HomeMy WebLinkAboutGradex/6/Shelborne 116th to 131st/+$68,284.62TO: Engineering Department
One Civic Square
Carmel, IN 46032
ITEM
See Attached Change Order Table
Phone: 317 -780 -1555
Date: 8/19/2011
CITY OF CARMEL
CONTRACT CHANGE ORDER NO.: 6
DATE:August 16, 2011
PROJECT NAME: Shelborne Rd. from North of 116th
to 126th St. and 131st RAB
CITY REQ. NO.:
CITY PO NO.: 0513 -10
CITY PO DATE:
I. You are directed to make the following changes in this Contract:
See Attached Exhibit A
11. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. NO.: N/A
Other:
The Above Changes Are The Above Changes Are Accepted
Recommended
CROSSROAD Gradex Inc.
ENGINEER CONTRACTOR
3417 Sherman Drive 3685 Priority Way S. Drive
Address Address
Beech Grove, IN 46107 Indianapolis IN, 46240
City /State /Zip ity /State /Zip
SCHEDULED ADJUSTMENT
AMOUNT OR DAYS
$68,284.62 69 Days
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order $4,688,402.00
Contract Price will be increased /decreased by this Change Order $68,284.62
New Contract Price including this Change Order $4,756,686.62
Contract Time prior to this Change Order 214 Days 5/29/2011 Completion Date
Net increased /decreased resulting from this Change Order 69 Days
Current Contract Time including this Change Order 283 Days 8/17/2011 Completion Date
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
v:Parker Smith
Phone: 317 -573 -3970
Date: 8/19/2011
ray, CI -Treasurer
ITEM NO.
DESCRIPTION
UNIT
UNIT PRICE
ORIGINAL
QUANTITY
ORIGINAL
AMOUNT
FINAL
QUANTITY
FINAL
AMOUNT
OVER /UNDER
*158
Office Equipment (2011 price adj.)
MONTH
$349.80
0
$0.00
6
2,098.80
$2,098.80
*159
Excavation, Common (2011 price adj.)
CYS
$0.85
0
$0.00
1221
1,037.85
$1,037.85
*160
Borrow (2011 price adj.)
CYC
$0.17
0
$0.00
7895
1,342.15
$1,342.15
*161
Revetment, riprap (2011 price adj.)
TON
$1.71
0
$0.00
10
17.10
$17.10
*162
Geotextiles (2011 price adj.)
SYS
$0.49
0
$0.00
25
12.25
$12.25
*163
Subgrade treatment, Type 1A (2011
price adj.)
SYS
$0.03
0
$0.00
8820
264.60
$264.60
*164
Structure Backfill, Type 1 (2011 price
adj.)
CYS
$1.17
0
$0.00
521.98
610.72
$610.72
*165
Compacted Aggregate, NO. 53 Base
(2011 price adj.)
TON
$2.71
0
$0.00
588
1,593.48
$1,593.48
*166
Colored &Jointed concrete, 7" (2011
price adj.)
SYS
$4.40
0
$0.00
145.75
641.30
$641.30
*167
Colored Jointed concrete, 4" (2011
price adj.)
SYS
$4.40
0
$0.00
16
70.40
$70.40
*168
HMA Surface, Type C, 9.5mm (2011
price adj.)
TON
$6.60
0
$0.00
1847.39
12,192.77
$12,192.77
*169
HMA Intermediate, Type C, 19.Omm,
(2011 price adj.)
TON
$4.95
0
$0.00
918.15
4,544.84
$4,544.84
*170
HMA Base, Type C, 25.Omm (2011 price
adj.)
TON
$4.40
0
$0.00
3554.22
15,638.57
$15,638.57
*171
HMA Intermediate, Type C, OG,
19.Omm (2011 price adj.)
TON
$4.40
0
$0.00
1340.38
5,897.67
$5,897.67
*172
Asphalt for Tack Coat (2011 price adj.)
TON
$11.00
0
$0.00
29.46
324.06
$324.06
*173
HMA Surface, Type B (2011 price adj.)
TON
$6.60
0
$0.00
119.64
789.62
$789.62
*174
HMA Intermediate, Type B (2011 price
adj.)
TON
$4.40
0
$0.00
360.74
1,587.26
$1,587.26
*175
Curb ramp, Concrete (all types) (2011
price adj.)
SYS
$4.40
0
$0.00
137.25
603.90
$603.90
*176
Sidewalk, concrete, reconstruction 4"
(undistributed) (2011 price adj.)
SYS
$2.20
0
$0.00
93.33
205.33
$205.33
*177
Combined Curb Gutter, Type II (2011
price adj.)
LFT
$0.82
0
$0.00
2557
2,096.74
$2,096.74
*178
Combined Curb Gutter, Type III (2011
price adj.)
LFT
$0.82
0
$0.00
2682.5
2,199.65
$2,199.65
CITY OF CARMEL
Shelborne Road from North of 116th to 126th Street and 131st Roundabout
Project #06 -21
CHANGE ORDER TABLE
EXHIBIT A
*179
Combined Curb Gutter, Roll, Modified
(2011 price adj.)
LFT
$0.82
0
$0.00
350
287.00
$287.00
*180
Straight concrete curb (2011 price adj.)
LFT
$0.55
0
$0.00
315
173.25
$173.25
*181
PCCP for Approaches, 6" (2011 price
adj.)
SYS
$1.65
0
$0.00
199.95
329.92
$329.92
*182
HMA for Drive approaches (2011 price
adj.)
TON
$6.60
0
$0.00
0
$0.00
*183
Pipe, Type 4, Circular, 6 double wall,
smooth interior (2011 price adj.)
LFT
$0.24
0
$0.00
1588
381.12
$381.12
*184
Pipe, type 2, Circular, 12" (2011 price
adj.)
LFT
$0.65
0
$0.00
558.5
363.03
$363.03
*185
Pipe, type 2, Circular, 15" (2011 price
adj.)
LFT
$0.73
0
$0.00
48
35.04
$35.04
*186
Pipe, type 2, Circular, 24" (2011 price
adj.)
CYS
$1.20
0
$0.00
121.6
145.92
$145.92
*187
Aggregate for underdrain (2011 price
adj.)
CYS
$1.07
0
$0.00
137.6
147.23
$147.23
*188
Geotextiles for underdrain (2011 price
adj.)
SYS
$0.03
0
$0.00
1088.7
32.66
$32.66
*189
Manhole, C -4 (2011 price adj.)
EA
$21.06
0
$0.00
2
42.12
$42.12
*190
Inlet, J -10 (2011 price adj.)
EA
$15.21
0
$0.00
0
$0.00
*191
Inlet, K -10 (2011 price adj.)
EA
$19.89
0
$0.00
1
19.89
$19.89
*192
Manhole, D4 (2011 price adj.)
EA
$46.80
0
$0.00
0
$0.00
*193
Inlet, B -15 (2011 price adj.)
EA
$23,40
0
$0.00
6
140.40
$140.40
*194
Inlet, C -15 (2011 price adj.)
EA
$24.57
0
$0.00
0
$0.00
*195
Modified Curb, Type D (2011 price adj.)
SYS
$1.37
0
$0.00
10.5
14.39
$14.39
*196
Sidewalk connection, Creekside Middle
School
LSUM
$3,036.00
0
$0.00
1
3,036.00
$3,036.00
*197
Excavation for Base Repair
LSUM
$9,367.60
0
$0.00
1
9,367.60
$9,367.60
`fhri �t`�` t Y. p �9.. '���wy�-- 3 R f y
ttu�t S ER k. f YT,.M..:p..�. v"t fi..d >F` G .:1..
TOTAL OFtCHANORD ITEMS r ,f t d
yG t .YA n..:
i.„:,."s�i
r
v:
;�l4 a 4
".`r
a. Z
y �sy *;'y rx ki
rti 2
a i t y '1 f k.
w:, Y
7.r3r
i f
Y
Y{ 4
i s
1 7 h 5
+a 6:tu r�
M. Ste i .l, P 1 n4e .�:C
Y� 2
284 6.
TOTAL ORIGINAL CONTRACT PLUS CHANGE ORDER ITEMS
ORIGINAL CONTRACT PRICE
CHANGE ORDER #1
CHANGE ORDER #2
CHANGE ORDER #3
CHANGE ORDER #4
CHANGE ORDER #5
CHANGE ORDER #6
NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS
Indicates additional item added to the contract.
$4,622,932.60
$11,435.23
$27,652.43
$7,622.06
$12,502.00
$6,257.68
$68,284.62
$4,756,686.62