HomeMy WebLinkAboutCalumet Civil/1 FINAL/126th Sidewalk & Drainage/+$11,042.18 CITY OF CARMEL TO: Mike Little CONTRACT CHANGE ORDER NO.: 1 (FINAL) Calumet Civil Contractors, Inc. DATE: 4-8-11 4898 Fieldstone Drive PROJECT NAME: 126th St. Sidewalk & Drainage Whitestown, IN 46075 Improvements (Phase 1) CITY REQ. NO.: CITY PO NO.: CITY PO DATE: I. You are directed to make the following changes in this Contract: �y (Brief Description) ts ITEM AMOUNT (+) OR (-) DAYS \� See attached sheets II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ f Zd 000.0t9 Contract Price will be increased/ by this Change Order $ /:r 04 z./,� New Contract Price including this Change Order $ /7! 04424(9 Contract Time Prior to this Change Order ® Days — Completion Date Net increased/decreased resulting from this Change Order Days Current Contract Time including this Change Order — Days — Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended Accepted: _/ A ENG EER CONTRACTOR ` <: ip.•s Br.' ard, M. sr- t21EL Civic GdAre 5'8`Rriez8S7 vvF /�Q(116 ` (A ress Address M.ry ,, . B : ke, ember i-,®/ /X/ 4/623 w urts714 N lA' Y6071- City/State/Zip City/State/Zip' Lor.'W. in, Member By: By: AT T: 171/I r-e. karnp 4/C14AEC. 6. t1 ETA (p name (print name (signature (signature) Phone:Phone: 3/7-7/! - 3066 Phone: (3/4) 76 [—/?oa Q ;� � — � 2 zo f Diana Cor y, Clerk-Treasurer Date: �/'/' �`J, 20// Date: Date: MichaelMcBridec City Enginee Date: S /3/20f1 Change Order No. 1 (Final) Phase I: 126`h Street Sidewalk and Drainage Improvements Auman and Newark Neighborhood Improvements Item #4 B-Borrow for Structure Backfill was required because additional RCP was added to the contact to enclose a ditch along the edge of the roadway. The ditch was enclosed to eliminate an unsafe condition to vehicular traffic. Overrun $343.71 Item #6 Storm Sewer Pipe, 12 inch Class V RCP was required to enclose a ditch along the edge of the roadway. The ditch was enclosed to eliminate an unsafe condition to vehicular traffic. Overrun $756.00 Item #7 Storm Sewer Pipe, 15 inch CMP was eliminated from the contract because the manhole location was adjusted. Underrun $224.00 Item #8 Draintile, PVC, 4 inch, Undistributed—additional pipe was needed to provide drainage from a residence to a drainage structure. Overrun $190.00 Item #11 Modified Manhole C-4 was eliminated from the contract because it was replaced with a manhole paid in a change order item. Underrun $1,900.00 Item #1 5 4 inch Concrete Walk - less concrete walk was constructed than was shown in the plans. Underrun $255.76 Item #16 Concrete Pavement Removal quantity was increased because of error in the plan quantity. Removal of the existing concrete sidewalk was added to the contract quantity for this item. Overrun $1,675.63 Item #17 Concrete Pavement, Residential Drive, 6 inch - quantity was increased because of error in the plan quantity and adjustments in the field to match existing conditions. Overrun $768.00 Item#19 Unsuitable Materials, Removal/Replacement was not encountered during construction. Underrun $1,950.00 Item #20 Compacted Aggregate for Base was reduced because the lift thickness under • the asphalt path was reduced. Underrun $1,796.34 Item #21 HMA Surface, A, for Road Patch was reduced because less material was used for the patch than was estimated in the plan quantities. Underrun $530.00 Item # 22 HMA Surface, A, for Path underrun because the surface was laid at a thickness under the 1 '/z inches shown in the plans. Underrun $441.90 Item # 23 HMA Intermediate, A, for Path underrun because the binder was laid at a thickness under the 3 inches shown in the plans. Underrun $1,215.08 Item #25 Construction Fencing, Undistributed was required that was shown in the plans. Overrun $360.00 Item #30 Sod - error in the plan quantity - more sod was required to cover disturbed areas that were not shown in the plans. Overrun $2,915.00 Item #32 Signs, Reset one less sign was reset than was shown in the plans. Underrun $150.00 Item #37 EWA An existing 15 inch CMP running under 126th Street that was not shown on the plans (Sta.32+50). The pipe was holding water and a new inlet was constructed to intercept the pipe and maintain flow from the existing pipe. The new structure and labor was paid for by time and material. Overrun $3,018.58 Item #38 EWA The elevation of the existing 15 inch CMP at Str. #14 was lower than was shown in the plans. A new structure was constructed to allow for the difference in elevation. The new manhole, pipes and labor was paid for by time and material. Overrun $4,062.46 Item #39 EWA The 12 inch RCP (Str. #15) at Sta. 35+66 was extended to connect to the 12 inch RCP (Str. #17) at Sta. 36+00 to eliminate a ditch along the edge of the roadway. There would have been an approximate 2 foot drop off and it would have resulted in an unsafe condition to the traveling public. Structure #16 was also connected to the new manhole because the ditch was eliminated. The new manhole, pipes and labor was paid for by time and material. Overrun $3,649.73 Item #40 EWA The existing thin plastic pipe continued to break as the contractor tried to connect it to new PVC pipe. It continued to break to a point outside of the R/W. The length of the RCP at Sta. 43+10 had to be adjusted and the metal end section was removed because of a pipe conflict with the PVC pipe. The pipe extension and metal end section was paid for by time and material. Overrun $614.00 Item #41 EWA A yard drain and dual wall drain tile was placed at Sta. 42+75 and connected to Str. #21 to eliminate ponding water along the R/W and adjacent lot at 411 126th Street. The yard drain, pipe, cored hole in the structure and labor was paid for by time and material. Overrun $919.65 Item #42 EWA Concrete curb was added to the new drive at Sta. 33+04 to match the existing curb. Overrun $232.50