HomeMy WebLinkAboutGeorge Harvey/7/Cool Creek Trail/+$2,480.00TO:
You are directed to make the following changes in this Contract:
(Brief Description)
ITEM AMOUNT OR DAYS
91
Chain link fence gate $2480.00
II. The following referenced Documents further describe the changes outlined in Paragraph 1, and
are to be considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other: Change Order
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order 613215.65
Contract Price will be increased /decreased by this Change Order 2480
New Contract Price including this Change Order 615695.65
Contract Time Prior to this Change Order Days _11/15/12 Completion Date
Net increased /decreased resulting from this Change Order Days
Current Contract Time including this Change Order Days 11/15/12 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended
6vrt,re-- AA./ qaa
ENGINEER
(FV5o c..wpionczer-i5 &v.°
Address
31v4 44I4 lits *241F
City /State /Zip
By:
(print nam
(signature)
Phone: 3,7 31J'ga
Date: 6.7 V)/
CONTRACT CHANGE ORDER NO.: 7
DATE: 7/27/11
PROJECT NAME: Cool Creek Trail
CITY REQ. NO.:
CITY PO NO.:
CITY PO DATE:
The Above Chang -,s Are
Accepted:
6 6004,&..-
CONTRACTOR
A dd ress
UAujUtu e /J -4G i 2Y
City/State/Zip
B
CITY OF CARMEL
Approved:
Burke, Member,
Lori Wat •n, Member
ATTEST:
iana Cord y, Clerk- Treasurer
Date: ?"i7---
Michael T. McBride
City Engine r
Date: 7( 22J2o /I
Contract No:R -29657
INDIANA Department of Transportation
Construction Change Order and Time Extension Summary
Contract Information Contract No.: R -29657
District:GREENFIELD DISTRICT AE:Goldner, Rob
Change Order Information Change Order No.: 007
Date Generated: 00 /00 /0000 Date Approved: 00 /00 /0000
Reason Code: CHANGED COND, Construction Related
Description: Sliding Gate at Waste water Plant to Utility access pad
Original Contract Amount 583,765.77
Current Change Order Amount 2,480.00
Total Previous Approved Changes 29,449.88
Total Change To -Date 31,929.88
Modified Contract Amount 615,695.65
Time Extension Information
Date Initiated 00 /00 /0000
Original Contract Time
Time Element Description:
Current Time Extension
Previous Time Approved
Revised Contract lime
Date Completed 00 /00 /0000
Change Order No.: 007
Page: 1
Letting Date:02/09/2011
PE /S:Surber, Rob Status:Draft
EWA: Y or Force Acct: N
Percent: 0.425
Percent: 5.045
Percent: 5.470
SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0
SP Date 00 /00 /0000 or SP Days
(SS Standard Specification, SP Special Provision)
SS Days 0 SP Days 0 SP Days Value 0.00
SS Days by AE: DCE: SCE: DDCM:
SS Days SP Days Value
SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0
SS Date 00 /00 /0000 or SP Days 0
Contract No:R -29657 Change Order No.: 007
INDIANA Department of Transportation Page: 2
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority AE: DCE: SCE: DDCM:
($perChangeOrder) LE$ 250K-)(- LE$750K- LE$2M-- GT$2M
(Days per Contract) (50 SS days) 100 SS days) 200 SS Days) GT 200 SS days)
Verbal Approval Required? Y N If Y, by Date Issued
Total Change To- Date >5 Y N If Y Copy to Program Budget Manager
Scope /Design Recommendation Y N If Y, Referred to Project Manager(PM)
Required?
Date to PM Date Returned
Approval Authority Concurs with PM? Y N If Y, Concurrence by Date
If N, Resolution: Approved Disapproved
Resolved by Date
LPA Signatures Required? Y N If Y, Date to LPA Date Returned
FHWA Signatures Required? Y N If Y, Date to FHWA Date Returned
Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments:
Contract No:R -29657 INDIANA Date:07/27/2011
Change Order No:007 Department of Transportation Page: 3
Contract: R -29657
Project: 0600390 State:0600390
Change Order Nbr: 007
Change Order Description: Sliding Gate at Waste water Plant to Utility access pad
Reason Code: CHANGED COND, Construction Related
CLN PCN PLN Item Code Unit Unit Price CO Qty Comment
Gate added to fence at wastewater treatment plant for access to concrete utility crossing on trail.
Change Order Explanation for Specific Line Item
0091 0600390 0091 603 -11002 EACH 2,480.000 1.000 C Amount:$ 2,480.00
Item Description: FENCE GATE, CHAIN LINK, 72 IN. X 24 FT.
Supplemental Descriptionl: Chain link gate at Wastewater Treatment plant for access
Supplemental Description2: utility drive across trail
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended.
General or Standard Change Order Explanation
Amount Change
Total Value for Change Order 007 2,480.00
It is the intent of the parties that this change order is full and complete compensation for the work describe above.
Notification and consent to this change order is hereby acknowledged.
Contractor: Signed By:
Date:
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
Contract No:R -29657 INDIANA Date:07/27/2011
Change Order No:007 Department of Transportation Page: 4
(SIGNATURE)
(SIGNATURE)
PENS
APPROVED FOR LOCAL PUBLIC AGENCY
(TITLE) (DATE)
(TITLE) (DATE)
SUBMITTED FOR CONSIDERATION
Approval Level
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION
Name of Approver
Date
Status
July 21, 2011
Rob Surber
Project Supervisor
Butler, Fairman Seufert
Contract: R- 29657 -A
Re: Gate at Drive Type II
Rob,
George R. Harvey Son, Inc.
964 N. SR 39 Danville IN. 46122
317.745.5169 Fax 317.745.2733
We discussed the need for s gate thru the chain link fence into /out of the City of Carmel's
property. We discussed an 18 foot gate, either s swing or a sliding gate. The two subcontractors I
talked with said the sliding gates were very expensive.
The fence runs parallel with the trail at this point. The Stations where the Type 1I Drive crosses
the trail is 20.88 feet on the same skew as the fence. I discussed the width with the gate
subcontractor and we came up with a width of 24 foot for the gate. They have to have enough
room to place a gate post on both sides. The gate will be a double 12 foot swing gate.
We do not have this subcontractor approved for this project, so we will have to get a subcontract
to them and get them approved.
Cost: Subcontractor $1,725.00
10% 175.00
Superintendent 4hr $75.00 300.00
Administrative 4hr $70.00 280.00
Total $2,480.00
If you have any questions, please contact me at 317.745.5169 or dickharvev@sbcglobal.net.
sbcglobal.net.
Richard A. Harvey
An Equal Opportunity Employer
07/20/2011 15:59
3178763829
JAMES H
re Peck
Vic sident Operations
8701 Zionsville Road, P.O. Box 68935
Indianapolis, IN 46268 -0935
Office: 317 -876 -3
Fax: 317 -876 -3829
QUOTATION
Letting Date: July 20, 2011
County: Hamilton
Contract No: Carmel Project
George R. Harvey Son, Inc.
Attention: Dick Harvey
JAMES H DREW CORP
CORPORATION
We are pleased to submit the following quotation for the subject contract:
ITEM UNIT
NO DESCRIPTION QUANTITY UNIT PRICE
1 6' With 3 Strands BW x 24' 1 EA S 1,725.00
Double Swing Gate
AN EQUAL OPPORTUNITY EMPLOYER
PAGE 01/01
1578 Boonville Road, Sedalia, MO 65301
P.O. Box 717, Sedalia, MO 65302 -0717
Office: 660- 828.2335
Fax: 660 627 -6414