HomeMy WebLinkAboutHunt Paving/1/Village of Mt. Carmel Drainage/+$32,335.16CITY OF CARMEL
TO: CONTRACT CHANGE ORDER NO.: 1
You are directed to make the following changes in this Contract:
(Brief Description)
ITEM AMOUNT
1. Sanitary Sewer Relocation Str 703 3,041.87
2. Sanitary Sewer Relocation 23 Bennett 2,009.94
3. 19 "x30" Elliptical Pipe on Village Dr. 4,087.68
4. 19 "x30" Elliptical Pipe End Sections Village Dr. 8,701.74
5. Connection to manhole at 146 Street 9,888.95
6. Water Line Relocations (2) on Bennett 4,604.88
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order 751,825.05
Contract Price will be increased by this Change Order 32,335.16
New Contract Price including this Change Order 784,160.21
Contract Time Prior to this Change Order Days Completion Date
Net increased /decreased resulting from this Change Order Days
Current Contract Time including this Change Order Days Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are
Recommended Accepted:
Hannum, Wagle Cline The Hunt Paving Company, Inc.
Engineering
ENGINEER CONTRACTOR
151 N. Delaware, Suite 800 P.O. Box 42517
Address Address
Indianapolis, IN 46204 Indianapolis, IN 46242
City /State /Zip City /State /Zip
By: By:
Matt Maple Justin Noltinc
(pri am 7 (print name
(signature) (sigrYature)
Phone:317- 347 -3663
Date: 12/1/10
DATE: 12/1/10
PROJECT NAME: Village of Mt. Carmel Drainage Project
CITY REQ. NO.: 10 -08D
CITY PO NO.: 27450
CITY PO DATE: 9/3/10 AFPnov:p AS TO FORM BY
Date: 12/1/10
Phone:317- 241 -8313
OR DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be
considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other:
Approved:
Diana Cordray, C -Treasurer
Date:
T. McBride
City Engine
Date: /2 ,2 2A'P
1D
10/07/10
Gary Duncan
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
RE: Sanitary Lateral Relocation at Sta. 3 +00 Bennett Road (Str. 703)
Gary;
Please find below our T &M Invoice for relocating the Sanitary lateral on 10/6/2010.
approx.
item description quantity unit unit price total price
EWA Relocate Sanitary 1.00 ea 3,041.87 3,041.87
Lateral
If you should have any questions or require any additional information please give me a call. Please
let us know if this is approved, so we can plan our work.
Thank you,
THE HUNT PAVING COMPANY, INC.
Justin Nolting
cc: JF, EH
The Hunt Paving Company, Inc.
Post Office Box 42517
Indianapolis, IN 46242 -0517
317/241 -8313
Fax 317/487 -5779
COMPANY NAME
THE HUNT PAVING COMPANY
DATE:
DAY:
PAGE: 1
OF: 1
PURCHASE ORDER NO.
NA
RELEASE NO.
NA
A.R. NO.
JOB NO. 648
1 ea
JOB DESCRIPTION
Relocate Sanitary Lateral
LABOR
EMPLOYEE NAME
EMPLOYEE
CRAFT
REG HRS
OT HRS
DT HRS
RATE
REG HRS
RATE
OT HRS
RATE
DT HRS
TOTAL
laborer
4.5
0
35.57
47.95
160.07
forman
9
0
48.61
66.94
437.49
Combo Man
9
0
46.33
63.52
416.97
TOTAL LABOR
1014.53
SUBCONTRACTOR
NAME
DESCRIPTION
TOTAL
Beaver trucking
4 hrs $65 /hr
260.00
TOTAL SUBCONTRACTOR
260.00
MATERIALS
QUANTITY
DESCRIPTION
TOTAL
10'
6" SDR 35
42.03
2
6" 45's
16.42
1
6" Coupling
5.50
11.5
Cy of Flowable Fill
598.00
5
Cy of Class C Concrete
365.00
TOTAL MATERIALS
1026.95
EQUIPMENT and small tools
EQUIPMENT
HRS
EQUIPMENT TYPE
RATE
TOTAL
Markup:
3/4 ton pick up truck
4
hour
18.93
$75.72
Mini Exc.
4
hour
52.82
$211.28
TOTALS
TOTAL LABOR 20%
1217.44
TOTAL MATERIAL 12%
1150.18
TOTAL EQUIPMENT 12%
321.44
TOTAL SUBS 7%
278.20
TOTAL INSURANCE TAXES
74.61
EQUIPMENT TOTAL
287.00
PAGE TOTAL
3041.87
INSPECTOR APPROVAL
signature
date
2010
10/08/10
Gary Duncan
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
RE: Sanitary Lateral Relocation at 23 Bennett Road
Gary;
Please find below our T &M Invoice for relocating the Sanitary lateral on 10/7/2010.
approx.
item description quantity unit unit price total price
EWA Relocate Sanitary 1.00 ea 2,009.94 2,009.94
Lateral
If you should have any questions or require any additional information please give me a call. Please
let us know if this is approved, so we can plan our work.
Thank you,
THE HUNT PAVING COMPANY, INC.
Justin Nolting
cc: JF, EH
The Hunt Paving Company, Inc.
Post Office Box 42517
Indianapolis, IN 46242 -0517
317/241 -8313
Fax 317/487 -5779
COMPANY NAME
THE HUNT PAVING COMPANY
DATE:
DAY:
PAGE: 1
OF: 1
PURCHASE ORDER NO.
NA
RELEASE NO.
NA
A.R. NO.
JOB NO. 648
1 ea
JOB DESCRIPTION
Relocate Sanitary Lateral
LABOR
EMPLOYEE NAME
EMPLOYEE
CRAFT
REG HRS
OT HRS
DT HRS
RATE
REG HRS
RATE
OT HRS
RATE
DT HRS
TOTAL
laborer
2
0
35.57
47.95
71.14
forman
4
0
48.61
66.94
194.44
Combo Man
4
0
46.33
63.52
185.32
TOTAL LABOR
450.90
SUBCONTRACTOR
NAME
DESCRIPTION
TOTAL
Beaver trucking
2 hrs $65 /hr
130.00
TOTAL SUBCONTRACTOR
130.00
MATERIALS
QUANTITY
DESCRIPTION
TOTAL
1
TON #8 stone
14.85
2
6" 45's
16.42
1
6" Coupling
5.50
11.5
Cy of Flowable Fill
598.00
5
Cy of Class C Concrete
365.00
TOTAL MATERIALS
999.77
EQUIPMENT and small tools
EQUIPMENT
HRS
EQUIPMENT TYPE
RATE
TOTAL
Markup:
3/4 ton pick up truck
2
hour
18.93
$37.86
Mini Exc.
2
hour
52.82
$105.64
TOTALS
TOTAL LABOR 20%
541.08
TOTAL MATERIAL 12%
1119.74
TOTAL EQUIPMENT 12%
160.72
TOTAL SUBS 7%
139.10
TOTAL INSURANCE TAXES
49.30
EQUIPMENT TOTAL
143.50
PAGE TOTAL
2009.94
INSPECTOR APPROVAL
signature
date
2010
1D
10/26/10
Gary Duncan
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
The Hunt Paving Company, Inc.
RE: 19" x 30" Elliptical Pipe and End Sections
Gary;
Please find below our price for changing 3 drive culverts to 19" x 30" Elliptical Pipe.
Post Office Box 42517
Indianapolis, IN 46242 -0517
317/241 -8313
Fax 317/487 -5779
approx.
item description quantity unit unit price total price
EWA 19" x 30" Elliptical Pipe 48.00 LF 85.16 4,087.76
EWA 19" x 30" Elliptical Pipe End 6.00 EA $1,450.29 8,701.71
Sections
If you should have any questions or require any additional information please give me a call. Please
let us know if this is approved, so we can plan our work.
Thank you,
THE HUNT PAVING COMPANY, INC.
Justin Nolting
cc: JF, EH
COMPANY NAME
THE HUNT PAVING COMPANY
DATE:
DAY:
PAGE: 1
OF: 1
PURCHASE ORDER NO.
NA
RELEASE NO.
NA
A.R. NO.
JOB NO. 648
48 LF
JOB DESCRIPTION
Elliptical Pipe
LABOR
EMPLOYEE NAME
EMPLOYEE
CRAFT
REG HRS
OT HRS
DT HRS
RATE
REG HRS
RATE
OT HRS
RATE
DT HRS
TOTAL
laborer
8
35.57
284.56
forman
4
48.61
194.44
Combo Man
4
40.67
162.68
Operator
4
46.33
185.32
TOTAL LABOR
827.00
SUBCONTRACTOR
NAME
DESCRIPTION
TOTAL
Beaver trucking
4 hrs $65 /hr
260.00
TOTAL SUBCONTRACTOR
260.00
MATERIALS
QUANTITY
DESCRIPTION
TOTAL
48
LF of 19" x 30" Elliptical Pipe $40.70/If
1953.60
1
LS Misc Material
75.00
TOTAL MATERIALS
2028.60
EQUIPMENT and small tools
EQUIPMENT
HRS
EQUIPMENT TYPE
RATE
TOTAL
Markup:
3/4 ton pick up truck
4
hour
18.93
$75.72
Flat Bed
4
hour
27.06
$108.24
710 Backhoe
4
hour
53.31
$213.24
TOTALS
TOTAL LABOR 20%
992.40
TOTAL MATERIAL 12%
2272.03
TOTAL EQUIPMENT 12%
444.86
TOTAL SUBS 7%
278.20
TOTAL INSURANCE TAXES
100.27
EQUIPMENT TOTAL
397.20
PAGE TOTAL
4087.76
INSPECTOR APPROVAL
signature
date
2010
COMPANY NAME
THE HUNT PAVING COMPANY
DATE:
DAY:
PAGE: 1
OF: 1
PURCHASE ORDER NO.
NA
RELEASE NO.
NA
A.R. NO.
JOB NO. 648
6 EA
JOB DESCRIPTION
Elliptical Pipe End Sections
LABOR
EMPLOYEE NAME
EMPLOYEE
CRAFT
REG HRS
OT HRS
DT HRS
RATE
REG HRS
RATE
OT HRS
RATE
DT HRS
TOTAL
laborer
16
35.57
569.12
forman
8
48.61
388.88
Combo Man
8
40.67
325.36
Operator
8
46.33
370.64
TOTAL LABOR
1654.00
SUBCONTRACTOR
NAME
DESCRIPTION
TOTAL
TOTAL SUBCONTRACTOR
0.00
MATERIALS
QUANTITY
DESCRIPTION
TOTAL
6
EA of 19" x 30" Elliptical Pipe End Sections $900.00 /EA
5400.00
TOTAL MATERIALS
5400.00
EQUIPMENT and small tools
EQUIPMENT
HRS
EQUIPMENT TYPE
RATE
TOTAL
Markup:
3/4 ton pick up truck
4.5
hour
18.93
$85.19
Flat Bed
4
hour
27.06
$108.24
710 Backhoe
4
hour
53.31
$213.24
TOTALS
TOTAL LABOR 20%
1984.80
TOTAL MATERIAL 12%
6048.00
TOTAL EQUIPMENT 12%
455.46
TOTAL SUBS 7%
0.00
TOTAL INSURANCE TAXES
213.45
EQUIPMENT TOTAL
406.67
PAGE TOTAL
8701.71
INSPECTOR APPROVAL
signature
date
2010
11/16/10
Gary,
1D
Gary Duncan
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
RE: Village of Mt. Carmel, 146th St and Village Drive
Please find our price for the work at 146th St. and Village Drive as a result of the grade
bust and issues with existing pipe.
item description quantity unit unit price total price
EWA 146th and Village Drive 1 LSUM 9,888.95 9,888.95
Should you have any questions or comments, please call me at 317 241 -8313.
Thank you,
THE HUNT PAVING COMPANY, INC.
Justin Nolting
Project Manager
cc: JF
The Hunt Paving Company, Inc.
Post Office Box 42517
Indianapolis, IN 46242 -0517
317/241 -8313
Fax 317/487 -5779
total 9,888.95
COMPANY NAME
The Hunt Paving Company
DATE: 11 -8, 11 -9
DAY:
PAGE: 1
OF
ONE 1
PURCHASE ORDER NO.
RELEASE NO.
A.R. NO.
3001
JOB NO. HPC 648
Village of Mt. Carmel
EXTRA WORK DESCRIPTION
Remove and replace structure 714 resulting from grade bust/issues
Quantity:
based on
1 Is
with existing line.
+insurance /taxes)
LABOR (base wage +fringes
EMPLOYEE
NAME
CODE
CRAFT
REG HRS
OT HRS
DT HRS
RATE
REG HRS
RATE OT HRS
RATE
DT HRS
TOTAL
Hunt Labor
see attached
spreadsheet
repairs
2,973.12
TOTAL LABOR
2,973.12
SUBCONTRACTOR
NAME
DESCRIPTION
TOTAL
Beaver Gravel
Trucking, 8.25 hrs A $65 /hr
536.25
Hardcore Sawing
Core holes for pipe in new structure
729.00
TOTAL SUBCONTRACTOR
1,265.25
MATERIALS
QUANTITY
DESCRIPTION
1 Is
misc tools, supplies, equipment
250.00
40 If
24" RCP
598.00
1 ea
5' Manhole barrel section
460.00
2.5 cy
Concrete Class C
182.50
18 cy
Flowable fill
936.00
1 Is
Permit Licensing bond for Hamilton County
100.00
TOTAL MATERIALS
2,526.50
EQUIPMENT
HOURS
TYPE OF EQUIPMENT
RATE
TOTAL
T M markup:
0.1
Ditch Witch Hydro Excay. (month)
2,996.00
299.60
mini excv rental for the week
0.00
6
Cat 322 1450
102.15
612.90
3.5
backhoe 710GJD 1605
64.45
225.58
backhoe 710G 1604
0.00
curb machine 1602
0.00
Single axle dump 1187
0.00
finish truck 1426
0.00
1
breaker 1615
41,33
41.33
10.5
pickup truck 1600
18.89
198.35
TOTALS
backhoe 1234
0.00
mech truck 1633
0.00
TOTAL LABOR 20%
3,567.74
breaker 1615
0.00
TOTAL MATERIAL 12%
2,829.68
10.5
pickup 1586
18.87
198.14
TOTAL EQUIPMENT 12%
1,857.18
Lowboy trailer 1530
0.00
TOTAL SUBS 7%
1,391.78
Lowboy 1526
0.00
TOTAL INS, BOND TAXES
242.57
pickup 1349
0.00
cure cart 1456
0.00
5
Air compressor /jack hammer
16.46
82.30
TOTAL EQUIPMENT
1658.20
PAGE TOTAL
9,888.95
TOTAL
unitprice 9,888.95 per Is 9,888.95
CONTRACTOR'S APPROVAL
12/01/10
Gary Duncan
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
RE: Water Service Relocation
Gary;
Please find below our price for relocating water services.
approx.
item description quantity unit unit price total price
EWA Relocate Water 2.00 ea 2,302.44 4,604.88
Services
If you should have any questions or require any additional information please give me a call. Please
let us know if this is approved, so we can plan our work.
Thank you,
THE HUNT PAVING COMPANY, INC.
Justin Nolting
cc: JF, EH
The Hunt Paving Company, Inc.
Post Office Box 42517
Indianapolis, IN 46242 -0517
317/241 -8313
Fax 317/487 -5779
COMPANY NAME
THE HUNT PAVING COMPANY
DATE:
DAY:
PAGE: 1
OF: 1
PURCHASE ORDER NO.
NA
RELEASE NO.
NA
A.R. NO.
JOB NO. 648
2 ea
JOB DESCRIPTION
Re locate Water Services
LABOR
EMPLOYEE NAME
EMPLOYEE
CRAFT
REG HRS
OT HRS
DT HRS
RATE
REG HRS
RATE
OT HRS
RATE
DT HRS
TOTAL
40.67
56.46
0.00
laborer
2
0
35.57
47.95
71.14
forman
2
0
48.61
66.94
97.22
operator
0
0
46.33
63.52
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL LABOR
168.36
SUBCONTRACTOR
NAME
DESCRIPTION
TOTAL
Boring Sub
2 ea. $1923.60
3847.20
TOTAL SUBCONTRACTOR
3847.20
MATERIALS
QUANTITY
DESCRIPTION
TOTAL
1 Is
misc material for temporary splices
80.00
TOTAL MATERIALS
80.00
EQUIPMENT and small tools
EQUIPMENT
HRS
EQUIPMENT TYPE
RATE
TOTAL
Markup:
3/4 ton pick up truck
1
hour
18.96
$18.96
backhoe
1
hour
55.85
$55.85
TOTALS
TOTAL LABOR 20%
202.03
TOTAL MATERIAL 12%
89.60
TOTAL EQUIPMENT 12%
83.80
TOTAL SUBS 7%
4116.50
TOTAL INSURANCE TAXES
112.95
EQUIPMENT TOTAL
74.81
PAGE TOTAL
4604.88
INSPECTOR APPROVAL
signature
date
2010