HomeMy WebLinkAboutThieneman Construction/2/106th Pump Station/-$5,502.71Approved By
Jones Henry Engineers, Ltd.
Name of Project 1:- leadworks 106 °i Street Pump Station, Contract 70 Number 451 5996.002 Page 1 of 3
Change Order No.
Contractor Thieneman Construction, Inc.
Bid Amount
Net Change through Change Order 2
Present Contract Amount
Change in Time of Completion
CHANGE ORDER
City of Carmel, Indiana; WWTP Expansion, Project
Address 17110 Westfield Park Road, Suite IA; Westfield, Indiana 46074
Description of Change
Item 1 Provide Three Plug Valves
Item 2 Deduction for Crane Revisions
Item 3 Deduction for Wall Painting
Item 4 Revisions to Exhaust Fan No. 5
Item 5 PLC Panel Changes
Item 6 Modify the Grit Pumps
Item 7 Deduct for the Supernatent Pump Control Panel
Item 8 Deduct the Epoxy Floor Coating
Item 9 Light Pole Bases
3,028.00
3,432.00
5,100.00
8,056.00
No Cost
10,594.70
5,000.00
15,000.00
1,350.59
April 13, 2011
5,454,500.00
335,142.97
5,119,357.03
Prepared By: Jones Henry Engineers, Ltd. By
Engineer
Accepted Thieneman Construction, Inc. By
Contractor
Approved City of Carmel, Indiana By
Owner
to
All claims against OWNER, which are incidental to or a consequence of its Chang Order .re satis
Total Decrease
0 -not �/lei„Ce/it`
Date
April 15, 2011
APPRov:3 AS TO FORM BY
C C J
Date
Date
Date
November 22, 2010
5,502.71
I/ 1/2e f°
2
Item 1 Provide Three Plug Valves
City of Carmel, Indiana
Wastewater Treatment Plant Expansion
Headworks and 106 Street Pump Station
Contract 70
451 5996.002
Change Order No. 2
The Contract Drawings indicated the Owner would supply three plug valves. The
Owner requested the Contractor to supply. A one day time extension was included for
this work.
During the course of the project, it was determined that there was not a need to
electrify the overhead hoist and trolley, primarily due to its low expected use. The unit
was replaced with a hand geared unit.
Item 4 Revisions to Exhaust Fan No. 5
Exhaust Fan No. 5 required a size increase from 9,000 cfm at 2- inches water column to
9,600 cfm at 5- inches water column. This increase created a motor increase from 7.5
Hp to 15 Hp, a starter change, fan size change, and roof curb modifications. The
modification was chiefly for an increased pressure drop for the grease eliminators to
account for additional pressure drop when they become dirty.
Jones K Henry Engineers, Ltd.
Page 2 of 3
3,028.00
Item 2 Deduction for Crane Revisions 3,432.00
Item 3 Deduction for the Wall Painting 5,100.00
The Owner determined that they did not want the lower level interior concrete walls to
be finish painted.
8,056.00
Item 5 PLC Panel Changes No Cost
The Owner requested some minor panel revisions to match their existing panel designs.
Item 6 Modify the Grit Pumps 10,594.70
During the submittal phase, the supplier offered a change to include variable frequency
drives for the three grit pumps. The drives will provide added flexibility and may
improve the grit dewatering. The Owner approved the change to revise the pumps,
include different pump seals, and add the variable frequency drives for each pump into
the MCC.
Item 7 Deduct for the New Supernatent Pump Control Panel 5,000.00
It was determined that the existing pump controls and starter would be acceptable to
operate the new pump.
Item 8 Deduct the Epoxy Floor Coating
The Owner elected not to have the building floors epoxy coated.
Item 9 Light Pole Bases
The excavation of the light pole bases required additional removal of the concrete
rubble. A one day time extension was granted for this change.
Jones Henry Engineers, Ltd.
City of Carmel, Indiana
Wastewater Treatment Plant Expansion
Headworks and 106 Street Pump Station
Contract 70
451 5996.002
Change Order No. 2
Page 3 of 3
15,000.00
S 1,350.59
September 29, 2010
Mr. Dan Miller, P.E.
Jones Henry Engineers, Ltd.
2000 West Central Avenue
Toledo, OH 43606 -3996
RE: Carmel WWTP Contract 70
PCO 18 New plug valves at grit pumps
ICI Project No.: 0913
J&H Project No.: 451 5996.001
Dear Dan:
The total additive cost supply these plug valves is:
Respectfully,
THIENEMAN CONSTRUCTION, INC.
Jaohuca .Mafotie
Joshua D. Morris, P.E.
Project Engineer
CC: PCO File
THIENA_N
CONSTRUCTION, INC.
Per your request we have revised our pricing proposal for the additional plug valves requested
at the grit pumps. We are providing pricing on two plugs valves with a chain wheel operator,
and one plug valve with a standard quarter turn with a handle.
Add $3,028.00
Add Three Thousand Twenty Eight Dollars
Attached is our detailed pricing breakdown of the costs associated with this work. We are also
requesting a time extension of one (1) calendar day be added to the Contract to account for this
work.
If you have any questions or need any additional information, please feel free to contact either
Brian Coryell or myself.
DESCRIPTION QUAN. UNIT
LABOR EQUIP
UNITS TOTAL
MATERIAL
UNITS TOTAL
SUB TOTAL
Grit Pump Valves
Material
6" Plug valve with chainwheel operator 2 ea
$910.00
$1,820.00
$1,820.00
6" Plug valve with quarter turn handle I ea
$577.40
$577.40
$577.40
shipping 1 Is
$150.00
$150.00
$150.00
Contract Manager hr
$80.00
Project Superintendent hr
$72.00
Project Manager 0.5 hr
$72.00
$36.00
$36.00
Project Engineer 1 hr
$50.00
$50.00
$50.00
Project Coordinator hr
$35.00
NAME:
Carmel WWTP Contract 70
LOCATION:
Carmel, IN
ESTIMATED BY:
JDM
PRICED BY:
JDM
ARCH. OR CONTRACTOR:
Thieneman Construction, Inc. and Jones Henry Engineers
TYPE OF WORK: FLANGED PIPE
Description: Add three plug valves at grit pumps
EXTENDED BY: CHECKED BY:
JDM BKC
DESCRIPTION QUAN. UNIT
DEDUCTIONS
Subtotal=
Page l of l
$86.00
LABOR EQUIP
UNITS TOTAL
Subtotal=
$2,547.40
MATERIAL
UNITS TOTAL
CHANGE ORDER REQUEST $3,028
ADDITIONAL CONTRACT TIME: 1 Day
DATE:
Labor 5.00%
Material 5.00%
Subs 5.00%
Subtotal
TOTAL DEDUCTS
NET CHANGE
PROPOSED C.O.
018
11/2/2010
$2,633.40
$12.90
Labor 15.00%
Material 15.00% $382.11
Subs 5.00%
Subtotal $3,028.41
Bond
TOTAL ADDS $3,028.41
SUB TOTAL
$3,028.41
Josh Morris
From: Joshua Boyko 1934 INDYWW [joshua.boyko @ferguson:coml
Sent: Tuesday, September 21, 2010 10:28 AM
To: Josh Morris
Subject: Email Bid# B111219
Bid No B111219
Bid Date...: 09/1711.0'
Quoted By: JB
Customer.: THIENEMAN CONSTRUCTION INC
CARMEL WWTP
3313 EAST 83RD PLACE
MERRILLVILLE. IN 46410
Cust- Pn.
Item
GNGK
FNW4I OG
TA'PBFPG
D I'18FU
Description
DI18FV
1X2 GALV STL NIP
1 BRS 60ON WOG 2PC THRD FP BV
DOM 4.DI 1254 C110 FLG TEE
4X1 DI 125 CI 10 TAP BLIND FLG
6-8 WEEK. LEAD TIME
WHEEL AND 15' CHAIN FLGED
EN DS
Price Quotation B111219
FE!- Indianapolis, IN -WW #1934
6439 EAST 30TH STREET
INDIANAPOLIS, IN 46219-0000
Phone 317- 546 -2013
Fax 317-546-2318
PSNBGZ I RF8P 4 ZN 1504 RR FE 1/8 FLO PKG
6 CI FLG N /LURE PLUG VLV
6 PRATT PLUG VALVE WITH CHAIN
6?CI• FIG NILUBE -PLUG VLV
6" PRATT PLUG VALVE WITH LEVER
•FLANGED ENDS
VALVE PRICING HAS ,w
CHANGED DUE TO QUANTITY
THERE WILL ALSO BE FREIGHT 3 tS"
ADDED TO THETICKET
Cust Phone: 31,7- 867 -3462
Terms NET 10TH PROX
Ship To •THIENEMAN CONSTRUCTION INC
CARMEL WWTP
3313 EAST 83RD PLACE
MERRILLVILLE, IN 46410
Job Name.: CARMEL WWTP
uantity
Net Price
LIM
Total
2.000 EA
20:000 EA
146.570 E EA.
85.000 EA
12:600 EA
910:000 EA
577.400 EA
Net Total:
Tax:
Total:
3864.94
0.00
3864.94
4:00
40'.00
293.14
1 70.00
50 40
2730:00
577.40
September 23, 2010
Dear Mr. Morris:
Please resubmit.
Sincerely,
S 8i} HE
Giu
Daniel W. iller, '.E.
Director of Wastewater
DWM /kcm
Jones Henry Engineers, Ltd.
2000 WEST CENTRAL AVENUE, TOLEDO, OHIO 43606 419/473 -9611
www.jheng.com FAX 419/473 -8924
Mr. Joshua Morris
Thieneman Construction, Inc.
17110 Westfield Park Road, Suite lA
Westfield, Indiana 46074
Subject: City of Carmel, Indiana
Wastewater Treatment Plant Expansion
Headworks and 106 Street Pump Station
Contract 70
PCO #16
New Plug Valves and Fittings
451-5996.001
We are in receipt of your September 21, 2010 letter detailing the additional costs for plug valves and
fittings.
Please make the following revisions:
Delete one of the 6 -inch plug valves with chain wheels. As you may recall, we deleted the valve
leading up to the cyclone on the south side.
Why are there handling costs? Even if the City supplied, handling would still be required. Delete
these costs.
Please delete the added flanged tee, blind flanged galvanized nipple, and ball valve. We added
these with the idea there would not be additional costs.
Delete the labor, since the added tee and accessories are deleted.
Delete the costs for Project Superintendent, Manager, and Engineer since the valves required
installation under the Contract.
c: Construction Services
CONSULTING ENGINEERS
HANDLING
ST. LOUIS MISSOURI
Overhead Crane Hoist Specialists Since 1961
Phone: 314 842 -7263 11678 Gravois Road, St. Louis, Missouri 63126
ENGINEERING SALES
Mr. Brian Coryell
Thieneman Construction, Inc.
17110 Westfield Park Road
Suite 1A
Westfield, IN 46074
Subject: Carmel VWVTP Expansion- Contract 70
Thieneman Construction Purchase Order: 913P0010
Mr. Coryell,
Per our discussion, please see below for the deduct to remove the ACCO hoist with geared trolley
and overhead crane electrical accessories from the original order. Please advise if you would like to
proceed with the changes noted below:
Hoist w /Geared Trolley Crane Electrical Accessories Deduct
Mark Oberkfell
Respectfully Submitted,
for harm uearea tjatenmed`" !rack ton I rolley w/ 1evl9
Coffing Model: CTA -60G
3 Ton Capacity
9' Hand Chain Drop
SYSTEMS
April 30, 2010
($4,464.00)
The above quoted hand geared trolley does not include spark resistant features.
If you have any questions regarding the information requested please let me know.
(c/4 -o
Fax: 314 842 -5041
INSTALLATION 24 HOUR SERVICE
July 14, 2010
Mr. Dan Miller, P.E.
Jones Henry Engineers, Ltd.
2000 West Central Avenue
Toledo, OH 43606 -3996
RE: Carmel WWTP Contract 70
PCO 8 Painting Credits
TCI Project No.: 0913
J&H Project No.: 451- 5996.001
Dear Dan:
Per your email on July 7, 2010 we are submitting separate pricing for deleting portions of the
painting work on the interior of the new Grit/Screen Building. All proposed painting work to be
deleted is on the lower level. The painting work on the second level and the floor coating
remains.
The deductive cost for the work associated with deleting the walls and ceiling painting work is:
These are separate prices for each separate portion of work. If the Owner wishes to delete both
the painting of the walls and the ceiling they would realize a credit of $8,550.
If you have any questions or need any additional information, please contact myself at (317)
401 -6139.
Respectfully,
THIENEMAN CONSTRUCTION, INC.
Joo uza .Maetio
Joshua D. Morris, P.E.
Project Engineer
CC: PCO File
'HIEN
CONSTRUCTION, INC.
Option A Delete the painting of the interior lower level walls
Deduct $5,100.00 ✓n
Deduct Five Thousand One Hundred Dollars
Option B Delete the painting of the ceiling of the lower level
Deduct $3,450
Deduct Three Thousand Four Hundred Fifty Dollars
April 16, 2010
Dear Mr. Coryell:
Daniel Miller, P.E.
Project anager
DWM /rmb
Jones Henry Engineers, Ltd.
2000 WEST CENTRAL AVENUE, TOLEDO, OHIO 43606 419/473 -9611
www.jheng:com FAX 419/473 -8924
Mr. Brian Coryell
Theineman Construction, Inc.
17110 Westfield Park Road, Suite lA
Westfield, Indiana 46074
Subject: City of Carmel, Indiana
Wastewater Treatment Plant Expansion
Headworks and 106 Street Pump Station
Contract 70
Exhaust Fan No. 5
451- 5996.001
Please review and submit a detailed quotation for the larger fan.
If you have any questions, please call.
Sincerel
c: Mr. Edward Wolfe
ID.
CONSULTING ENGINEERS
Exhaust Fan No. 5 (EF -5) requires modification.
The specifications required a design point of 9,000 cfm at 2 -inch water column, which must be modified
to 9,600 cfm at 5-inch water column.
The submitted supplier of exhaust fan EF -5 was Hartzell and they recommend a Model A40 -9 -27 with a
15 Hp motor. This increases the motor size from 7.5 Hp to 15 Hp, which will require a Size 2 starter at
the MCC in lieu of the Size 1 shown on the Drawings, a 4 KVAR capacitor in lieu of a 3, and a 50 amp
breaker in lieu of a 30 amp in MCC -HW, and an increase in feed wire size from 3 #12, 1 #12 Grd to 3 #10,
and 1#10 Grd.
Please note the revised fan will require a longer roof curb and back draft damper. A larger reducer will
also be required on the discharge side of the fan. The fan manufacturer needs to allow for any pressure
losses for these accessories in addition to the 5.0 water column of external losses.
DESCRIPTION QUAN. UNIT
LABOR EQUIP
UNITS TOTAL
MATERIAL
UNITS TOTAL
SUB TOTAL
Subcontractor
New Fan 1 Ea
$6,258.00
$6.258.00
Reinforcing Steel 0.3 ton
$129.62
$38.89
$555.00
$166.50
$150.00
$355.39
Concrete 1 cy
$28.50
$28.50
$74.00
$74.00
$102.50
Formwork Material 39 sf
$6.55
$255.45
$3.00
$117.00
$372.45
waterstop 20 If
$3.00
$60.00
$2.00
$40.00
$100.00
rubbed finish 39 sf
$3.50
$136.50
$0.50
$19.50
$156.00
Contract Manager hr
$80.00
Project Superintendent hr
$72.00
Project Manager 1.5 hr
$72.00
$108.00
$108.00
Project Engineer 1.5 hr
$50.00
$75.00
$75.00
Project Coordinator 1 hr
$35.00
$35.00
$35.00
NAME:
Carmel WWTP Contract 70
LOCATION:
Carmel, IN
ESTIMATED BY:
DESCRIPTION
DEDUCTIONS
BKC
PRICED BY
BKC
QUAN. UNIT
ARCH. OR CONTRACTOR:
Thieneman Construction, Inc. and Jones Henry Engineers
TYPE OF WORK: PIPE
Modifications to EF -5
EXTENDED BY:
BKC
Subtotal=
subtract equipment=
without equipment=
Page I of I
$737.34
$737.34
Subtotal=
CHECKED BY:
BKC
$417.00
SUB
$6,408.00
TOTAL ADDS
Labor 15.00% $110.60
Material 15.00% $62.55
Subs 5.00% $320.40
Subtotal $8,055.89
Bond
LABOR EQUIP
UNITS TOTAL
MATERIAL
UNITS TOTAL
Labor 5.00%
Material 5.00%
Subs 5.00%
Subtotal
TOTAL DEDUCTS
NET CHANGE
CHANGE ORDER REQUEST $8,056
ADDITIONAL CONTRACT TIME: 2 Days
DATE:
PROPOSED C.O.
10
8/4/2010
$7,562.34
$8,055.89
TOTAL
$8,055.89
November 2, 2010
Mr. Dan Miller
Jones and Henry Engineers, Ltd
2000 West Central Avenue
Toledo, OH 43606 -3996
RE: City of Carmel Contract 70
PCOs for Change Order
Dear Dan:
Thieneman Construction has been asked to price up additional items as part of a change order
to the contract. Below is a list of the items with pricing:
The removal of the epoxy floor coating from the contract Deduct $15,000
The removal of the supernatant pump control panel Deduct 5,000
Attached letter of changes on the l &C No cost change
Please forward a change order encompassing all the outstanding PCOs for the project
previously discussed and agreed upon.
If you have any questions or need any additional 'information, please contact me at (317) 867
3462.
Respectfully,
THIENEMAN CONSTRUCTION, INC.
Brian Coryell
Project Manager
CC: Josh Morris
File
1 4 d fl s 7 e B
T 'EN AN
CONSTRUCTION, INC.
July 1 2010
City of Carmel
WWTP Improvements
TO: "Thienaman Construction
AUTOMATION
10226 Pamona Ct.
Fishers, Indiana 46038
The following notes and pricing. go with the re- submittal:
Section l: LEVEL METERS
As discussed, I have submitted ultrasonic level transmitters that use a remote unit for
4-20 mA output and level indication. This also eliminates the loop powered aspects of
those that.were specified. We have submitted Endress and Hauser for cost savings and
because the one used for flow has an integral flow calculator. ADDITIONAL COST:
$1000
Section 4: TEMPERATURE EQUIPMENT
Put in correct part number with selected RTD per information provided by Isreal. NO
ADDITIONAL COST
Section 5: PLC. equipment
Downgraded PLC from 1756-L63 to 1756 -L61 per customer's request. CREDIT of
$7000 total...$3500 each on one installed and one spare.
Change Digital Input cards from 175 6 -IB -161, to. 1756 -IB16 per customer's request.
CREDIT of $300 total...$75 each on three installed and one spare.
Change Digital Output card from 1756-0A161 to 1756-0W161 per customer's request to
eliminate AC voltage. CREDIT of $200 total...$100 each on one installed and one
spare.
Change Analog Input card from 1756 -IF16 to 1756 -IH8H per customer's request.
CREDIT of $500 totaI...$250 each on one installed and one spare.
Add an Analog Input card to provide spares. A Supernatant signal was added in the
meeting and thus another card is required. ADDITIONAL COST: $1000
Section 9: ADD Fiber equipment Section
Provide submittal information for required Fiber Box. We were required to provide an
Ethernet switch, but it was not specified to be managed. Isreal gave me the exact part
number the is required, and it is managed so there is an additional cost ADDITIONAL
COST: $1000
Phone 317- 418 -9561 Fax 317 -913 -9998 Page 1 of 2
AUTOMATION
10226 Pamona Ct.
Fishers, Indiana 46038
Section 10: ADD Operator Interface Section
Provide submittal infomiation for new Panelview Plus. Isreal gave me the exact part
number "the sis required. ADDITIONAL COST: $5000
Section 11: DRAWINGS
#1 Added requested fuse style blocks for power isolation. Corrected missing parts and
legend numbers: Updated PLC part numbers.:: Added Fiber equipment Added additional
wiring duct and moved power section to the top per customer's request.
#2 Updated power circuit and added fuse, blocks per customer's request.
#3 Updated wiring' with new card and number system, per customer's request
#4 Updated wiring with new card and number system per customer's request.
#5 Updated wiring with new card and number system per customer's request.
#6 Updated wiring with new card and number system per customer's request.
#7- Updated wiring with new; card and .nuntber system per customer's request.
#8- Added AI card .due 'to new signal per customer's request.
#9- Updated wiring and number system per customer's request.
Total of additional Charges: $8000, Total of Credits: $8000 >Net: $0
Please call me at 317 -418 -9561 if you have questions. Thank you very much!
Sincerely,
Sean Boland
Maxim Automation, Inc.
Phone =317- -418 -9561
Fax 317- -913 -9998 Page 2 of 2
DESCRIPTION QUAN. UNIT
LABOR EQUIP
UNITS TOTAL
MATERIAL
UNITS TOTAL
SUB TOTAL
Revised Pump Price 1 EA
$61,835.00
$61,835.00
$61,835.00
Electrical Cost for VFD 1 EA
$9,344.00
$9,344.00
$9,344.00
Seals for Pumps 1 Ea
$7,000.00
$7,000.00
$7,000.00
Contract Manager hr
$80.00
Project Superintendent hr
$72.00
Project Manager 1 hr
$72.00
$72.00
$72.00
Project Engineer 2 hr
$50.00
$100.00
$100.00
Project Coordinator hr
$35.00
NAME:
Carmel WWTP Contract 70
LOCATION:
Carmel, IN
ESTIMATED BY:
DESCRIPTION
DEDUCTIONS
Pump Price at Bid Time
BKC
PRICED BY:
BKC
QUAN. UNIT
-1 Ea
ARCH. OR CONTRACTOR:
Thieneman Construction, Inc. and CSI Consultants
TYPE OF WORK:
Description: Change from 6" to 4" Pumps w/ VFD
EXTENDED BY: CHECKED BY:
BKC
Subtotal=
P a v i a
$172.00
Subtotal= $78,179.00
$72,000.00 ($72,000.00)
(572,000.00)
SUB
TOTAL ADDS
CHANGE ORDER REQUEST $10,595
ADDITIONAL CONTRACT TIME: 0 Days
DATE:
PROPOSED C.O.
2
5/7/2010
78,351.00
$25.80
Labor 15.00%
Material 10.00% $7,817.90
Subs 5.00%
Subtotal $86,194.70
Bond
LABOR EQUIP
UNITS TOTAL
MATERIAL
UNITS TOTAL
NET CHANGE
$86,194.70
TOTAL
($72
($72,000.00)
Labor 5.00%
Material 5.00% ($3,600.00)
Subs 5.00%
Subtotal (875.600.00)
TOTAL DEDUCTS ($75
$10,594.70
JONES HENRY ENGINEERS, LTD.
2000 West Central Avenue
Toledo, Ohio 43606 -3996
Telephone: 419.473.9611
FAX: 419.473.8924
Construction
Bulletin No.: 060
Date: 6/1/10
By: DWM
Contract: Carmel 70 WWTP Expansion Headworks 106 Street PS Project No.: 451 5996.001
Subject: Pumping Equipment Grit Pump Item No.: 11735
To: Thieneman Construction; City of Carmel, Indiana Submittal No.: 039 A
J &H Eng., Ltd. (Office Toledo); J &H Eng. (Carmel Field)
The following Shop Drawings are approved for use under their respective Contract Items in accordance
with the Contract Drawings and Specifications.
Quantity Identification Origin Description
Comb Bound Book
Morris Pumps Grit Pump
Note: Motor must be explosion proof. Must Meet Class I, Division I, Group D Resubmit motor
Information.
I "r ck L S G lJotF_,L cf 0 ,5,e
Svtv t���� "Il T�sa2
Distribution of Attached
4 of each Thieneman Construction Brian Coryell
1 of each City of Carmel, Indiana Edward Wolfe
1 of each Jones Henry Engineers, Ltd.
1 of each
Jones Henry Engineers, Ltd. James Giradot
Authorized By:
Contractor
Owner
Office
Field
Approval in no way relieves the Contractor of any responsibility for capacities, performance, functions, compliance with Federal, State, and Local
Codes; accuracy of dimensions and details; or continuity and completeness of the Project nor does approval constitute or imply any increase in
Contract Price.
EQUIPMENT SUMMARY
MORRIS NON -CLOG CENTRIFUGAL PUMPS
SERIES 6100
Job Name: Cannel WWTP Expansion, Contract 70
Order No:
Quantity: 3
Type: Series 6100 I J
Model: CTS HC 4 X
Design Point: 300 GPM at 30 ft. TDH 4
Suction: 4f(in. Discharge: 4 0 in. Sphere: tin.
Rotation: Left hand
Discharge Position: 0 deg.
Materials: ASTM A532, Class III, Type A, 28% chrome iron, 650 BUN
casing, suction cover, impeller, rear liner.
ASTM A48, Class 35, cast iron seal box, bearing frame.
1141 steel shaft.
450 BHN 420 stainless steel shaft sleeve.
Graphite impregnated polymer packing with Teflon lantern
ring and 316 stainless steel glands.
Oil lubricated bearings.
Accessories: Steel pump baseplate for a)4' pump and motor
mounting. Motor ht.
Steel V -belt guard.
n I I U Fw
Motor: gig HP: RPM:
Frame: 2$ f I NEMA Design Letter: B
Volts: 480 Phase: 3 Hertz: 60
Service Factor: 1.15
Ambient Temp: 40 deg C
Manufacturer: Emerson Motor Co.
Features: F insulation
Cast Iron Construction
Double Shielded Bearings
Enclosure: TEFC /_Eki Duel
Paint: SP -6 surface preparation, one coat Tnemec Hi -Build Epoxoline
II, Series N62F
Spare Parts: -(1)-seto€-belts.-
Special Tool: (1) impeller removal tool.
Testing: oAuT e:
i II 1 1 'J 11 1' 117 i it n I r.
Field Services: Installation inspection and certification.
One day Operation and Maintenance Training
One day additional training as requested by the owner.
(11/22/2010) Dan Miller FW: Carmel WW VFD adder to MCC
Page 1
From: "Brian Coryell" <BrianC @thienemanconstruction.com>
To: "Dan Miller" <DMiller @jheng.com>
Date: 4/22/2010 4:22 PM
Subject: FW: Carmel WW VFD adder to MCC
Dan,
Here is the adder for the VFD's to be put in the MCC. Please remember
that the actual cost will include the contractor's markup.
Thanks,
Brian K. Coryell
Thieneman Construction
17110 Westfield Park Road
Westfield, IN 46072
(317) 867 -3462 Phone
(317) 474 -4636 Cell
(317) 867 -3463 Fax
brianc @thienemanconstruction.com
Original Message---
From: Josh Morris
Sent: Thursday, April 22, 2010 4:10 PM
To: Brian Coryell
Subject: FW: Carmel WW VFD adder to MCC
Joshua D. Morris, P.E.
Thieneman Construction, Inc.
Office: (317) 867 -3462
Fax: (317) 867 -3463
Mobile: (317) 401 -6139
Original Message
From: Sam Berry [mailto:sam @berry- electric.com]
Sent: Thursday, April 22, 2010 4:06 PM
To: Josh Morris
Subject: Carmel WW VFD adder to MCC
Josh,
The adder for the Carmel WW MCC to remove the 3- 30 HP FVNR starteres
and replace them with 3- 20 HP PowerFlex 70 VFD's in Nema 1 encloseures
in the AB MCC is 9,344.00
Let me know, we have the MCC order on hold until we get this VFD change
approved. Thanks
F(11/22/2010) Dan Miller FW WW VFD adder to
Page 2
Sam Berry <sam©berry-electric.com>
Berry Electric Inc.
DESCRIPTION
QUAN. UNIT
LABOR /EQUIP
UNITS TOTAL
MATERIAL
UNITS TOTAL
SUB TOTAL
rental backhoe
1 days
$230.00
$230.00
$230.00
rental hoe -ram for backhoe
1 days
$200.00
$200.00
$200.00
delivery /demob
2 ea
$50.00
$100.00
$100.00
Labor Foreman
'8 hrs
$37.71
$301.68
$301.68
Operator
8 hrs
$48.36
$386.88
,$386.88
Contract Manager
hr
$80.00
Project Superintendent
hr
$72.00
Project Manager
hr
$72.00
Project Engineer
0.5 hr
$50.00
$25.00
$25.00
Project Coordinator
hr
$35.00
(11/11/2010) Dan Miller PCO #23 Concrete at light pole basespdf Page 1
NAME:
Carmel WWTP Contract 70
LOCATION:
Carmel, IN
ESTIMATED BY:
DESCRIPTION
DEDUCTIONS
JDM
PRICED BY:
JDM
QUAN. UNIT
ARCH. OR CONTRACTOR:
Thieneman Construction, Inc. and Jones 8 Henry Engineers
TYPE OF WORK: SITEWURK
Description: Remove old concrete at the location of the light pole bases
EXTENDED BY: CHECKED BY:
JDM BKC
Subtotal=
$1,243.56
Subtotal without equipment $713.56
Subtotal of equipment $530.00
ubtotal=
LABOR /EQUIP
UNITS TOTAL
Fie 1of1
MATERIAL
UNITS TOTAL
9
SUB
Labor 5.00%
Material 5.00%
Subs 5.00%
Subtotal
TOTAL DEDUCTS
NET CHANGE
CHANGE ORDER REQUEST $1,351
ADDITIONAL CONTRACT TIME: 1 Day
DATE:
PROPOSED C.O.
023
11/2/2010
Labor 15.00% $107.03
Material 15.00%
Subs 5.00%
Subtotal $1,350.59
Bond
TOTAL ADDS $1,350.59
TOTAL
$1,35059