RE: Carmel Hope Fellowship Phase 3
Dear Mr. Shinneman:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office
on September 16, 2011, for this project and have the following comments:
Sincerely,
1. The proposedproject falls in the incorporated area and MS4 jurisdiction of the City of
Carmel.
2. The proposed project DOES NOT fall in a Carmel Wellhead Protection Zone.
3. The proposed project falls in the Taylor Trace Regulated Drain Watershed.
4. The building expansion is part of the master drainage plans previously completed for
this site.
5. No permits will be needed from our office.
Should you have any questions, I can be reached at 317- 776 -8495.
Greg Hoyes, AC, CFM, CPESC
Plan Reviewer
CC: Angie Conn Carmel DOCS
John Thomas Carmel Engineering
Dave Barnes Cannel Engineering
Greg Ilko Crossroad Engineers
October 21, 2011
Mr. Eric Carter
Weihe Engineers
10505 N College Ave
Indianapolis IN 46280
RE: Carmel Hope Fellowship letter #2
Dear Mr. Carter:
The following letterrepresents comments for this project specifically addressing the area of alternative
transportation. I. have reviewed your- response and the drawings submitted on October 21$` and the
comments from the Alternative Transportation review have been satisfactorily addressed.
We request that all responses to our comments be provided in writing. Failure to provide written
responses may result in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re- submitted,
particularly if any such changes are considered "new" or fall outside of our previous reviews. Please
provide revised plans indicating all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, Special Studies or other committee
meetings.
The Department of Community Services reserves the right to provide additional comments based on
subsequent reviews.
If you have questions, please contact me at 571 -2417.
Sincerely,
David Littlejohn
Alternative Transportation Coordinator
Department of Community Services
cc: Angie Conn, Department of Community Services
Engineering Department Review
Project File
ONE CIVIC SQUARE
City t
f Car u x e
Page 1
CAR114EL, INDIANA 46032 317/571 -2417
October 21, 2011
Dear Mr. Littlejohn:
Response:
2. Comment:
Response:
3. Comment:
Mr. David Littlejohn
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317 -571 -2417
RE: Carmel Hope Fellowship
L!: WEIHE
ENGINEERS
Land Surveying Civil Engineering
Landscape, Architecture
Build wit/ confidences"
This letter is in response to your comment email dated October 11, 2011 for the above referenced
project. We have prepared the following responses to the plan review comments listed below.
Review Comments
1. Comment: The Bicycle and Pedestrian Plan requires the construction of a 10'
asphalt path along Carey Rd. Please revise the plans to include and label
this path.
Please see revised plans showing 10' path.
Please confirm when the required multi -use path will be constructed.
The multi use path will be constructed with this phase of the project.
The City of Carmel Parking Ordinance requires that all new developments
include bicycle parking. This development will be required to have a
minimum offour (4) spaces. Please revise your plans to show the
required bicycle parking spaces on your site. Please see the City of
Carmel 's Parking Ordinance in order to determine appropriate locations,
specifications and construction details for the above.
Response: There is existing bicycle parking located near the canopy drive
through on 'the north east side of the existing building, constructed
with Phase 2.
10505 North College Avenue 1 Indianapolis, IN 46280 www.weihe.net I (317) 846 -6611 I (800) 452 -6408 I Fax: (317) 843 -0546
Allan H. Weihe, P.E., L.S., Founder
4. Comment: Please connect all internal sidewalks to the perimeter multi -use paths.
Should you have any further questions or requests for additional information pertaining to this
project review, please contact me at 317 846 -6611.
Sincerely,
Response: Please see connection point near entrance.
Eric Carter, R.L.A.
Project Manager, Commercial Development
H: 12011 \w110449 \admin\ entitlements \responses\2011 -10 -17 comment letter David Littlejohn.docx
Carmel Hope Phase 3
October 21, 2011
Page 2 of 2
Conn, Angelina V
From:
Sent:
To:
Cc:
Subject:
Attachments:
Good Morning David,
I'm preparing a response letter to your comments. I have a question on item 1, regarding the 10' asphalt path. The path
was proposed and approved as a 6' multi -use path with the phase 2 plans, dated
March 30, 2010. Carmel hope has a Bond in place to construct this path as approved, 6'. Do these previously approved
plans supersede the 10' requirement you are referring too?
Attached is the approved site layout plan for Phase 2.
Thank you,
Eric
Eric A. Carter, R.L.A., ASLA
Project Manager, Commercial Development
Weihe Engineers, Inc.
317 1 846 6611
317 1 432 7639 cell
weihe.net
This message and any files transmitted with it are confidential, may contain privileged information which is intended solely for the receipt, use and benefit of the intended
recipient of this email. If you are not the intended recipient, be advised that dissemination, distribution, printing or copying of this message is strictly prohibited and may result
in legal liability on your behalf. If you receive this message in error, or are not the named recipient, please notify the sender at either the email address or telephone number
above and delete this email from your computer. Thank you.
From: Littlejohn, David W Finailto :dlittlejohn(acarmel.in.aov1
Sent: Tuesday, October 11, 2011 12:09 PM
To: Eric Carter
Cc: Conn, Angelina V
Subject: Alt Trans TAC comments Carmel Hope Fellowship Phase III
Eric,
Attached is a comment letter concerning the alternative transportation review for the Carmel Hope Fellowship phase 3
project. Please feel free to contact me with any questions or concerns you may have.
Sincerely,
David Littlejohn, AICP
Alternative Transportation Coordinator
Department of Community Services
City of Carmel
One Civic Sq
Carmel, IN 46032
(317) 571 -2306
A Please consider the environment before printing this e -mail
Eric Carter [cartere@weihe.net]
Monday, October 17, 2011 10:28 AM
Littlejohn, David W
Conn, Angelina V; Jamie Shinneman; Susie DEHART (susieg201 @sbcglobal.net)
RE: Alt Trans TAC comments Carmel Hope Fellowship Phase Ill
C102 SITE LAYOUT.PDF
1
October 11, 2011
Dear Mr. Carter:
Mr. Eric Carter
Weihe Engineers
10505 N College Ave
Indianapolis IN 46280
RE: Carmel Hope Fellowship
City of Carmel
The following letter represents comments for this project specifically addressing the area of
alternative transportation. I have reviewed the drawings submitted for the October 19, 2011
Technical Advisory Committee and offer the following comments:
ALTERNATIVE TRANSPORTATION REVIEW COMMENTS
1) The Bicycle and Pedestrian Plan requires the construction of a 10' asphalt path along
Carey Rd. Please revise the plans to include and label this path.
2) Please confirm when the required multi -use path will be constructed.
3) The City of Carmel Parking Ordinance requires that all new developments include
bicycle parking. This development will be required to have a minimum of four (4)
spaces. Please revise your plans to show the required bicycle parking spaces on your
site. Please see the City of Carrnel's Parking Ordinance in order to determine
appropriate locations, specifications and construction details for the above.
4) Please connect all internal sidewalks to the perimeter multi -use paths.
We request that all responses to our comments be provided in writing. Failure to provide written
responses may result in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re-
submitted, particularly if any such changes are considered "new" or fall outside of our previous
reviews. Please provide revised plans indicating all revisions. Please notify us of any changes
and specifically state any changes, including changes resulting from Plan Commission, Special
Studies or other committee meetings.
ONE CIVIC SQUARE
Page 1
CARMEL, INDIANA 46032 317/571 -2417
The Department of Community Services reserves the right to provide additional comments based
on subsequent reviews.
If you have questions, please contact me at 571 -2417.
Sincerely,
David Littlejohn
Alternative Transportation Coordinator
Department of Community Services
cc: Angie Conn, Department ofCommunity Services
Engineering Department Review
Project File
ONE CATIC SQUARE
Page 2
CARMEL, INDIANA 46032 317/571-2417
CARMEL TECHNICAL ADVISORY COMMITTEE MEETING AGENDA:
Citizens Water Comments 10 -11 -2011
Date: Wednesday, October 19, 2011
Place: Dept. of Community Services Conference Room, 3 Floor, Carmel City Hall.
Time: 9:00 a.m.
NOTE: The department of Public Utilities of the City of Indianapolis d /b /a Citizens Water
(CW) has reviewed the TAC agenda topics listed below. CW's response for each topic is in
Bold Blue Text below each topic description.
9:00 a.m. Docket No. 11090005 TAC: Carmel Hope Fellowship Church, Phase 3.
The applicant seeks TAC approval for a 6,284 sq. ft. building addition for a sanctuary and
meeting rooms, as shown on the original BZA special use approval in 2008. The site is
located at 14.535 Cary Rd. and is zoned R -1 /Residential. Filed by Jamie Shinneman of
Weihe Engineers, Inc.
9:15a.m. Gramercy PUD; brief introduction of construction plans. For the November 16 TAC
meeting Buckingham Companies will bring through their plans and DP /ADLS Applications
for Gramercy PUD (now Mohawk Hills Apartments Golf Course), which is located at the
southwest corner of 126 St. and Keystone Pkwy, on approximately 113 acres. The site is
zoned PUD /Planned Unit Development.
WWW.CARMEL.IN.GOV
CW has no objection to the proposed building addition to Carmel Hope Fellowship
Church, Phase 3. This site is not served bv CW, it is inside the Carmel Utilities service
territor
CW has no objection to the proposed Gramercy PUD. This site is not served bv CW, it
is inside the Carmel Utilities service territory.
Page 1 of 1
ONE CIVIC SQ. CARMEL. IN 46032 (317) 571 -2417
September 29, 2011 1 Submittal
Mr. lames Shinneman, P.E.
Weihe Engineers, Inc.
10505 N. College Ave.
Indianapolis, IN 46280
RE: Carmel Hope Fellowship Church Phase III
Dear Mr. Shinneman:
Technical Advisory Committee
Engineering Review for Development Drainage. Designs
The stormwater review of the proposed construction plans and drainage calculations for the above
referenced project has been completed. The submittal is in need of additional information in order to
be in compliance with the City of Carmel Stormwater Technical Standard Manual: Please revise the
plans in accordance with the comments below.
1. Per Section 102.02:xi.m of the 'manual, please revise the plans to include a drainage summary, in
addition to the area,of'disturbance table that is included. The drainage summary should be
sufficient to summarize. the basic condition of the drainage design, and to verify conformance of
the proposed improvements with the requirements of the previously approved master plan.
Please include with your submittal, one. (1) copy of the comments indicating the action taken or a
written explanation for action not taken. Construction plans and drainage calculations are not to be re-
submitted without im plementing changes with respect to any and all review comments from the City of
Carmel and the Hamilton County Surveyor's Office. The comments and plans may be submitted to my
attention at the following address:
CrossRoad Engineers, P:C.
3417 South Sherman Drive.
Beech Grove, IN 46107
Please contact me at (317) 780 1555 ext. 140 with any questions.
Sincerely,
CrossRoa,Engineers, P.C.
William Hall, P.E.
Project Engineer
copy: Gary Duncan, City of Cannel Assistant Engineer
Greg Noyes, Hamilton County Surveyors Office
File
3417 Sherman Drive a Beech Grove. Indiana 46107 a Tel 317.760•1555 a Fax 317.790.6525
TAC Application Filing Fee:
$303.00
Total Fee Due:
$303.00
Conn, Angelina V
From: Conn, Angelina V
Sent: Thursday, September 22, 2011 12:59 PM
To: 'Eric Carter'; 'Jamie Shinneman'
Cc: 'gcrumley @indysda.org'
Subject: QRevi w Cotiimentsl or Docket No. 11090005 TAC: Carmel Hope Fellowship Church, Phase 3
Hi, Eric Jamie For now, the Planning Department's only review comments are:
1. Please submit electronic copies of the plans, architectural building applications, etc.
2. Please submit copies of any TAC member correspondence to you, or from you to them.
Additional comments might be made at the Oct. 19 TAC meeting.
Thank you!
a Angie Conn, Planning Administrator
From: Conn, Angelina V
Sent: Wednesday, September 21, 2011 11:57 AM
To: 'gcrumley @indyada.org'; 'Eric Carter'; Jamie Shinneman
Cc: Hollibaugh, Mike P; Keeling, Adrienne M; Hancock, Ramona B; Littlejohn, David W; 'jmolitor @prodigy.net'; Boone,
Rachel M.; Tingley, Connie 5; Duncan, Gary R; Redden, Nick; Donahue -Wold, Alexia K; Stewart, Lisa M; Mindham, Daren;
Mishler, Nicholas F; Druley, Elizabeth A; Blanchard, Jim E; Maki, Sue; 'GARY DOXTATER'; Thomas, John G
Subject: Docket No. Assignment: #11090005 TAC) Carmel Hope Fellowship Church, Phase 3
I have issued the necessary Docket Number for (TAC) Carmel Hope Fellowship Church, Phase 3. It is the
following:
Docket No. 11090005 TAC: Carmel Hope Fellowship Church, Phase 3.
The applicant seeks TAC approval for a 6,284 sq. ft. building addition for a sanctuary and meeting rooms, as shown
on the original BZA special use approval in 2008. The site is located at 14535 Cary Rd. and is zoned R-
1 /Residential. Filed by Jamie Shinneman of Weihe Engineers, Inc.
Jamie can be contacted at 846 -6611.
Petitioner. please note the following:
1. This item will be on the Wednesday, October 19 meeting agenda of the Technical Advisory Committee
(TAC), which begins at gam. A representative must be present at this meeting. If not done so already, the
petitioner must submit plans and review materials to all TAC members ASAP via email and /or mail. The
updated TAC members list is online at: www. carmel. in. gov/ Modules /ShowDocument.aspx ?documentlD =708.
2. Mailed and published public notice does not need to occur.
3. Proof of Notice is not needed.
4. This item will be reviewed administratively.
5. Review comments will be issued soon.
If you have any questions or if I may be of assistance, please feel free to call.
Angie Conn, Planning Administrator
City of Carmel Planning Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Fir.
Carmel, IN 46032
1
September 22, 2011
Mr. Eric Carter
Weihe Engineers, INC.
10505 N. College Avenue
Indianapolis, IN 46280
(3 117) 571-25OO
Carme
Car me
iparimeni
>q uar e
t,y
aa'a, 46032
RE: Project: Carmel Hope Fellowship Phase 3
Job number: W110449
Dear Mr. Carter:
The above mentioned project has been received and reviewed.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Resp y ully,
Ti '•thy J. Green
Chief of Police
TJG:vb
cc: Dept. of Community Services
A Nationally Accredited Law Enforcement Agency Fax (317) 571 -2612