HomeMy WebLinkAboutGradex/6/Shelborne 116th to 131st/+$68,284.62TO: Engineering Department One Civic Square Carmel, IN 46032 ITEM See Attached Change Order Table Phone: 317 -780 -1555 Date: 8/19/2011 CITY OF CARMEL CONTRACT CHANGE ORDER NO.: 6 DATE:August 16, 2011 PROJECT NAME: Shelborne Rd. from North of 116th to 126th St. and 131st RAB CITY REQ. NO.: CITY PO NO.: 0513 -10 CITY PO DATE: I. You are directed to make the following changes in this Contract: See Attached Exhibit A 11. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. NO.: N/A Other: The Above Changes Are The Above Changes Are Accepted Recommended CROSSROAD Gradex Inc. ENGINEER CONTRACTOR 3417 Sherman Drive 3685 Priority Way S. Drive Address Address Beech Grove, IN 46107 Indianapolis IN, 46240 City /State /Zip ity /State /Zip SCHEDULED ADJUSTMENT AMOUNT OR DAYS $68,284.62 69 Days The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $4,688,402.00 Contract Price will be increased /decreased by this Change Order $68,284.62 New Contract Price including this Change Order $4,756,686.62 Contract Time prior to this Change Order 214 Days 5/29/2011 Completion Date Net increased /decreased resulting from this Change Order 69 Days Current Contract Time including this Change Order 283 Days 8/17/2011 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. v:Parker Smith Phone: 317 -573 -3970 Date: 8/19/2011 ray, CI -Treasurer ITEM NO. DESCRIPTION UNIT UNIT PRICE ORIGINAL QUANTITY ORIGINAL AMOUNT FINAL QUANTITY FINAL AMOUNT OVER /UNDER *158 Office Equipment (2011 price adj.) MONTH $349.80 0 $0.00 6 2,098.80 $2,098.80 *159 Excavation, Common (2011 price adj.) CYS $0.85 0 $0.00 1221 1,037.85 $1,037.85 *160 Borrow (2011 price adj.) CYC $0.17 0 $0.00 7895 1,342.15 $1,342.15 *161 Revetment, riprap (2011 price adj.) TON $1.71 0 $0.00 10 17.10 $17.10 *162 Geotextiles (2011 price adj.) SYS $0.49 0 $0.00 25 12.25 $12.25 *163 Subgrade treatment, Type 1A (2011 price adj.) SYS $0.03 0 $0.00 8820 264.60 $264.60 *164 Structure Backfill, Type 1 (2011 price adj.) CYS $1.17 0 $0.00 521.98 610.72 $610.72 *165 Compacted Aggregate, NO. 53 Base (2011 price adj.) TON $2.71 0 $0.00 588 1,593.48 $1,593.48 *166 Colored &Jointed concrete, 7" (2011 price adj.) SYS $4.40 0 $0.00 145.75 641.30 $641.30 *167 Colored Jointed concrete, 4" (2011 price adj.) SYS $4.40 0 $0.00 16 70.40 $70.40 *168 HMA Surface, Type C, 9.5mm (2011 price adj.) TON $6.60 0 $0.00 1847.39 12,192.77 $12,192.77 *169 HMA Intermediate, Type C, 19.Omm, (2011 price adj.) TON $4.95 0 $0.00 918.15 4,544.84 $4,544.84 *170 HMA Base, Type C, 25.Omm (2011 price adj.) TON $4.40 0 $0.00 3554.22 15,638.57 $15,638.57 *171 HMA Intermediate, Type C, OG, 19.Omm (2011 price adj.) TON $4.40 0 $0.00 1340.38 5,897.67 $5,897.67 *172 Asphalt for Tack Coat (2011 price adj.) TON $11.00 0 $0.00 29.46 324.06 $324.06 *173 HMA Surface, Type B (2011 price adj.) TON $6.60 0 $0.00 119.64 789.62 $789.62 *174 HMA Intermediate, Type B (2011 price adj.) TON $4.40 0 $0.00 360.74 1,587.26 $1,587.26 *175 Curb ramp, Concrete (all types) (2011 price adj.) SYS $4.40 0 $0.00 137.25 603.90 $603.90 *176 Sidewalk, concrete, reconstruction 4" (undistributed) (2011 price adj.) SYS $2.20 0 $0.00 93.33 205.33 $205.33 *177 Combined Curb Gutter, Type II (2011 price adj.) LFT $0.82 0 $0.00 2557 2,096.74 $2,096.74 *178 Combined Curb Gutter, Type III (2011 price adj.) LFT $0.82 0 $0.00 2682.5 2,199.65 $2,199.65 CITY OF CARMEL Shelborne Road from North of 116th to 126th Street and 131st Roundabout Project #06 -21 CHANGE ORDER TABLE EXHIBIT A *179 Combined Curb Gutter, Roll, Modified (2011 price adj.) LFT $0.82 0 $0.00 350 287.00 $287.00 *180 Straight concrete curb (2011 price adj.) LFT $0.55 0 $0.00 315 173.25 $173.25 *181 PCCP for Approaches, 6" (2011 price adj.) SYS $1.65 0 $0.00 199.95 329.92 $329.92 *182 HMA for Drive approaches (2011 price adj.) TON $6.60 0 $0.00 0 $0.00 *183 Pipe, Type 4, Circular, 6 double wall, smooth interior (2011 price adj.) LFT $0.24 0 $0.00 1588 381.12 $381.12 *184 Pipe, type 2, Circular, 12" (2011 price adj.) LFT $0.65 0 $0.00 558.5 363.03 $363.03 *185 Pipe, type 2, Circular, 15" (2011 price adj.) LFT $0.73 0 $0.00 48 35.04 $35.04 *186 Pipe, type 2, Circular, 24" (2011 price adj.) CYS $1.20 0 $0.00 121.6 145.92 $145.92 *187 Aggregate for underdrain (2011 price adj.) CYS $1.07 0 $0.00 137.6 147.23 $147.23 *188 Geotextiles for underdrain (2011 price adj.) SYS $0.03 0 $0.00 1088.7 32.66 $32.66 *189 Manhole, C -4 (2011 price adj.) EA $21.06 0 $0.00 2 42.12 $42.12 *190 Inlet, J -10 (2011 price adj.) EA $15.21 0 $0.00 0 $0.00 *191 Inlet, K -10 (2011 price adj.) EA $19.89 0 $0.00 1 19.89 $19.89 *192 Manhole, D4 (2011 price adj.) EA $46.80 0 $0.00 0 $0.00 *193 Inlet, B -15 (2011 price adj.) EA $23,40 0 $0.00 6 140.40 $140.40 *194 Inlet, C -15 (2011 price adj.) EA $24.57 0 $0.00 0 $0.00 *195 Modified Curb, Type D (2011 price adj.) SYS $1.37 0 $0.00 10.5 14.39 $14.39 *196 Sidewalk connection, Creekside Middle School LSUM $3,036.00 0 $0.00 1 3,036.00 $3,036.00 *197 Excavation for Base Repair LSUM $9,367.60 0 $0.00 1 9,367.60 $9,367.60 `fhri �t`�` t Y. p �9.. '���wy�-- 3 R f y ttu�t S ER k. f YT,.M..:p..�. v"t fi..d >F` G .:1.. TOTAL OFtCHANORD ITEMS r ,f t d yG t .YA n..: i.„:,."s�i r v: ;�l4 a 4 ".`r a. Z y �sy *;'y rx ki rti 2 a i t y '1 f k. w:, Y 7.r3r i f Y Y{ 4 i s 1 7 h 5 +a 6:tu r� M. Ste i .l, P 1 n4e .�:C Y� 2 284 6. TOTAL ORIGINAL CONTRACT PLUS CHANGE ORDER ITEMS ORIGINAL CONTRACT PRICE CHANGE ORDER #1 CHANGE ORDER #2 CHANGE ORDER #3 CHANGE ORDER #4 CHANGE ORDER #5 CHANGE ORDER #6 NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS Indicates additional item added to the contract. $4,622,932.60 $11,435.23 $27,652.43 $7,622.06 $12,502.00 $6,257.68 $68,284.62 $4,756,686.62