SFT $57.00 $16,775.10
43 Pipe. Reinforced Concrete, 36 IN. LFT 88.40 LFT $65.00 $5,746.00
44 Pipe End Section, 36 IN. EA 1.00 EA $1,420.00 $1,420.00
45 1 Manhole, J4 EA 1.00 EA $2,800.00 $2,800.00
46 Road Closure Sign Assembly EA 1 4.00 EA $400.00 $1,600.00
47 Detour Route Marker Assembly EA 18.00 EA $150.00 $2,700.00
48 Construction Sign, A EA 6.00 EA $220.00 $1,320.00
49 Barricade, 111-8 LFT 48.00 LFT $14.00 $672.00
50 Linear Grading for Path LFT LFT $6.00
51 Water Hydrant, Adjust to Grade EA EA $950.00
52 Straight Concrete Curb LFr LFT 1 $35.00
53 Concrete Curb and Gutter LFT I LFT $35.00
"54 Compacted Agg. No. 53, Base TON TON $20.10
"55 HMA Intermediate, Type A TON TON $127.00
"56 Winterization LS LS $3,745.00
"57 Concrete Curb Ramp, Type G SYS SYS $144.72
"58 56A Win wall Dewatering LS 1.00 LS $4,320.00 $4,320.00
"59 56B Concrete Cradle LS 1.00 LS $250.00 $250.00
"60 Water Main Backfiil Compaction LS I LS $4,190.00
'61 2010 Delay Handrail 27.001 LIFT 1 27.00 LIFT 1 $169.00 $4,563.00 $4,563.00
$8,063.00 $62,813.68
2of2
CITY OF CARMEL
106th Street Path
Westfield Boulevard to Keystone Parkway /LaSalle to White Oak
PROJECT NO. 09-09
PROGRESS PAY ESTIMATE NO. 03
For work done during the period of: 111111 through 8111111
Item Description Quantity this Total Quantity Unit Total Pay Lto tal Pay
No. Estimate to Date Price this Estimate Date
TOTALS AND PAY ESTIMATE CALCULATIONS
TOTAL PAY THIS ESTIMATE $8,063.00
TOTAL PAY TO DATE $62,813.68
DEDUCT 0% RETAINAGE
DEDUCT PREVIOUS NET PAY ESTIMATES $54,750.68
NET PAY ESTIMATE NO. 03 $8,063.00
CrossRoad Engineers, PC q1
Inspecting Firm B Dale
F S K Construction Z q"
Contractor By Date
r
Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995)
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
(2 nas Purchase Order No.
OAS_ S. Terms
V� �OrO.. Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
91,30/(t <00vu S1. c.3 e p r, c
r�1 &�tV
Total O no
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance
with IC 5- 11- 10 -1.6.
20
Clerk- Treasurer
VOUCHER NO. WARRANT NO.
ALLOWED 20
C, )VI C' Y L4 C A ou IN SUM OF
r(0Ka, -4 (,9
ON ACCOUNT OF APPROPRIATION FOR
E i/ Q
Board Members
PO# or INVOICE NO. ACCT #/TITLE AMOUNT
DEPT. I hereby certify that the attached invoice(s), or
bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
u i 20
Signa re
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund