Loading...
HomeMy WebLinkAboutGeorge Harvey/7/Cool Creek Trail/+$2,480.00TO: You are directed to make the following changes in this Contract: (Brief Description) ITEM AMOUNT OR DAYS 91 Chain link fence gate $2480.00 II. The following referenced Documents further describe the changes outlined in Paragraph 1, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: Change Order The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order 613215.65 Contract Price will be increased /decreased by this Change Order 2480 New Contract Price including this Change Order 615695.65 Contract Time Prior to this Change Order Days _11/15/12 Completion Date Net increased /decreased resulting from this Change Order Days Current Contract Time including this Change Order Days 11/15/12 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended 6vrt,re-- AA./ qaa ENGINEER (FV5o c..wpionczer-i5 &v.° Address 31v4 44I4 lits *241F City /State /Zip By: (print nam (signature) Phone: 3,7 31J'ga Date: 6.7 V)/ CONTRACT CHANGE ORDER NO.: 7 DATE: 7/27/11 PROJECT NAME: Cool Creek Trail CITY REQ. NO.: CITY PO NO.: CITY PO DATE: The Above Chang -,s Are Accepted: 6 6004,&..- CONTRACTOR A dd ress UAujUtu e /J -4G i 2Y City/State/Zip B CITY OF CARMEL Approved: Burke, Member, Lori Wat •n, Member ATTEST: iana Cord y, Clerk- Treasurer Date: ?"i7--- Michael T. McBride City Engine r Date: 7( 22J2o /I Contract No:R -29657 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Contract Information Contract No.: R -29657 District:GREENFIELD DISTRICT AE:Goldner, Rob Change Order Information Change Order No.: 007 Date Generated: 00 /00 /0000 Date Approved: 00 /00 /0000 Reason Code: CHANGED COND, Construction Related Description: Sliding Gate at Waste water Plant to Utility access pad Original Contract Amount 583,765.77 Current Change Order Amount 2,480.00 Total Previous Approved Changes 29,449.88 Total Change To -Date 31,929.88 Modified Contract Amount 615,695.65 Time Extension Information Date Initiated 00 /00 /0000 Original Contract Time Time Element Description: Current Time Extension Previous Time Approved Revised Contract lime Date Completed 00 /00 /0000 Change Order No.: 007 Page: 1 Letting Date:02/09/2011 PE /S:Surber, Rob Status:Draft EWA: Y or Force Acct: N Percent: 0.425 Percent: 5.045 Percent: 5.470 SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SP Date 00 /00 /0000 or SP Days (SS Standard Specification, SP Special Provision) SS Days 0 SP Days 0 SP Days Value 0.00 SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SS Date 00 /00 /0000 or SP Days 0 Contract No:R -29657 Change Order No.: 007 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: DDCM: ($perChangeOrder) LE$ 250K-)(- LE$750K- LE$2M-- GT$2M (Days per Contract) (50 SS days) 100 SS days) 200 SS Days) GT 200 SS days) Verbal Approval Required? Y N If Y, by Date Issued Total Change To- Date >5 Y N If Y Copy to Program Budget Manager Scope /Design Recommendation Y N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y N If Y, Concurrence by Date If N, Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y N If Y, Date to LPA Date Returned FHWA Signatures Required? Y N If Y, Date to FHWA Date Returned Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -29657 INDIANA Date:07/27/2011 Change Order No:007 Department of Transportation Page: 3 Contract: R -29657 Project: 0600390 State:0600390 Change Order Nbr: 007 Change Order Description: Sliding Gate at Waste water Plant to Utility access pad Reason Code: CHANGED COND, Construction Related CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Gate added to fence at wastewater treatment plant for access to concrete utility crossing on trail. Change Order Explanation for Specific Line Item 0091 0600390 0091 603 -11002 EACH 2,480.000 1.000 C Amount:$ 2,480.00 Item Description: FENCE GATE, CHAIN LINK, 72 IN. X 24 FT. Supplemental Descriptionl: Chain link gate at Wastewater Treatment plant for access Supplemental Description2: utility drive across trail Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation Amount Change Total Value for Change Order 007 2,480.00 It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor: Signed By: Date: NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -29657 INDIANA Date:07/27/2011 Change Order No:007 Department of Transportation Page: 4 (SIGNATURE) (SIGNATURE) PENS APPROVED FOR LOCAL PUBLIC AGENCY (TITLE) (DATE) (TITLE) (DATE) SUBMITTED FOR CONSIDERATION Approval Level APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Name of Approver Date Status July 21, 2011 Rob Surber Project Supervisor Butler, Fairman Seufert Contract: R- 29657 -A Re: Gate at Drive Type II Rob, George R. Harvey Son, Inc. 964 N. SR 39 Danville IN. 46122 317.745.5169 Fax 317.745.2733 We discussed the need for s gate thru the chain link fence into /out of the City of Carmel's property. We discussed an 18 foot gate, either s swing or a sliding gate. The two subcontractors I talked with said the sliding gates were very expensive. The fence runs parallel with the trail at this point. The Stations where the Type 1I Drive crosses the trail is 20.88 feet on the same skew as the fence. I discussed the width with the gate subcontractor and we came up with a width of 24 foot for the gate. They have to have enough room to place a gate post on both sides. The gate will be a double 12 foot swing gate. We do not have this subcontractor approved for this project, so we will have to get a subcontract to them and get them approved. Cost: Subcontractor $1,725.00 10% 175.00 Superintendent 4hr $75.00 300.00 Administrative 4hr $70.00 280.00 Total $2,480.00 If you have any questions, please contact me at 317.745.5169 or dickharvev@sbcglobal.net. sbcglobal.net. Richard A. Harvey An Equal Opportunity Employer 07/20/2011 15:59 3178763829 JAMES H re Peck Vic sident Operations 8701 Zionsville Road, P.O. Box 68935 Indianapolis, IN 46268 -0935 Office: 317 -876 -3 Fax: 317 -876 -3829 QUOTATION Letting Date: July 20, 2011 County: Hamilton Contract No: Carmel Project George R. Harvey Son, Inc. Attention: Dick Harvey JAMES H DREW CORP CORPORATION We are pleased to submit the following quotation for the subject contract: ITEM UNIT NO DESCRIPTION QUANTITY UNIT PRICE 1 6' With 3 Strands BW x 24' 1 EA S 1,725.00 Double Swing Gate AN EQUAL OPPORTUNITY EMPLOYER PAGE 01/01 1578 Boonville Road, Sedalia, MO 65301 P.O. Box 717, Sedalia, MO 65302 -0717 Office: 660- 828.2335 Fax: 660 627 -6414