HomeMy WebLinkAboutEagle Valley/2/Chesterton Drainage/+$43,230.18TO: Lisa Scott
Engineering Admininstration
City of Carmel Indiana
One Civic Square
Carmel, IN 46032
I. You are directed to make the following changes in this Contract:
a. Add new pay items to the contract for additional work as follows: Remove and restore
concrete end sections, common excavation, RCP fabricated tee manhole, RCP fabricated
bend, milling asphalt pavement, lowering of water mains for Carmel Water Company and
manhole structure change.
ITEM
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: W.D.C. NO.:
Other:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order
Contract Price will be increased /decreased by this Change Order
New Contract Price including this Change Order
Contract Time prior to this Change Order Days
Net increased /decreased resulting from this Change Order
Current Contract Time including this Change Order
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended
American Structurepoint, Inc.
ENGINEER
7260 Shadeland Station
Address
Indianapolis, IN 46256
City State /Zip
By: By:
DAVID ACL{Rt.A
Phone: 3r1— 211 -1 S63 Phone: 3f
Date: 7 1 It
CITY OF CARMEL
CONTRACT CHANGE ORDER NO.: 2
DATE: July 20, 2011
PROJECT NAME: Chesterton Subdivision Drainage Improvements
CITY REQ. NO.:
CITY PO NO.: 10 -12
CITY PO DATE:
SCHEDULED ADJUSTMENT
AMOUNT OR DAYS
The Above Changes Are
Accepted
Eagle Valley, Inc.
CONTRACTOR
3401 North Racewa Road
Address
Indianapolis _N 462
City /State /Zip
Date:
2//11/1
1,223,589.25
43,230.18
1,266,819.43
5/1/2011 Completion Date
0 Days
5/1/2011 Completion Date
Approved
James Brainard, Mayor
Lori Watso
A
,ST:
Diana Cordray, Cfr Treasurer
Date:
i /f
ael McB tile, City gineer
Mary A- n Burke, Member
Member
S-
City of Carmel
Contract Modification
Contract: _Carmel 10 -12, Chesterton Subdivision Drainage Improvements
7/18/2011 7:47 PM
FieldManager 4.5a
Cont. Mod.
Number
2
Revision
Number
2
Cont. Mod.
Date
7/18/2011
Net Change
$43,230.18
Awarded Contract Amount
$860,590.75
Route
Contract Location
Chesterton Subdivision
Short Description
Change Order 2
Description of Changes
Add new pay items to the contract for additional work as follows: Remove and restore concrete end sections, commor
excavation, RCP fabricated tee manhole, RCP fabricated bend, milling asphalt pavement, lowering of water mains for Carmel
Water Company and manhole structure change.
New Items
Project: Carmel #10 -12, Chesterton Subdivision Drainage Improvements
Category: 1, Chesterton Subdivision Drainage Improvements
Item Description Item Code Prop.Ln. ItemType Unit Proposed Qty. Unit Price Dollar Value
End Section, Remove and Restore
0541 0129 CHANGE EACH 2.000 250.00000 $500.00
Reason: Pay item #0129 is being added to the contract for resetting concrete end sections due to changes in the field as directed by
the City of Carmel Engineering Department. The end sections had already been installed and changes were made to location and
elevation of end sections to avoid steep ditches being created adjacent roads.
Common Excavation
_0542 0130 CHANGE CYD 10.000 18.00000 $180.00
Reason: Pay item #0130 is being added to the contract for excavation necessary onsite to make changes to drainage system as
directed by the City of Carmel Engineering Department.
Manhole, 48 IN. Fabricated Tee #21B, 0543 0131 CHANGE EACH 2.000 3,982.00000 $7,964.00
#19B)
Reason: Pay item #0131 is being added to the contract for reinforced concrete pipe fabricated tees that were used in the changes
made to the alignment to the Alternate #1 storm pipe layout due to an AT &T utility conflict. The City of Carmel Engineering
Department required an access point at the "blind" bends in the storm pipe alignment so the contractor was directed to install these
tees.
Fitting, 48 IN. RCP Fabricated Bend _0544 0132 CHANGE EACH 2.000 3,626.00000 $7,252.00
(#22B, #20B)
Reason: Pay item #0132 is being added to the contract for reinforced concrete pipe bends that were used in the changes made to the
alignment to the Alternate #1 storm pipe layout due to an AT &T utility conflict. The contractor used the fabricated bends in lieu of the
concrete manholes as shown on the Alternate #1 Plan to allow the storm pipe to be installed between an AT &T utility and existing
utility poles; this was acceptable to the City of Carmel Engineering Department.
Contract: _Carmel 10 -12
Cont. Mod.: 2, Rev. 2 Page 1 of 2
City of Carmel
Item Description
Milling Asphalt Pavement
Manhole, with Casting #18B)
Contract Modification
New Items
Project: Carmel #10 -12, Chesterton Subdivision Drainage Improvements
Category: 1, Chesterton Subdivision Drainage Improvements
Item Code Prop.Ln. ItemType Unit Proposed Qty. Unit Price Dollar Value
0545 0133 CHANGE SYD 3,658.000 3.71000 $13,571.18
Reason: Pay item #0133 is being added to the contract for changes in the pavement removal operation. The existing pavement
thickness on Lincoln Boulevard was acceptable to the City of Carmel Engineering Department so the road was only removed over the
storm pipe alignment instead of the entire road as shown in the original bid documents. The City of Carmel will allow a bid item
adjustment due to change of scope on the project.
Lowered Water Mains for Carmel Water _0546 0134 CHANGE EACH 2.000 4,287.00000 $8,574.00
Company
Reason: Pay item #0134 is being added to the contract for work performed to lower a water main for the Carmel Water Company. The
water main lowering was necessary for the installation of the new storm pipe system per the original bid documents. There were two
locations on the contract to lower the water main and the City of Carmel Engineering Department authorized this work to be added to
this contract.
0549 0135 CHANGE EACH 1.000 5,189.00000 $5,189.00
Reason: Pay item #0135 is being added to the contract for the revised concrete manhole that is necessary to change storm pipe
alignment to head west instead of south for the accepted alternate storm pipe plan.
Subtotal for Project Carmel #10 -12: $43,230.18
FEDERAL PARTICIPATION ACTION BY F.H.W.A.
Approved Not Eligible
See Letter Dated
(Signature) (Date)
Contract: _Carmel 10 -12 Cont. Mod.: 2, Rev. 2
7/18/2011 7:47 PM
FieldManager 4.5a
Subtotal for Category 1: $43,230.18
Page 2 of 2
Item
No.
Description
Quantity
Unit
Unit
Price
Total
10
ASPHALT PAVEMENT, REMOVE
0.00
SYS
$3.50
$0.00
32
INLET, TYPE E WITH CASTING
20
EA
$1,722.00
$34,440.00
37
HMA INTERMEDIATE, TYPE A, 19.0 MM
0.00
TON
$55.00
$0.00
38
HMA BASE, TYPE B
0.00
TON
$53.00
$0.00
40
COMPACTED AGREGGATE, NO. 53 BASE
2,513.10
TON
$13.00
$32,670.30
10A
ASPHALT PAVEMENT, REMOVE
2,567.00
SYS
$6.29
$16,146.43
36A
HMA SURFACE, TYPE A, 9.5 MM (1 -1/2
0.00
TON
$69.16
$0.00
37A
HMA INTERMEDIATE, TYPE A, 19.0 MM (2
419.10
TON
$64.84
$27,173.40
38A
HMA BASE, TYPE B (3
457.27
TON
$60.59
$27,703.70
60A
MILLING
3,658.00
SYS
$3.71
$13,571.18
61
CONCRETE END SECTION, 12 IN (REMOVE/RESET)
2
EA
$250.00
$500.00
62
COMMON EXCAVATION,
10 p
CYDS
$18.00
$180.00
City of Carmel
Chesterton Subdivision Drainage Improvements
November 4, 2010
Denotes Base Bid Line Item with Different Quantity from Field Manager Report
Denotes New Base Bid Line Item (for Street Restoration Altemate)
Denotes New Base Bid Line Item
TOTAL AMOUNT:
$302,085.00
CONTRACT ITEMS AND UNIT PRICES
2010
City of Carmel
Project No. 10-12 Alternate #1 Revised Bid November 9,
Chesterton Subdivision Drainage Improvements
Item No.
Description
Estimated
Quantity
Unit
Unit
Price
Total Price
for Item
ALTERNATE #1 (REVISED BID)
2
RIP RAP, REMOVE AND RESTORE
296
SYS
$17.00
55,032.00
3
CURB AND GUTTER, CONCRETE, REMOVE
25
LFT
$10.00
$250.00
4
ROAD SIGN, REMOVE AND RESTORE
1
EA
$300.00
$300.00
5
ASPHALT, REMOVE
40
SYS
$5.00
$200.00
8
END SECTION, 18 IN., REMOVE
1
EA
$305.00
$305.00
9
TREE
5
EA
$825.00
54,125.00
10
CURB AND GUTTER, CONCRETE
25
LFT
$30.00
$750.00
11
PORTLAND CEMENT CONCRETE PAVEMENT, 12 IN.
40
SYS
$65.00
$2,600.00
12
HMA SURFACE, TYPE B, 9.5 MM
3
TON
$150.00
5450.00
17
COMPACTED AGREGGATE, NO. 53 BASE
7
TON
$13.00
$91.00
20
FLOWABLE BACKFILL
90
CYS
$55.00
$4,950.00
21
PIPE, CIRCULAR, RCP, 18 IN.
8
LFT
565.00
$520.00
22
PIPE, CIRCULAR, RCP, 48 IN
1,450
LFT
$132.00
$191,400.00
24
CONCRETE ANCHOR, 481N.
1
EA
$1,225.00
$1,225.00
25
MANHOLE, WITH CASTING #17, #24B, #23B)
3
EA
54,237.00
$12,711.00
26
STRUCTURAL BACKFILL
1,847
CYS
$18.75
$34,631.25
28
EROSION CONTROL BLANKET
4,764
SYS
$2.50
$11,910.00
29
SEED MIXTURE, R
250
LBS
58.00
52,000.00
30
MULCHING MATERIAL
0.5
TON
$350.00
$175.00
31
FERTILIZER
0.8
TON
5975.00
$731.25
32
GEOTEXTILE
13.0
SYS
$5.00
565.00
33
RIP RAP REVETMENT
105.0
TON
$46.00
$4,830.00
34
PIPE, 18 IN., REMOVE
8
LFT
$17.00
$136.00
35
CUT AND RECAP SANITARY LATERAL
1
EA
$215.00
$215.00
36
SILT FENCE
1,385
LFT
51.50
$2,077.50
37"
MANHOLE, WITH CASTING #18B)
1
EA
$5,189.00
55,189.00
38'
MANHOLE, 48" DIA. FABRICATED TEE (#21B, #19B)
2
EA
$3,982.00
$7,964.00
39"
FITTING, 48" DIA. FABRICATED BEND (#22B, #20B)
2
EA
$3,626.00
$7,252.00
TOTAL AMOUNT:
$302,085.00
To:
City of Carmel Utilities
3450 W. 131 Street
Westfield, Indiana 46074
Attn: Mr. John Duffy
Re: Water Main Lowerings
1. Lowered Water Mains for
Chesterton Drainage Project
ICE
Item No.
Description I Quantity 1 Unit I Unit Price 1 Total Price
1
i
Balance Due This Invoice
$8,574.00
Please make all Checks payable to:
Eagle Valley Inc.
3401 North Raceway Road
Indianapolis, Indiana 46234
Thank -you for the business!!!!
2.00 each $4,287.00 $8,574.00
3401 North Raceway Road o Indianapolis, Indiana 46234
Phone: (317) 291 -8104 o Fax: (317) 291 -8786
Date: Oct -18 -2010
No: 0908 -10998