HomeMy WebLinkAboutCalumet Civil/1Final/Hazel Dell Pkwy/-$94,468.88 CITY OF CARMEL TO: Mike Little, PE CONTRACT CHANGE ORDER NO.: 1,FINAL Calumet Civil Contractors DATE: 1/3/2011 4898 Fieldstone Drive PROJECT NAME: 09-01 Hazel Dell Parkway Whitestown, IN 46075 CITY REQ. NO.: CITY PO NO.: CITY PO DATE: I. You are directed to make the following changes in this Contract: APP ROV7D AS TO FORM BY See Exhibit A attached '`,`V' SCHEDULED ADJUSTMENT ITEM AMOUNT (+) OR( - ) DAYS See Change Order Table(attached) ($94.468.88) II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.NO.: N/A Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $i,014,000.00 Contract Price will be decreased by this Change Order 094.468.88) New Contract Price including this Change Order $919.531,12 Contract Time prior to this Change Order Days Completion Date Net increased/decreased resulting from this ChangesOrder Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct. indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved Recommended Accepted CROSSROAD ENGINEERS Calumet Civil Contractors ENGINEER CONTRACTOR `' es Brainard, May r 3417 Sherman Drive 4898 Fieldstone Drive _227/2 Address Address 1ikf cB d , City rr ginee Beech Grove, IN 46107 Whitestown, IN 46075 City/State/Zip City/ tate/Zip Mary n Bu e, inber By: B ' Lor W n, Member Phone: 7-780-15 Poi 7-769-1900 ATI T: Date: 1/4/24,(( Date: 2.a.3.• 2"s iana Cordrav, erk-Treasurer Date: /(p/// v. CITY OF CARMEL 09-01 Hazel Dell Parkway CHANGE ORDER TABLE ORIGINAL ORIGINAL FINAL FINAL ITEM NO. DESCRIPTION UNIT PRICE QUANTITY AMOUNT QUANTITY AMOUNT OVER/UNDER 1 Construction Engineering $ 9,028.05 1 $9,028.05 1.00 $9,028.05 $0.00 2 Mobilization and Demobilization $47,000.00 1 $47,000.00 1.00 $47,000.00 $0.00 3 Clearing Right-of-Way $19,000.00 1 $19,000.00 1.00 $19,000.00 $0.00 4 Inlet, Remove $ 250.00 4 $1,000.00 4.00 $1,000.00 $0.00 5 Manhole, Remove $ 350.00 2 $700.00 2.00 $700.00 $0.00 6 Pipe, Remove $ 12.00 426 $5,112.00 306.00 $3,672.00 ($1,440.00) 7 Sign and Support, Remove $ 124.79 28 $3,494.12 31.00 $3,868.49 $374.37 8 Concrete Curb, Remove $ 5.00 4,900 $24,500.00 4574.00 $22,870.00 ($1,630.00) 9 Sidewalk, Remove $ 10.00 115 $1,150.00 82.40 $824.00 ($326.00) 10 Temporary Curb Inlet Protection $ 97.25 68 $6,613.00 42.00 $4,084.50 ($2,528.50) 11 Temporary Silt Fence $ 1.80 1,203 $2,165.40 0.00 $0.00 ($2,165.40) 12 Temporary Concrete Washout $ 400.00 2 $800.00 4.00 $1,600.00 $800.00 13 Excavation, Common $ 40.00 1,020 $40,800.00 1046.96 $41,878.40 $1,078.40 14 Subgrade Treatment, Type IIIA $ 7.00 9,924 $69,468.00 7153.17 $50,072.19 ($19,395.81) 15 Structure Backfill, Type I $ 16.00 145 $2,320.00 69.87 $1,117.84 ($1,202.16) 16 Compacted Aggregate, No. 53., Base $ 21.00 256 $5,376.00 210.37 $4,417.77 ($958.23) 17 Milling, Asphalt, 1" $ 3.00 1,950 $5,850.00 2563.00 $7,689.00 $1,839.00 18 HMA Surface, Type A $ 100.00 35 $3,500.00 26.31 $2,631.00 ($869.00) 19 HMA Intermediate, Type A $ 75.00 59 $4,425.00 52.83 $3,962.25 ($462.75) 20 HMA Patching, Type C $ 100.00 198 $19,800.00 73.63 $7,363.00 ($12,437.00) 21 Widening with HMA, Type C $ 64.00 5,658 $362,112.00 5123.16 $327,882.24 ($34,229.76) 22 HMA Wedge and Level, Type C $ 57.00 497 $28,329.00 322.92 $18,406.44 ($9,922.56) 23 Curb Ramp, Concrete, C $ 98.00 59 $5,782.00 59.30 $5,811.40 $29.40 24 Curb Ramp, Concrete, L $ 100.00 46 $4,600.00 57.07 $5,707.00 $1,107.00 25 Curb Ramp, Concrete, K $ 100.00 14 $1,400.00 9.71 $971.00 ($429.00) 26 Sidewalk, Concrete, 4 in. $ 35.00 61 $2,135.00 76.31 $2,670.85 $535.85 27 Colored and Jointed Concrete, 7" $ 110.00 117 $12,870.00 116.89 $12,857.90 ($12.10) 28 Modified Concrete Center Curb $ 60.00 178 $10,680.00 59.88 $3,592.80 ($7,087.20) Combined Concrete Curb and Gutter, Type 1,620 29 II $ 11.00 $17,820.00 1518.00 $16,698.00 ($1,122.00) Combined Concrete Curb and Gutter, Type 7,575 30 III $ 12.00 $90,900.00 7937.00 $95,244.00 $4,344.00 31 Modified Roll Curb $ 16.00 276 $4,416.00 277.00 $4,432.00 $16.00 32 Barrier Curb at Truck Apron $ 14.00 251 $3,514.00 250.00 $3,500.00 ($14.00) 33 Sodding, Nursery $ 3.35 5,780 $19,363.00 6512.00 $21,815.20 $2,452.20 34 Water $ 25.00 18 $450.00 20.83 $520.75 $70.75 35 Topsoil (Undistributed) $ 40.00 420 $16,800.00 192.00 $7,680.00 ($9,120.00) Pipe, Type 4, Circular, 6 in. Double Wall, 1,207 36 Smooth Interior $ 5.10 $6,155.70 1052.20 $5,366.22 ($789.48) 37 Pipe, RCP, Circular, 12 in. $ 35.00 262 $9,170.00 238.00 $8,330.00 ($840.00) 38 Pipe, RCP, Circular, 18 in. $ 45.00 35 $1,575.00 28.00 $1,260.00 ($315.00) 39 Aggregate for Underdrain $ 39.75 109 $4,332.75 94.70 $3,764.33 ($568.43) 40 Geotextiles for Underdrain $ 1.70 1,265 $2,150.50 0.00 $0.00 ($2,150.50) 41 Inlet, J-10 $ 1,494.21 2 $2,988.42 2.00 $2,988.42 $0.00 42 Catch Basin, K-10 $ 1,800.00 3 $5,400.00 3.00 $5,400.00 $0.00 43 Manhole, C-4 $ 2,000.00 2 $4,000.00 2.00 $4,000.00 $0.00 44 Inlet, Remove and Reset $ 800.00 1 $800.00 1.00 $800.00 $0.00 45 Adjust Casting to Grade $ 400.00 7 $2,800.00 5.00 $2,000.00 ($800.00) 46 Remove and Reset Casting $ 501.00 1 $501.00 1.00 $501.00 $0.00 47 Road Closure Sign Assembly $ 233.00 5 $1,165.00 4.00 $932.00 ($233.00) 48 Detour Route Marker Assembly $ 62.00 17 $1,054.00 24.00 $1,488.00 $434.00 49 Construction Sign, A $ 56.00 10 $560.00 4.00 $224.00 ($336.00) 50 Concstruction Sign, B $ 10.60 2 $21.20 2.00 $21.20 $0.00 51 Construction Sign, C $ 92.00 4 $368.00 5.00 $460.00 $92.00 52 Maintaining Traffic $22,000.00 1 $22,000.00 1.00 $22,000.00 $0.00 53 Barricade, Ill-B $ 6.28 336 $2,110.08 172.00 $1,080.16 ($1,029.92) 54 Light Standard, Remove $ 373.31 2 $746.62 2.00 $746.62 $0.00 55 Cable Duct Marker $ 298.23 2 $596.46 2.00 $596.46 $0.00 Wire, No. 4 Copper in Plastic Duct, in 56 Conduit, 4 1/c $ 11.63 260 $3,023.80 396.60 $4,612.46 $1,588.66 Wire, No. 4 Copper in 2 in. Galvenized 57 Steel, in Conduit, 4 1/c $ 11.21 294 $3,295.74 311.00 $3,486.31 $190.57 58 Conduit, Steel, Galvenized, 2 in. $ 17.34 294 $5,097.96 323.00 $5,600.82 $502.86 59 Conduit, PVC, 4 in. $ 11.74 523 $6,140.02 630.00 $7,396.20 $1,256.18 60 Conduit, PVC, 3/4 in. $ 6.03 92 $554.76 42.00 $253.26 ($301.50) 61 Light Pole Assembly, Street $ 8,259.31 4 $33,037.24 4.00 $33,037.24 $0.00 62 Service Point, II $ 2,497.88 1 $2,497.88 1.00 $2,497.88 $0.00 63 Handhole, Lighting $ 898.90 1 $898.90 1.00 $898.90 $0.00 64 Controller Cabinet Foundation, P1, Modified $ 1,761.84 1 $1,761.84 1.00 $1,761.84 $0.00 65 Controller Cabinet, P1, Modified $ 2,818.32 1 $2,818.32 1.00 $2,818.32 $0.00 Sign Post, Square, 1, Reinforced Anchor 66 Base $ 18.40 335 $6,164.00 231.70 $4,263.28 ($1,900.72) Sign, Sheet, Encapsulated Lens with 67 Legend, 0.080 in Thickness $ 21.47 140 $3,005.80 140.00 $3,005.80 $0.00 68 Decorative Street Sign Assembly $ 2,061.13 4 $8,244.52 4.00 $8,244.52 $0.00 Line, Paint, Dotted White, 8 in., 2' Line, 2' 69 Gap $ 2.32 142 $329,44 167.00 $387.44 $58.00_ Transverse Markings, Paint, White Yield 70 Line, 27 in. $ 2.63 72 $189.36 96.40 $253.53 $64.17 71 Line, Paint, Solid White, Crosswalk, 24 in. $ 2 04 328 $669.12 223.00 $454.92 ($214.20) 72 Snowplowable Raised Pavement Marker $ 42.00 12 $504.00 14.00 $588.00 $84.00 73 Restore Subdivision Landscape $14,000.00 1 $14,000.00 1.00 $14,000.00 $0.00 *74 Line, Paint, Solid, White, 4 in $0.19 0 $0.00 2052.20 $389.92 $389.92 *75 Line, Paint, Broken, White, 4 in. $0.19 0 $0.00 2020.00 $383.80 $383.80 *76 Pavement Message Markings, Paint, Lane Ir $52.50 0 $0.00 14.00 $735.00 $735.00 *77 Pavement Message Markings, Paint, Word ( $63.00 0 $0.00 1.00 $63.00 $63.00 *78 Geotextiles for Underdrain $1.70 0 $0.00 1101.30 $1,872.21 $1,872.21 tea: ,, 7 , l v 0 * .4 a=T, , ." ,..:. _i , 4 .,. ': F .14. 4 : ', '71;. •:a .n '' ,=' 1. "fir TOTAL�OF,CHANGEAORDERilTEMSx:,. . , .iit*... : � • : .t. $10,1°4000T00 . gig, >.. :... $.9;19,53,1 ;12. .z -$94;4688 88. TOTAL ORIGINAL CONTRACT PLUS CHANGE ORDER ITEMS ORIGINAL CONTRACT PRICE $1,014,000.00 CHANGE ORDER#1 -$94,468.88 NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS $919,531.12 * Indicates additional item added to the contract. CITY OF CARMEL 09-01 Hazel Dell Parkway Exhibit A You have been directed to make the following changes in this Contract: Item#74 Item omitted from contract Item#75 Item omitted from contract Item#76 Item omitted from contract Item#77 Item omitted from contract Item#78 Item 40 was in CYS corrected to SYS