From: Conn, Angelina V
Sent: Wednesday, September 21, 2011 11:57 AM
To: 'gcrumley @indyada.org'; 'Eric Carter'; Jamie Shinneman
Cc: Hollibaugh, Mike P; Keeling, Adrienne M; Hancock, Ramona B; Littlejohn, David W;
'jmolitor @prodigy.net'; Boone, Rachel M.; Tingley, Connie S; Duncan, Gary R; Redden, Nick;
Donahue -Wold, Alexia K; Stewart, Lisa M; Mindham, Daren; Mishler, Nicholas F; Druley,
Elizabeth A; Blanchard, Jim E; Maki, Sue; 'GARY DOXTATER'; Thomas, John G
Subject: Docket No. Assignment: #11090005 TAC) Carmel Hope Fellowship Church, Phase 3
1 have issued the necessary Docket Number for (TAC) Carmel Hope Fellowship Church, Phase 3. It is the
following:
Docket No. 11090005 TAC: Carmel Hope Fellowship Church, Phase 3.
The applicant seeks TAC approval for a 6,284 sq. ft. building addition for a sanctuary and meeting rooms, as shown
on the original BZA special use approval in 2008. The site is located at 14535 Cary Rd. and is zoned R-
1 /Residential. Filed by Jamie Shinneman of Weihe Engineers, Inc.
Jamie can be contacted at 846 6611.
TAC Application Filing Fee: $303.00
Total Fee Due: $303.00
Petitioner. please note the following:
1. This item will be on the Wednesday, October 19 meeting agenda of the Technical Advisory Committee
(TAC), which begins at gam. A representative must be present at this meeting. If not done so already, the
petitioner must submit plans and review materials to all TAC members ASAP via email and /or mail. The
updated TAC members list is online at: www.carmel.in.gov/ Modules /ShowDocument.aspx ?documentlD =708.
2. Mailed and published public notice does not need to occur.
3. Proof of Notice is'not needed.
4. This item will be reviewed administratively.
5. Review comments will be issued soon.
If you have any questions or if I may be of assistance, please feel free to call.
Angie Conn, Planning Administrator
City of Carmel Planning Zoning Division
Dept. of Community Services
1 Civic Square, 3rd Flr.
Carmel; IN 46032
0: 317 -571 -2417 F: 317- 571 -2426 1 E: aconn(acarmel.in.00v
W: www.carmeldocs.com
Please consider the environment before printing this e -mail
1
Conn, Angelina V
From: BARBARA S DEHART [susieg201 @sbcglobal.net]
Sent: Thursday, August 04, 2011 9:17 PM
To: Conn, Angelina V; Jamie Shinneman
Cc: Martin Smith
Subject: Square footage of Carmel SDA church
Hi,
The architect has furnished two sets of calculations for the total square footage of the existing and proposed
building.
First:
Phase I 5,739 sq. ft.
Phase II Main floor 6,145
Phase II Second floor 1,304
Total: 13,188
He then recalculated with the basement, measuring from the interior face of exterior walls:
Phase I 5,258
Phase II 8,073
Total: 13,331
Depending on the measurements and whether the basement must be included, we are within or close to the
12,000 sq. ft.plus 10 percent administrative authority.
Please let me know if this answers your question.
Thanks.
Susie