Loading...
HomeMy WebLinkAboutCalumet Civil/3/Cool Creek Trail/+$26,107.03 ti • CITY OF CARMEL TO: Calumet Civil Contractors,Inc. CONTRACT CHANGE ORDER NO.: Three(3) ' f 4898 Fieldstone Drive DATE: May 10, 2011 Whitestown, IN 46075 PROJECT NAME: Hagan-Burke Trail (Cool Creek Trail North) CITY REQ. NO.: CITY P. O. NO.: CITY P. O. DATE: I. You are hereby directed to make the following changes in this contract: Item Description Quantity Unit Unit Price Amount 8.0 Type"0"Compacted Aggregate Base No. 53 29.07 Ton $21.50 $625.00 66.0 Mulch 10.00 Ton $70.31 $703.10 102.0 Time and Material—Lower Str. No. 18 and 1.00 L.S. $2,708.41 $2,708.41 Install Concrete Curb 103.0 Time and Material—Additional Topsoil 1.00 L.S. $1,648.36 $1,648.36 and Seeding at Rangeline Road 104.0 Time and Material—Drainage Swale at 1.00 L.S. $1,109.16 $1,109.16 Lowes Way Bridge 105.0 Additional Supervision 1.00 L.S. $13,469.00 $13,469.00 106.0 Material Increase 1.00 L.S. $4,344.00 $4,344.00 107.0 Mobilization for Laura Vista 1.00 L.S. $1,500.00 $1,500.00 Justification—Item Nos. 8.0,66.0 were increased and 102.0 through 104.0 were added for work related to the prefinal inspection of the project. Item No. 102-Structure No. 18 was lowered and curb added due to wash-out of the compacted aggregate at the trail shoulder. Item No. 103.0—Work along Rangeline Road northwest of the bridge over Cool Creek had been altered from the original plans. A portion of the trail had been completed in conjunction with a work on the bridge by a different Contractor. The dirtwork in this area had settled. In addition, some slope issues were noted in front of Park Place Motors. Additional topsoil brought in and seeding performed to correct these issues. Item No. 104.0—Standing water was noted beneath the Lowes Way Bridge following heavy summer rains. This was outside of the Construction Limits and therefore not addressed at the time of construction. It was determined that a swale could be cut to a nearby ditch to alleviate the condition. Item Nos. 105 and 106 were added to compensate the Contractor for costs incurred due to delays in the project. Item no. 107 was added due to an additional mobilization required for work at Laura Vista due to Right-of-Way issues. See attachments for additional information. II. The following referenced documents further describe the changes outlined in Paragraph I,and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.No.: N/A Other: Breakdown of Time and Material work,Correspondence The changes result in the following adjustment of Contract Price and Contract Time: Contract Sum prior to this Change Order $ 1,318,629.34 Contract Sum will be increased/decreased by this Change Order $ 26,107.03 New Contract Sum including this Change Order $ 1,344,736.37 Contract Time Prior to this Change Order: December 1, 2008 Phase 1 Completion Date August 1, 2009 Phase 2 Completion Date Net Increased/deer-e-ased resulting from this Change Order 0 Days Current Contract Time including this Change Order: October 8, 2009 Phase 1 Completion Date June 8,2010 Phase 2 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes The Above Changes Approved: i are Recommended: are Accepted: t•A'`L Yla4eb� Butler. Fairman &Seufert Calumet Civil Contractors Engineer Contractor s rain ,Ma b 8450 Westfield Blvd. 4898 Fieldstone Drive Address Address Mary Bu to -ber Indianapolis,IN 46240 Whitestown,IN 46075 City/St Zip City/State ip Lora Wat ,Member By: Phone: 317/713-461 Ph ne: 317/769-1900 ' n/� W(a Diana Co dra C-T Date: 1i1I ,2c4.4 Date: c(/ /// Date: CALU r tEc V ,,.,.iw oc6 . (oz.. „ PROJECT NAME T M EXPLANATION CALUMET JOB NO CALUMET CODE Cool Creek Lower strcutre 18&install concrete curb 8099 99931 LABOR Date LABOR TYPE HOURS ST-OT ST RATE OT RATE LABOR AMT LABOR MU 7/14/2010 Superintendent 2 ' ST $60.00 $60.00 $120.00 $24.00 7/14/2010 Operator 1.5 1 ot $46.96 $63.92 $95.88 $19.18 7/14/2010 Operator 2 / ST $46.96 $63.92 $93.92 $18.78 7/14/2010 Laborer 1.5 ot $35.89 $48.12 $72.18 $14.44 7/14/2010 Laborer 2 - ST $35.89 $48.12 $71.78 $14.36 7/15/2010 Laborer 1 ' of $35.89 $48.12 $48.12 $9.62 7/15/2010 Laborer 24 / ST $35.89 $48.12 $861.36 $172.27 7/15/2010 Operator 1.5 / ST $46.96 $63.92 $70.44 $14.09 7/15/2010 Laborer 3 / ST $35.89 $48.12 $107.67 $21.53 7/22/2010 Operator 1 " ST $46.96 $63.92 $46.96 $9.39 7/22/2010 Laborer 1 / ST $35.89 $48.12 $35.89 $7.18 Sum of LABOR $1,624.20 $324.84 EQUIPMENT Date EQUIPMENT EQP HRS RATE EQP AMT EQP MU 7/14/2010 Rubber Tire Backhoe CAT420 D 3.5 $36.00 126 $15.12 7/15/2010 Rubber Tire Backhoe CAT420 D 1.5 $36.00 54 $6.48 7/22/2010 Rubber Tire Backhoe CAT420 D 1 $36.00 36 $4.32 Sum of Equipment $216.00 $25.92 l i Cool Creek Lower strcutre 18&install concrete curb 8099 99931 MATERIAL Date MATERIAL MAT QTY MAT UM MAT UP MAT AMT MATERIAL MU 7/15/2010 Class A Concrete 4 cys $82.00 328 $39.36 Sum of MATERIAL $328.00 $39.36 ' RENTED EQUIPMENT Date RENTED EQP RENTED EQP HRS RENTED EQP RATE RENT AMT RENT MU 7/14/2010 concrete saw 1.5 $6.77 $10.16 $1.22 Sum of RENT $10.16 $1.22 SUBCONTRACTS Date SUBCONTRACT SUB QTY SUB U/M SUB U/P SUB AMT SUB MU 7/14/2010 dump fees 2 Ids $15.00 30 7/14/2010 triaxle 3 hrs $78.50 235.5 Sum of SUBCONTRACTS $265.50 $26.55 TOTAL COST $2,443.86 " TOTAL MU ,,$4-1-7-89—$ A4' 59 .16 I' BONDS/INSURANCE .$2-1-z1'6— 4 Z.O•tb TOTAL —S2,.88-3-721- 4..Z A-4( Calumet Civil Admin Dashboard Page 1 of 2 This form was submitted on 2010-07-15 09;08:31 from 1P address 97 42.168.66 9 1( `r) j , c` ;{���, Main Information Employee Name Union No. Employee No. Time Code Code__ Code Code Code Code i L____ -1 1 11 -11 I ,. ["Shane Reynold I j Reg. 1 1 1{ --1 L 1 II II II419 Item Type: T 8 M _ OT bins _ .____-_I I I I i II Job No.: 8099 (Steve Robbins I / � 1 1 / i I Reg. -.7,04'1_ I L____._J I I L 11 Job Name: Hagan-Burke Trail(Cool Creek) [_L�_.7.__ (- OT r,5 I I i 1 II Day: Wednesday __ _ -- _— _ .,- ._.. , Y Weather: Hot [EVERETT RUHL 1✓ Q---1 I- 3 Reg' 2' 11_ 1L.�i I— Form Date: 07/14/10 OT 11.5 [ r I I_-J[__-_ II County: Hamilton [ - L 1 1 I Reg I I- 1 — I ��I I L Foreman: Shane Reynolds J1 Union Jurisdiction: OT ( I I 1 I I I(I-_�__'() Trucking No. Cost Code C,q p Hours y I I _I L_____l Reg. I I I 1___I I It 11 J rIC-160 J [8G8Rt st-'t I 113 i L! `- OT _I I_ It H I 1 1 1 i ( 11 I L-- 1 1 I Reg, I_—J ___; 1 _I1____J 1-- I L- — 1 t 1 or i---- -1 i- 1 i I 11 II 1 LI 1 I I I I I I Reg. I J L J I 1_____J I _J [- —t 1 1 OT 1 i 1 1 11_____--� L _I 1---1 I I I I I I Reg. I 1 i I I L iI—I I I I I OT 1 i �� I j 1 t J 1 I i I(— L�—J Notes/comments _ 1 l I_ I I am numbering the "punch-list" starting with 1 at the top, then proceeding — —, [ 1 consecutively to make it easier for office help to figure out what items I am referring to.#5, added topsoil behind curb (3 loads noblesville landfill L_ I 5150/loadi Park place motors roughed in (skid steerl to get rid of truck. 2.5 �------- I —, r I I 1 reg hrs.117 saw cut and removed damaged concrete panel (22+50( backhoe, cocrete �' } [ —1spoils used as rip rap as directed by John Seufert. 1 reg hr.419 install Lhorseshoe at inlet, dug out for 281ft of 21" curb as directed by John Seufert. r started cutting str 6" down on overtime-I spoke with John Suefert to make sure__ —— j 1" I I overtime on T&M was allowed- told him we were trying to get ready to pour concrete tomorrow and needed to cut err down before concrete-we agreed on OT, j Work Information Equipment Sheet Job No.:8099 Job No.:8099 Form Date:07/14/10 Form Date:07/14/10 rC��o++stt..C��odde�e Payltem Quantity UM Location Notes Code Equipment Hours Used Equipment Description s Zi I II 1 LS (Throughout site See back page for o Hour • CI 1c1 , (detailed notes. Reading 1-__---_i�______-1 L____. r 11 I[ 1I • — — -- — ____I ii L_____1I_ I I 1 f - — i I 1 1 f http://www.calumetcivil.com/admin/export-printable.php?projFormID=1868 7/16/2010 Calumet Civil Admin Dashboard Page 1 of 2 This form was submitted on 2010-07.1818:08:30 from IP address 97.41.244.60 `:,?9p / Employee Name Union No. Employee No. Time Code Code Code Code Code Code Main Information �r. ,. J 1 i 1 ['STEVE BOBBINS/11 —� Reg. 6 �1 1 r--1 Item Type: T&M // OT 1 / I ( I I i Job No.: 8099 IEVERETT RUHLL/ I Reg. 17.5 I' I I I I __1 I Job Name: Hagan-Burke Trail(Cool Creek) OT I __) L________I i 11 111 l I Day: Thursday Weather: Hot TOMMY WINFREY T7,79 7, ( r Reg. 3.5 1 1 Form Date: 07/15/10 OT I I l� I ( I County: Marion 1--1 Reg J IL_____I Foreman: SHANE REYNOLDS Union Jurisdiction: or I —1 1 I----"1 I 1— Trucking No. Cost Code Hours 1 1 Reg. 1 I I 1 1 (—�--1 OT [ 1 I 1 I1 �� I f l Reg' I ! I 1 1 I 1 I I Reg. 1 I I 1 1 1 OT 1 i I I ----I 1 —I I 1 Reg' I I I J ! 1 1 1 OT L______J I Notes/Comments 1 1 1 1999PList, #19 EVERETT RUHL FINISHED CUTTING STR 18 a ADDED CURB (CUT DOWN 6" I TOTAL).1.5 HRS_ STEVE ROBBINS WORKED ON STONE DURING THIS. STEVE ROBBINS AND 'EVERETT ROHL GRADED DIRT THAT WAS PLACED YESTERDAY #5,#6 BY CAR LOT=6HRS. TOMMY a WINFREY SEEDED AND STRAWED THESE AREAS, PICKED UP STRAW AND SEED ALSO.3.5 HRS. / --r 3 BALES OF STRAW (FROM SLUSSERS 2IONSVILLE RD.) 1 BAG OF SEED FROM LOWE'S.r .�,/ } BACKHOE, CHOPSAW, SKIDSTEER. _ 1 I i } . � 3 Work Information Equipment Sheet Job No.:8099 Job No.:8099 Form Date:07/15/10 Form Date:07115/10 (Cost Code Payltem Quantity UM Location Notes Code Equipment Hours Used Equipment Description 1 " 11/� 11 I I t—.) I Rangeline m car I SEE BACK PAGE FOR NOTES a Hour '7 77 dealership and J Meter 1 / throughout site Reading _! 1- 1 I 11 _I L-- 1���� I— iL I II I I _____. i 11 11 I 1 I� I I- 1 http://www.calumetci vil.com/admin/export-printable.php?projFormID=1936 7/19/2010