HomeMy WebLinkAboutHunt Paving/2/Village of Mt. Carmel Drainage/+$33,826.48TO:
ITEM
1. Preperation for Trench Patching
2. Trench Patching
II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be
considered a part of this Change Order: R.F.P.: W.D.C. No.:
Other:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order 784,160.21
Contract Price will be increased by this Change Order 33,826.48
New Contract Price including this Change Order 817,986.69
Contract Time Prior to this Change Order Days Completion Date
Net increased /decreased resulting from this Change Order Days
Current Contract Time including this Change Order Days Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended
Hannum, Wagle Cline
Engineering
ENGINEER
151 N. Delaware, Suite 800
Address
Indianapolis, IN 46204
City /State /Zip
By:
Matt Mapl
Date: 3/1/11
CITY OF CARMEL
You are directed to make the following changes in this Contract:
(Brief Description)
i gnature)
Phone:317- 347 -3663
CONTRACT CHANGE ORDER NO.: 2
DATE: 3/1/11
PROJECT NAME: Village of Mt. Carmel Drainage Project
CITY REQ. NO.: 10 -08D
CITY PO NO.: 27450
CITY PO DATE: 9/3/10
AMOUNT
11,697.25
22,129.23
The Above Changes Are
Accepted:
The Hunt Paving Company, Inc.
CONTRACTOR
P.O. Box 42517
Address
Indianapolis, IN 46242
City /State /Zip
By:
Justin Noltin
(pri
(s nature)
one:317- 241 -8313
Date: 3/1/11
OR DAYS
iana Cordray, C k- Treasurer
Date: „,3' /(o-
Michael T. McBri.e
City Engineer
Date:
12/15/10
Gary Duncan
City of Carmel
Department of Engineering
One Civic Square
Carmel, IN 46032
RE: Trench Patching
Gary;
Below is the actual cost of the Trench patching:
item description quantity unit unit price total price
EWA
Below is the actual cost of prepping the existing trenches for the asphalt patching:
item description quantity unit unit price total price
EWA Prep for Asphalt
If you should have any questions or require any additional information please give me a call.
Thank you,
Trench 146.19 TON 151.37 22,129.23
Patching
THE HUNT PAVING COMPANY, INC.
Justin Nolting
cc: JF, EH
The Hunt Paving Company, Inc.
1
Post Office Box 42517
Indianapolis, IN 46242 -0517
317/241 -8313
Fax 317/487 -5779
LS 11,697.25 11,697.25
COMPANY NAME
THE HUNT PAVING COMPANY
DATE:
DAY:
PAGE: 1
OF: 1
PURCHASE ORDER NO.
NA
RELEASE NO.
NA
A.R. NO.
JOB NO. 648
120
JOB DESCRIPTION
Trench Patching
LABOR
EMPLOYEE NAME
EMPLOYEE
CRAFT
REG HRS
OT HRS
DT HRS
RATE
REG HRS
RATE
OT HRS
RATE
DT HRS
TOTAL
laborer
0
0
35.57
47.95
0.00
forman
0
0
48.61
66.94
0.00
Combo Man
0
0
46.33
63.52
0.00
TOTAL LABOR
0.00
SUBCONTRACTOR
NAME
DESCRIPTION
TOTAL
E B Paving
HMA Surface Type B with Tack, 146.19 TON $138.00/TON
20174.22
TOTAL SUBCONTRACTOR
20174.22
MATERIALS
QUANTITY
DESCRIPTION
TOTAL
TOTAL MATERIALS
0.00
EQUIPMENT and small tools
EQUIPMENT
HRS
EQUIPMENT TYPE
RATE
TOTAL
Markup:
Broom
0
hour
41.48
$0.00
3/4 ton pick up truck
0
hour
18.93
$0.00
Mini Exc.
hour
52.82
$0.00
Roller
Paver
Flat Bed
0
hour
27.06
$0.00
TOTALS
TOTAL LABOR 20%
0.00
TOTAL MATERIAL 12%
0.00
TOTAL EQUIPMENT 12%
0.00
TOTAL SUBS 7%
21586.42
TOTAL INSURANCE TAXES
542.81
EQUIPMENT TOTAL
0.00
PAGE TOTAL
22129.23
INSPECTOR APPROVAL
signature
date
2010
COMPANY NAME
The Hunt Paving Company
DATE: 12 -2, 12 -3
DAY:
PAGE: 1
OF:
ONE 1
PURCHASE ORDER NO.
RELEASE NO.
A.R. NO.
3006
JOB NO. HPC 648
Village of Mt. Carmel
EXTRA WORK DESCRIPTION
This work is_ for prepping the trenches for asphalt, trimming back
Quantity:
based on
1 Is
sharp edges, cleaning and sawing /removing pavement at edges.
LABOR (base wage +fringes +insuranceltaxes)
EMPLOYEE
NAME
CODE
CRAFT
REG HRS
OT HRS
DT HRS
RATE
REG HRS
RATE OT HRS
RATE
DT HRS
TOTAL
Hunt Labor
see attached
spreadsheet
6,368.40
TOTAL LABOR
6,368.40
SUBCONTRACTOR
NAME
DESCRIPTION
TOTAL
Beaver Gravel
Trucking, 10 hrs (a) $65 /hr
650.00
TOTAL SUBCONTRACTOR
650.00
MATERIALS
QUANTITY
DESCRIPTION
1
Misc. Materials $400
400.00
TOTAL MATERIALS
400.00
EQUIPMENT
HOURS
TYPE OF EQUIPMENT
RATE
TOTAL
T M markup:
Ditch Witch Hydro Excay. (month)
2,996.00
0.00
18
Link Belt Mini Excay.
36.58
658.44
Cat 322 1450
102.15
0.00
15
backhoe 71OGJD 1605
64.45
966.75
backhoe 710G 1604
0.00
2
Broom (Waldron)
41.48
82.96
4
Flat Bed 1181
27.06
108.24
finish truck 1426
0.00
breaker 1615
41.33
0.00
12
pickup truck 1600
18.89
226.68
TOTALS
backhoe 1234
0.00
mech truck 1633
0.00
TOTAL LABOR 20%
7,642.08
breaker 1615
0.00
TOTAL MATERIAL 12%
5, 448.00
15
pickup 1586
18.87
283.05
TOTAL EQUIPMENT 12%
2,605.25
Lowboy trailer 1530
0.00
TOTAL SUBS 7%
715.00
Lowboy 1526
0.00
TOTAL INS, BOND TAXES
286.92
pickup 1349
0.00
cure cart 1456
0.00
Air compressor /jack hammer
16.46
0.00
TOTAL EQUIPMENT
2326.12
PAGE TOTAL
11,697.25
TOTAL
unitprice 11,697.25 per Is 11,697.25
CONTRACTORS APPROVAL