HomeMy WebLinkAboutGeorge Harvey/5/Cool Creek Trail/+$4,620.00TO: CITY OF CARMEL CONTRACT CHANGE ORDER NO.: #5 DATE: 6 -21 -11 PROJECT NAME: Cool Creek Trail CITY REQ. NO.: CITY PO NO.: CITY PO DATE: I. You are directed to make the following changes in this Contract: Mobilization for seeding as discussed in Pre construction meeting and extra mobilization fee for HMA due to utility problems, as discussed on 6- 10 -11. ITEM AMOUNT Mobilization for Seeding 1650.00 Mobilization for HMA 2970.00 II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other:_CO #5 The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order 600461.77 Contract Price will be increased /decreased by this Change Order +4620.00 New Contract Price including this Change Order 605081.77 Contract Time Prior to this Change Order Days _11/15/12 Completion Date Net increased /decreased resulting from this Change Order 0_ Days Current Contract Time including this Change Order Days _11/15/12 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Recommended Accepted: 3vrc,c2 ..4 d sea4'esizr G0d,e00 R A'a vfr OW ENGINEER CONTRACTOR &o &P. 969 SR 3? Address Address ii=4r, DAN v/ L CO ice! 44 z City /State /Zip City /State /Zip By: By: gveeter S.,ektent. c doizag 144/e vrr (prince) (print name) /I (signature) (signature) Phone: 3r-7_3 lgoo Phone: 3/7, 7e/S7 s/ 1, 9 Date: 6 -23 Date: G 23 r/ OR DAYS Approved: Diana Cordray, Date: rk- Treasurer Aff Z.Z4tr_ ichael T. McBri•e City Engineer Date: 101,/�. 28, 2611 It Contract No:R -29657 Change Order No.: 006 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -29657 Letting Date:02/09/2011 District:GREENFIELD DISTRICT AE:Goldner, Rob PE /S:Surber, Rob Status:Draft Change Order Information Change Order No.: 006 Date Generated: 00 /00 /0000 Date Approved: 00 /00 /0000 Reason Code: CHANGED COND, Construction Related Description: Additional Truss Repair Original Contract Amount 583,765.77 Current Change Order Amount 8,133.88 Total Previous Approved Changes 16,696.00 Total Change To -Date 24,829.88 Modified Contract Amount 608,595.65 Time Extension Information Date Initiated 00 /00 /0000 Original Contract Time Time Element Description: Current Time Extension Previous Time Approved Revised Contract Time Date Completed 00 /00 /0000 EWA: Y or Force Acct: N Percent: 1.393 Percent: 2.860 Percent: 4.253 SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SP Date 00 /00 /0000 or SP Days (SS Standard Specification, SP Special Provision) SS Days 0 SP Days 0 SP Days Value 0.00 SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SS Date 00 /00 /0000 or SP Days 0 tt Contract No:R -29657 Change Order No.: 006 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: DDCM: per Change Order) LE$ 250K-)(- LE$750K- LE$2M-- GT$2M (Days per Contract) (50 SS days) 100 SS days) 200 SS Days) (GT 200 SS days) Verbal Approval Required? Y N If Y, by Date Issued Total Change To- Date >5 Y N If Y Copy to Program Budget Manager Scope /Design Recommendation Y N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y N If Y, Date to LPA Date Returned FHWA Signatures Required? Y N If Y, Date to FHWA Date Returned Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -29657 INDIANA Change Order No:006 Department of Transportation Contract: R -29657 Project: Change Order Nbr: 006 Change Order Description: Additional Truss Repair 0600390 State:0600390 CHANGED COND, Construction Related CLN PCN PLN Item Code Unit 0090 0600390 0090 711 -51038 LS Item Description: STRUCTURAL STEEL Supplemental Description1: Extra Angles replaced on lower chord Supplemental Description2: Reason Code: Change Order Explanation for Specific Line Item Date: Unit Price 8,133.880 CO Qty Comment 1.000 C Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation Additional Truss Repair Upon removal of gussest plates some of the angles were deeriorated beyond repair. Due to this we had to replace ten additional angles. It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor: Signed By: NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Date:06/22/2011 Page: 3 Amount Change Amount:$ 8,133.88 Total Value for Change Order 006 8,133.88 Contract No:R -29657 Change Order No:006 (SIGNATURE) (SIGNATURE) PENS Approval Level INDIANA Department of Transportation APPROVED FOR LOCAL PUBLIC AGENCY (TITLE) (DATE) (TITLE) (DATE) SUBMITTED FOR CONSIDERATION APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Name of Approver Date Date:06/22/2011 Page: 4 4. a Tuesday, June 21, 2011 Rob Surber Butler, Fairman and Seufert, Inc. 8450 Westfield Road Suite 300 Indianapolis, IN 46240 RE: INDOT Contract No. R- 29657 -A; Additional Truss Repair Revised Rob, Upon removal of the gusset plates, some of the ends of the lower chord angles behind the gusset plates were deteriorated past repair. The plans called to replace five (5) lower chord angles plus the eight (8) lower chord angles on both the center span four (4) each truss. We were instructed to replace ten (10) additional lower chord angles. The following breakdown is the price increase to replace those angles. Labor: 3 men x 4 days x 8 hrs x $70.00 /hr $6,720.00 Crane: 8 hr x $150.00 $1,200.00 Drill: 4 days x $56.175 $224.70 Drill bits: 2 $112.57 $225.14 Torch: one set of tanks $170.73 $170.73 Bolts: stitch plates 6 x 12 72 $100.00 $720.00 Steel: 1,857 lbs. x $0.78 x 1.1 $1,593.31 Total $10,853.88 There are 136 rivets, 10 per plate plus 7 to hold the bottom chord angles to the plate. We will give a credit of $2,720.00 ($20.00 per rivet). The locations of the rivets /bolts are hidden and can not be seen by the public crossing the bridge. GRAND TOTAL $10,853.88 $2,720.00 $8,133.88 Richard A. Harvey VP AN EQUAL OPPORTUNITY EMPLOYER George R. Harvey Son, Inc. 964 N. State Road 39 Danville, IN 46122 Office 317.745.5169 Fax 317.745.2733