HomeMy WebLinkAboutHunt Paving/2/Village of Mt. Carmel Drainage/+$33,826.48TO: ITEM 1. Preperation for Trench Patching 2. Trench Patching II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. No.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order 784,160.21 Contract Price will be increased by this Change Order 33,826.48 New Contract Price including this Change Order 817,986.69 Contract Time Prior to this Change Order Days Completion Date Net increased /decreased resulting from this Change Order Days Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended Hannum, Wagle Cline Engineering ENGINEER 151 N. Delaware, Suite 800 Address Indianapolis, IN 46204 City /State /Zip By: Matt Mapl Date: 3/1/11 CITY OF CARMEL You are directed to make the following changes in this Contract: (Brief Description) i gnature) Phone:317- 347 -3663 CONTRACT CHANGE ORDER NO.: 2 DATE: 3/1/11 PROJECT NAME: Village of Mt. Carmel Drainage Project CITY REQ. NO.: 10 -08D CITY PO NO.: 27450 CITY PO DATE: 9/3/10 AMOUNT 11,697.25 22,129.23 The Above Changes Are Accepted: The Hunt Paving Company, Inc. CONTRACTOR P.O. Box 42517 Address Indianapolis, IN 46242 City /State /Zip By: Justin Noltin (pri (s nature) one:317- 241 -8313 Date: 3/1/11 OR DAYS iana Cordray, C k- Treasurer Date: „,3' /(o- Michael T. McBri.e City Engineer Date: 12/15/10 Gary Duncan City of Carmel Department of Engineering One Civic Square Carmel, IN 46032 RE: Trench Patching Gary; Below is the actual cost of the Trench patching: item description quantity unit unit price total price EWA Below is the actual cost of prepping the existing trenches for the asphalt patching: item description quantity unit unit price total price EWA Prep for Asphalt If you should have any questions or require any additional information please give me a call. Thank you, Trench 146.19 TON 151.37 22,129.23 Patching THE HUNT PAVING COMPANY, INC. Justin Nolting cc: JF, EH The Hunt Paving Company, Inc. 1 Post Office Box 42517 Indianapolis, IN 46242 -0517 317/241 -8313 Fax 317/487 -5779 LS 11,697.25 11,697.25 COMPANY NAME THE HUNT PAVING COMPANY DATE: DAY: PAGE: 1 OF: 1 PURCHASE ORDER NO. NA RELEASE NO. NA A.R. NO. JOB NO. 648 120 JOB DESCRIPTION Trench Patching LABOR EMPLOYEE NAME EMPLOYEE CRAFT REG HRS OT HRS DT HRS RATE REG HRS RATE OT HRS RATE DT HRS TOTAL laborer 0 0 35.57 47.95 0.00 forman 0 0 48.61 66.94 0.00 Combo Man 0 0 46.33 63.52 0.00 TOTAL LABOR 0.00 SUBCONTRACTOR NAME DESCRIPTION TOTAL E B Paving HMA Surface Type B with Tack, 146.19 TON $138.00/TON 20174.22 TOTAL SUBCONTRACTOR 20174.22 MATERIALS QUANTITY DESCRIPTION TOTAL TOTAL MATERIALS 0.00 EQUIPMENT and small tools EQUIPMENT HRS EQUIPMENT TYPE RATE TOTAL Markup: Broom 0 hour 41.48 $0.00 3/4 ton pick up truck 0 hour 18.93 $0.00 Mini Exc. hour 52.82 $0.00 Roller Paver Flat Bed 0 hour 27.06 $0.00 TOTALS TOTAL LABOR 20% 0.00 TOTAL MATERIAL 12% 0.00 TOTAL EQUIPMENT 12% 0.00 TOTAL SUBS 7% 21586.42 TOTAL INSURANCE TAXES 542.81 EQUIPMENT TOTAL 0.00 PAGE TOTAL 22129.23 INSPECTOR APPROVAL signature date 2010 COMPANY NAME The Hunt Paving Company DATE: 12 -2, 12 -3 DAY: PAGE: 1 OF: ONE 1 PURCHASE ORDER NO. RELEASE NO. A.R. NO. 3006 JOB NO. HPC 648 Village of Mt. Carmel EXTRA WORK DESCRIPTION This work is_ for prepping the trenches for asphalt, trimming back Quantity: based on 1 Is sharp edges, cleaning and sawing /removing pavement at edges. LABOR (base wage +fringes +insuranceltaxes) EMPLOYEE NAME CODE CRAFT REG HRS OT HRS DT HRS RATE REG HRS RATE OT HRS RATE DT HRS TOTAL Hunt Labor see attached spreadsheet 6,368.40 TOTAL LABOR 6,368.40 SUBCONTRACTOR NAME DESCRIPTION TOTAL Beaver Gravel Trucking, 10 hrs (a) $65 /hr 650.00 TOTAL SUBCONTRACTOR 650.00 MATERIALS QUANTITY DESCRIPTION 1 Misc. Materials $400 400.00 TOTAL MATERIALS 400.00 EQUIPMENT HOURS TYPE OF EQUIPMENT RATE TOTAL T M markup: Ditch Witch Hydro Excay. (month) 2,996.00 0.00 18 Link Belt Mini Excay. 36.58 658.44 Cat 322 1450 102.15 0.00 15 backhoe 71OGJD 1605 64.45 966.75 backhoe 710G 1604 0.00 2 Broom (Waldron) 41.48 82.96 4 Flat Bed 1181 27.06 108.24 finish truck 1426 0.00 breaker 1615 41.33 0.00 12 pickup truck 1600 18.89 226.68 TOTALS backhoe 1234 0.00 mech truck 1633 0.00 TOTAL LABOR 20% 7,642.08 breaker 1615 0.00 TOTAL MATERIAL 12% 5, 448.00 15 pickup 1586 18.87 283.05 TOTAL EQUIPMENT 12% 2,605.25 Lowboy trailer 1530 0.00 TOTAL SUBS 7% 715.00 Lowboy 1526 0.00 TOTAL INS, BOND TAXES 286.92 pickup 1349 0.00 cure cart 1456 0.00 Air compressor /jack hammer 16.46 0.00 TOTAL EQUIPMENT 2326.12 PAGE TOTAL 11,697.25 TOTAL unitprice 11,697.25 per Is 11,697.25 CONTRACTORS APPROVAL