F&K/2/126th St Towne to Shelborne/+$71,657.68TO: Greg Kuns F K Construction, Inc. 2055 W. 150 S. Flora, IN 46929 I. You are directed to make the following changes in this Contract: See Attached Exhibit A ITEM Contract Items 1 thru 108 Change Order Items 109 thru 112 Total II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order. R.F.P.:_N /A W.D.C. NO.: N/A Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $2,393,658.00 Contract Price will be increased/decreased by this Change Order $71,657.68 New Contract Price including this Change Order $2,465,315.68 Contract Time prior to this Change Order 121 Days 10/12/2010 Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 121 Days 10/12/2010 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended CROSSROAD ENGINEERS ENGINEER 3417 Sherman Drive Address Beech Grove, IN 46107 City/ tate /Zip att McElro Phone: 317-780-1555 Date: 12/14/10 CITY OF CARMEL The Above Changes Are Accepted F K Construction, Inc. CONTRACTOR 2055 W. 150 S. Address Flora, IN 46929 City /State/Zip B CONTRACT CHANGE ORDER NO.: 2 DATE:December 14, 2010 PROJECT NAME: #06-22 126th St. Towne Rd. to Shelbome Rd. CITY REQ. NO.: CITY PO NO.: CITY PO DATE: AMOUNT $58,215.81 $13,441.87 $71,657.68 :Gr Kuns Phone: 765-427-4499 Date: 12/14/10 SCHEDULED ADJUSTMENT +)OR( -)DAYS 0 Days 0 Days 0 Days Approved iana Cordray, Cle Treasurer Date: AF,- OV:. AS TO FORM BY i:•.:•l :r ......f.l ,t l........,.,..... N7�M.Nb� '.r f I .11. '1 {1 1.1.11. :,I.:,I L..t. F. .a•. 1 t 1 F tt ..f�... ...:.t E l'''"!''' D: ESCRIPTIQN ttl:,tl.i,!ls l is �I t .•:.:.•,t:: .,.ali,,:,l. ...t:.:r._ UMW ,UN�T PRICE i::' l I L1 ORIG ..A...i :hlt a UAN.71`�Yi•I .RIGINALs.:.: .,..Q „ttAMduNT lii il: •FIMI1 i s „it!.I .t „QUANTi7Y t A L I N t 1 ;'ALVIQIJf��' t I ..f. UN OVER/DE 1 Construction Engineering $33,500.00 1 $33,500.00 1 $33,500.00 $0.00 2 Field Office $2,200.00 5 $11,000.00 6 $13,200.00 $2,200.00 3 Mobilization and Demobilization $45,000.00 1 $45,000.00 1 $45,000.00 $0.00 4 Clearing Right of Way $7,300.00 1 $7,300.00 1 $7,300.00 $0.00 5 Excavation, Common $9.00 9397 $84,573.00 9397 $84,573.00 $0.00 6 Borrow 513.60 1755 $23,868.00 1755 $23,868.00 $0.00 7 Structure Backfill $22.00 6994 $153,868.00 5861.52 $128,953.44 ($24,914.56) $8,860.05 8 Riprap, Revelment $27.00 74 $1,998.00 402.15 $10,858.05 9 Geotextile $2.00 127 $254.00 275 $550.00 $296.00 10 Temporary Ditch Inlet Protection $78.00 12 $936.00 12 $936.00 50.00 11 Temporary Curb Inlet Protection $78,00 12 $936.00 12 $936.00 $0.00 12 Temporary Silt Fence $1.60 7845 $12,552.00 6059 $9,694.40 ($2,857.60) ($4,433.36) ($4,519.46) (5600.00) ($1,646.75) 13 Subgrade Treatment, Type I $4.00 23042 $92,168.00 21933.66 $87,734.64 14 Compacted Aggregate, 53 $22.00 2357 $51,854.00 2151.57 $47,334.54 $0.00 15 Comp. Agg., 2, Temp. for Diversion Berm $50.00 12 $600.00 0 16 Comp. Agg., 53, Temp. for Driveways $25.00 150 $3,750.00 84.13 $2,103.25 17 HMA Surface, Type C $75.00 2014 $151,050.00 2350.89 $176,316.75 $25,266.75 18 HMA Intermediate, Type C $53.00 3984 $211,152.00 3944.81 5209,074.93 ($2,077.07) $40,770.08 19 HMA Base, Type C $52.00 6067 $315,484.00 6851.04 $356,254.08 20 HMA Intermediate, Type C, OG 19 mm $52.00 3054 $158,808.00 2739.7 $142,464.40 ($16,343.60) 21 HMA for Patching $128.00 15 $1,920.00 5 $640.00 ($1,280.00) 22 HMA for Approaches $87.00 270 $23,490.00 325.28 $28,299.36 54,809.36 23 Asphalt for Tack Coat $450.00 22 $9,900.00 5.55 $2,497.50 ($7,402.50) $18.01 24 Surface Milling $1.00 3969 $3,969.00 3987.01 $3,987.01 25 Combined Curb and Gutter, Type II $12.00 6541 $102,492.00 8939.1 $107,269.20 $4,777.20 26 Combined Curb and Gutter, Type III $11.00 8676 $95,436.00 8693 $95,623.00. $187.00 27 Combined Depressed Curb and Gutter $12.00 407 $4,884.00 377 $4,524.00 (5360.00) 28 Concrete Curb End Treatment $90.00 19 51,710.00 6.8 $612.00 ($1,098.00) $9,215.04 29 Curb Ramp, Concrete, Type "G! $87.00 97 58,439.00 202.92 $17,654.04 30 PCCP, Decorative, 4" $74.00 172 $12,728.00 169.94 $12,575.56 ($152.44) 31 Mailbox Assembly, Single $210.00 6 $1,260.00 6 $1,260.00 $0.00 32 Cement Conc. Pavement for Commercial Drive, 8 IN, $43.00 415 $17,845.00 415.78 $17,876.54 $33.54 33 Cement Conc. Pavement for Residential Drive, 6 IN. $40.00 155 $6,200.00 123.9 $4,956.00 ($1,244.00) 34 Topsoil $9.00 1309 $11,781.00 1309 $11,781.00 50.00 35 Sodding $2.50 15744 $39,360.00 17944 $44,860.00 $5,500.00 36 Culvert, Precast Box, Reinforced Conc., 9 FT x 9 FT $600.00 80 $48,000.00 80 $48,000.00 $0.00 37 Structure Backfill for Box Culvert $22.00 411 $9,042.00 0 $0.00 ($9,042.00) 50.00 38 Compacted Aggregate, 53, for Box Culvert $11.00 80 $880.00 80 $880.00 CITY OF CARMEL 126th Street Towne Road to Shelborne Road Project #06 22 CHANGE ORDER TABLE 39 Wingwall, Reinforced Concrete $40.00 1240 $49,600.00 1240 $49,600.00 $0.00 40 Headwall, Reinforced Concrete $47.00 126 $5,922.00 126 $5,922.00 $0.00 41 Handrail $160.00 104 $16,640.00 104 $16,640.00 $0.00 42 Cap Pipe $965.00 1 $965.00 1 $965.00 $0.00 43 Core Hole in Concrete Pipe $425.00 2 $850.00 2 $850.00 $0.00 44 Pipe, Underdrain, Double Wall, Circular, 6 IN. $5.00 8831 $44,155.00 8092 $40,460.00 ($3,695.00) ($3,720.25) ($143.00) ($312.00) $105.00 45 Pipe, RCP, Circular, 12 IN. $23.00 1389 $31,947.00 1227.25 $28,226.75 46 Pipe, RCP, Circular, 15 IN. $26.00 194 $5,044.00 188.5 $4,901.00 47 Pipe, RCP, Circular, 18 IN. $26.00 147 $3,822.00 135 $3,510.00 48 Pipe, RCP, Circular, 21 IN. $35.00 1071 $37,485.00 1074 $37,590.00 49 Pipe, RCP, Circular, 24 IN. $41.00 36 $1,476.00 28 $1,148.00 $280.00 ($328.00) (81,000.00) ($2,340.00) $24,814.50 50 Pipe, RCP, Circular, 30 IN. $80.00 16 $1,280.00 3.5 51 Pipe, RCP, Circular, 36 IN. $60.00 972 $58,320.00 933 $55,980.00 52 Pipe, RCP, Circular, 42 IN. $71.00 201 $14,271.00 550.5 $39,085.50 53 Pipe, Concrete, 10 IN. $24.00 40 $960.00 0 $0.00 ($960.00) 54 Pipe, PVC, 8 IN. $29.00 21 $609.00 65 $1,885.00 $1,276.00 55 8" PVC Tee Connector with Open Grate $300.00 1 $300.00 3 $900.00 $600.00 56 21" RCP End Section $950.00 1 $950.00 2 $1,900.00 $950.00 57 42" RCP End Section $1,550.00 1 $1,550.00 0 $0.00 ($1,550.00) ($1,673.28) $0.00 58 Aggregate for Underdrains $24.00 798 $19,152.00 728.28 $17,478.72 59 Inlet, J10 $1,300.00 22 $28,600.00 22 $28,600.00 60 Inlet, M10 $1,390.00 4 85,560.00 4 $5,560.00 $0,00 61 Inlet, E7 $1,160.00 2 $2,320.00 3 $3,480.00 $1,160.00 62 Manhole, D2 $3,620.00 1 $3,620.00 1.47 $5,321.40 $1,701.40 63 Manhole, D4 $3,000.00 11 $33,000.00 11 $33,000.00 $0.00 64 Manhole, D4, Modified $3,300.00 1 $3,300.00 1 $3,300.00 $0.00 65 Manhole, C2 $3,000.00 1 $3,000.00 1 $3,000.00 $0.00 66 Manhole, C4 $3,100.00 12 $37,200.00 12 $37,200.00 $0.00 67 Hooded Catch Basin, K10 $1,880.00 23 $43,240.00 22 $41,360.00 ($1,880.00) $0.00 68 Aquaswirl, AS-4 or Equal $17,000.00 1 $17,000.00 1 $17,000.00 69 Casting, Type 4, Furnish Adjust to Grade $500.00 1 $500.00 1 $500.00 $0.00 70 Casting, Type 2, Furnish Adjust to Grade $780.00 1 $780.00 1 $780.00 $0.00 71 Casting, Adjust to Grade $270.00 7 $1,890.00 7 $1,890.00 $0.00 72 Water Valve Box, Adjust to Grade $190.00 14 $2,660.00 11 $2,090.00 ($570.00) $0.00 73 Curb Stop, Adjust to Grade $185.00 4 $740.00 4 $740.00 74 Hydrant, Relocate and Adjust to Grade $860.00 4 $3,440.00 1 $860.00 ($2,580.00) $0.00 75 Hydrant, Adjust to Grade $460.00 3 $1,380.00 3 $1,380.00 76 Maintaining Traffic $8,100.00 1 $8,100.00 1 $8,100.00 $0.00 77 Barricade, III -B $13.00 240 $3,120.00 200 $2,600.00 ($520.00) $0.00 78 Construction Sign, A $200.00 8 $1,600.00 8 $1,600.00 79 Construction Sign, B $55.00 8 $440.00 8 $440.00 $0.00 80 Road Closure Sign Assembly $385.00 10 $3,850.00 10 $3,850.00 $0.00 81 Detour Route Marker Assembly $145.00 12 $1,740.00 12 $1,740.00 $0.00 82 Sign, Sheet, Encapsulated Lens with Legend, 0.080 IN. $17.00 35 $595.00 20 $340.00 ($255.00) $0.00 83 Sign, Sheet, Encapsulated Lens with Legend, 0.100 IN. $18.00 6 $108.00 6 $108.00 84 Ornamental Sign Assembly, Complete $2,125.00 5 $10,625.00 5 $10,625.00 $0.00 85 Sign Post, Square, 1, Reinforced Anchor Base $15.00 89 $1,335.00 51.15 $767.25 ($567.75) 86 School Flasher Assembly, Relocate $2,400.00 1 $2,400.00 1 $2,400.00 $0.00 87 Sign Relocation $250.00 5 $1,250.00 4 $1,000.00 ($250.00) 88 Sign and Post to be Removed $250.00 8 $2,000.00 8 $2,000.00 $0.00 89 Transverse Marking, Thermoplastic, Crosswalk, 6" $1.75 908 $1,589.00 903 $1,580.25, ($8.75) 90 Transverse Marking, Thermoplastic, Stop Line, 24" $7.00 113 $791.00 126 $882.00 $91.00 91 Snowplowable Raised Pavement Markers (Yellow) $55.00 14 $770.00 12 $660.00 ($110.00) $0.00 92 Snowplowable Raised Pavement Markers (Blue) $55,00 10 $550.00 10 $550.00 93 Pavement Message Markings, Thermo., Lane Indication Arrow $120.00 6 $720.00 9 $1,080.00 $360.00 94 Pavement Message Markings, Thermo., Word (ONLY) $135.00 6 $810.00 7 $945.00 $135.00 95 Line, Thermoplastic, Solid, Yellow, 4 IN. $1.00 1000 $1,000.00 46 $46.00 ($954.00) $95.00 96 Line, Thermoplastic, Solid, White, 4 IN. $1.00 700. $700.00 795 $795.00 97 Planting Soil $21.00 328 $6,888.00 370 $7,770.00 $882.00 98 Mulch, Hardwood Shredded Bark $80.00 55 $4,400.00 64.65 $5,172.00 $772.00 99 Plant, Deciduous Tree, 2.0" Cal. $300.00 147 $44,100.00 130 $39,000.00 ($5,100.00) 100 Plant, Deciduous Tree, 2.5" Cal. $300.00 94 $28,200.00 94 $28,200.00 $0.00 101 Plant, Deciduous Shrub, 3 Gal. 15 -18" $47.00 154 $7,238.00 140 $6,580.00 ($658.00) ($924.00) ($660.00) ($24.00) 102 Plant, Deciduous Shrub, 3 Gal. 24 -30" $77.00 100 $7,700.00 88 $6,776.00 103 Plant, Ornamental Grass, 2 Gal. $20.00 363 $7,260.00 330 $6,600.00 104 Spade Edge $1.00 264 $264.00 240 $240.00 *105 Recycled Roadway Material, No. 53 Stone $15.00 0 $0.00 1625.85 $24,387.75 $24,387.75 *106 Electrical Pump Repair $1,276.00 0 $0.00 1 $1,276.00 $1,276.00 *107 Structure 226 Reconstruct $1,181.50 0 $0.00 1 $1,181.50 $1,181.50 *108 Curb Removal $15.00 0 $0.00 350 $5,250.00 $5,250.00 *109 Added Left Turn Lane Design $1,128.60 0 $0.00 1 $1,128.60 $1,128.60 $3,984.29 *110 Containerized Plant Materials $3,984.29 0 $0.00 1 $3,984.29 *111 Sidewalk, Concrete, 4" $57.00 0 $0.00 54.04 $3,080.28 $3,080.28 *112 Bypass Pump $5,248.70 0 $0.00 1 $5,248.70 $5,248.70 I ['t) [:'1[c d) "k t:#, t, a.. ..,l�r.�.�.',`r�^:�.��.^,fi:vl: fy ii;, C I) 6 a 1 {..F ,t Ji.T'S •.l t.. �i ::,a.,_,.._,...�:t r t t F4 i. It,.ura.,t I ,.t_t. i[_' Vi i. `:i`:[: j ..,F:: +:t:n�1�!r,�,t:: +l.:rF t t .ti.i..;i d =:1�� 4. I t�'. fi'u'1-+ `hF f 1. �1 FI `i TM. a }i F eJ. W.._: F r ��i.F...:�: jit't rtitT 't' ti1ib +1 t 5i. ��S i J J k 1�� O y '7 6 TOTAL ORIGINAL CONTRACT PLUS CHANGE ORDER ITEMS ORIGINAL CONTRACT PRICE CONTRACT ITEMS COMPLETED including Change Order Items (ITEMS 1 THRU ITEMS 108) CHANGE ORDER ITEMS COMPLETED (ITEMS 109 THRU ITEMS 112) CHANGE ORDER NO. 1 NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS AMOUNT OVER/UNDER THE ORIGINAL CONTRACT AMOUNT lndicatcs additional itcm addcd to the contract. $2,465,315.68 $2,393,658.00 $2,451,873.81 $13,441.87 $10,785.65 $2,465,315.68 $71,657.68