HomeMy WebLinkAboutThieneman Construction/2/106th Pump Station/-$5,502.71Approved By Jones Henry Engineers, Ltd. Name of Project 1:- leadworks 106 °i Street Pump Station, Contract 70 Number 451 5996.002 Page 1 of 3 Change Order No. Contractor Thieneman Construction, Inc. Bid Amount Net Change through Change Order 2 Present Contract Amount Change in Time of Completion CHANGE ORDER City of Carmel, Indiana; WWTP Expansion, Project Address 17110 Westfield Park Road, Suite IA; Westfield, Indiana 46074 Description of Change Item 1 Provide Three Plug Valves Item 2 Deduction for Crane Revisions Item 3 Deduction for Wall Painting Item 4 Revisions to Exhaust Fan No. 5 Item 5 PLC Panel Changes Item 6 Modify the Grit Pumps Item 7 Deduct for the Supernatent Pump Control Panel Item 8 Deduct the Epoxy Floor Coating Item 9 Light Pole Bases 3,028.00 3,432.00 5,100.00 8,056.00 No Cost 10,594.70 5,000.00 15,000.00 1,350.59 April 13, 2011 5,454,500.00 335,142.97 5,119,357.03 Prepared By: Jones Henry Engineers, Ltd. By Engineer Accepted Thieneman Construction, Inc. By Contractor Approved City of Carmel, Indiana By Owner to All claims against OWNER, which are incidental to or a consequence of its Chang Order .re satis Total Decrease 0 -not �/lei„Ce/it` Date April 15, 2011 APPRov:3 AS TO FORM BY C C J Date Date Date November 22, 2010 5,502.71 I/ 1/2e f° 2 Item 1 Provide Three Plug Valves City of Carmel, Indiana Wastewater Treatment Plant Expansion Headworks and 106 Street Pump Station Contract 70 451 5996.002 Change Order No. 2 The Contract Drawings indicated the Owner would supply three plug valves. The Owner requested the Contractor to supply. A one day time extension was included for this work. During the course of the project, it was determined that there was not a need to electrify the overhead hoist and trolley, primarily due to its low expected use. The unit was replaced with a hand geared unit. Item 4 Revisions to Exhaust Fan No. 5 Exhaust Fan No. 5 required a size increase from 9,000 cfm at 2- inches water column to 9,600 cfm at 5- inches water column. This increase created a motor increase from 7.5 Hp to 15 Hp, a starter change, fan size change, and roof curb modifications. The modification was chiefly for an increased pressure drop for the grease eliminators to account for additional pressure drop when they become dirty. Jones K Henry Engineers, Ltd. Page 2 of 3 3,028.00 Item 2 Deduction for Crane Revisions 3,432.00 Item 3 Deduction for the Wall Painting 5,100.00 The Owner determined that they did not want the lower level interior concrete walls to be finish painted. 8,056.00 Item 5 PLC Panel Changes No Cost The Owner requested some minor panel revisions to match their existing panel designs. Item 6 Modify the Grit Pumps 10,594.70 During the submittal phase, the supplier offered a change to include variable frequency drives for the three grit pumps. The drives will provide added flexibility and may improve the grit dewatering. The Owner approved the change to revise the pumps, include different pump seals, and add the variable frequency drives for each pump into the MCC. Item 7 Deduct for the New Supernatent Pump Control Panel 5,000.00 It was determined that the existing pump controls and starter would be acceptable to operate the new pump. Item 8 Deduct the Epoxy Floor Coating The Owner elected not to have the building floors epoxy coated. Item 9 Light Pole Bases The excavation of the light pole bases required additional removal of the concrete rubble. A one day time extension was granted for this change. Jones Henry Engineers, Ltd. City of Carmel, Indiana Wastewater Treatment Plant Expansion Headworks and 106 Street Pump Station Contract 70 451 5996.002 Change Order No. 2 Page 3 of 3 15,000.00 S 1,350.59 September 29, 2010 Mr. Dan Miller, P.E. Jones Henry Engineers, Ltd. 2000 West Central Avenue Toledo, OH 43606 -3996 RE: Carmel WWTP Contract 70 PCO 18 New plug valves at grit pumps ICI Project No.: 0913 J&H Project No.: 451 5996.001 Dear Dan: The total additive cost supply these plug valves is: Respectfully, THIENEMAN CONSTRUCTION, INC. Jaohuca .Mafotie Joshua D. Morris, P.E. Project Engineer CC: PCO File THIENA_N CONSTRUCTION, INC. Per your request we have revised our pricing proposal for the additional plug valves requested at the grit pumps. We are providing pricing on two plugs valves with a chain wheel operator, and one plug valve with a standard quarter turn with a handle. Add $3,028.00 Add Three Thousand Twenty Eight Dollars Attached is our detailed pricing breakdown of the costs associated with this work. We are also requesting a time extension of one (1) calendar day be added to the Contract to account for this work. If you have any questions or need any additional information, please feel free to contact either Brian Coryell or myself. DESCRIPTION QUAN. UNIT LABOR EQUIP UNITS TOTAL MATERIAL UNITS TOTAL SUB TOTAL Grit Pump Valves Material 6" Plug valve with chainwheel operator 2 ea $910.00 $1,820.00 $1,820.00 6" Plug valve with quarter turn handle I ea $577.40 $577.40 $577.40 shipping 1 Is $150.00 $150.00 $150.00 Contract Manager hr $80.00 Project Superintendent hr $72.00 Project Manager 0.5 hr $72.00 $36.00 $36.00 Project Engineer 1 hr $50.00 $50.00 $50.00 Project Coordinator hr $35.00 NAME: Carmel WWTP Contract 70 LOCATION: Carmel, IN ESTIMATED BY: JDM PRICED BY: JDM ARCH. OR CONTRACTOR: Thieneman Construction, Inc. and Jones Henry Engineers TYPE OF WORK: FLANGED PIPE Description: Add three plug valves at grit pumps EXTENDED BY: CHECKED BY: JDM BKC DESCRIPTION QUAN. UNIT DEDUCTIONS Subtotal= Page l of l $86.00 LABOR EQUIP UNITS TOTAL Subtotal= $2,547.40 MATERIAL UNITS TOTAL CHANGE ORDER REQUEST $3,028 ADDITIONAL CONTRACT TIME: 1 Day DATE: Labor 5.00% Material 5.00% Subs 5.00% Subtotal TOTAL DEDUCTS NET CHANGE PROPOSED C.O. 018 11/2/2010 $2,633.40 $12.90 Labor 15.00% Material 15.00% $382.11 Subs 5.00% Subtotal $3,028.41 Bond TOTAL ADDS $3,028.41 SUB TOTAL $3,028.41 Josh Morris From: Joshua Boyko 1934 INDYWW [joshua.boyko @ferguson:coml Sent: Tuesday, September 21, 2010 10:28 AM To: Josh Morris Subject: Email Bid# B111219 Bid No B111219 Bid Date...: 09/1711.0' Quoted By: JB Customer.: THIENEMAN CONSTRUCTION INC CARMEL WWTP 3313 EAST 83RD PLACE MERRILLVILLE. IN 46410 Cust- Pn. Item GNGK FNW4I OG TA'PBFPG D I'18FU Description DI18FV 1X2 GALV STL NIP 1 BRS 60ON WOG 2PC THRD FP BV DOM 4.DI 1254 C110 FLG TEE 4X1 DI 125 CI 10 TAP BLIND FLG 6-8 WEEK. LEAD TIME WHEEL AND 15' CHAIN FLGED EN DS Price Quotation B111219 FE!- Indianapolis, IN -WW #1934 6439 EAST 30TH STREET INDIANAPOLIS, IN 46219-0000 Phone 317- 546 -2013 Fax 317-546-2318 PSNBGZ I RF8P 4 ZN 1504 RR FE 1/8 FLO PKG 6 CI FLG N /LURE PLUG VLV 6 PRATT PLUG VALVE WITH CHAIN 6?CI• FIG NILUBE -PLUG VLV 6" PRATT PLUG VALVE WITH LEVER •FLANGED ENDS VALVE PRICING HAS ,w CHANGED DUE TO QUANTITY THERE WILL ALSO BE FREIGHT 3 tS" ADDED TO THETICKET Cust Phone: 31,7- 867 -3462 Terms NET 10TH PROX Ship To •THIENEMAN CONSTRUCTION INC CARMEL WWTP 3313 EAST 83RD PLACE MERRILLVILLE, IN 46410 Job Name.: CARMEL WWTP uantity Net Price LIM Total 2.000 EA 20:000 EA 146.570 E EA. 85.000 EA 12:600 EA 910:000 EA 577.400 EA Net Total: Tax: Total: 3864.94 0.00 3864.94 4:00 40'.00 293.14 1 70.00 50 40 2730:00 577.40 September 23, 2010 Dear Mr. Morris: Please resubmit. Sincerely, S 8i} HE Giu Daniel W. iller, '.E. Director of Wastewater DWM /kcm Jones Henry Engineers, Ltd. 2000 WEST CENTRAL AVENUE, TOLEDO, OHIO 43606 419/473 -9611 www.jheng.com FAX 419/473 -8924 Mr. Joshua Morris Thieneman Construction, Inc. 17110 Westfield Park Road, Suite lA Westfield, Indiana 46074 Subject: City of Carmel, Indiana Wastewater Treatment Plant Expansion Headworks and 106 Street Pump Station Contract 70 PCO #16 New Plug Valves and Fittings 451-5996.001 We are in receipt of your September 21, 2010 letter detailing the additional costs for plug valves and fittings. Please make the following revisions: Delete one of the 6 -inch plug valves with chain wheels. As you may recall, we deleted the valve leading up to the cyclone on the south side. Why are there handling costs? Even if the City supplied, handling would still be required. Delete these costs. Please delete the added flanged tee, blind flanged galvanized nipple, and ball valve. We added these with the idea there would not be additional costs. Delete the labor, since the added tee and accessories are deleted. Delete the costs for Project Superintendent, Manager, and Engineer since the valves required installation under the Contract. c: Construction Services CONSULTING ENGINEERS HANDLING ST. LOUIS MISSOURI Overhead Crane Hoist Specialists Since 1961 Phone: 314 842 -7263 11678 Gravois Road, St. Louis, Missouri 63126 ENGINEERING SALES Mr. Brian Coryell Thieneman Construction, Inc. 17110 Westfield Park Road Suite 1A Westfield, IN 46074 Subject: Carmel VWVTP Expansion- Contract 70 Thieneman Construction Purchase Order: 913P0010 Mr. Coryell, Per our discussion, please see below for the deduct to remove the ACCO hoist with geared trolley and overhead crane electrical accessories from the original order. Please advise if you would like to proceed with the changes noted below: Hoist w /Geared Trolley Crane Electrical Accessories Deduct Mark Oberkfell Respectfully Submitted, for harm uearea tjatenmed`" !rack ton I rolley w/ 1evl9 Coffing Model: CTA -60G 3 Ton Capacity 9' Hand Chain Drop SYSTEMS April 30, 2010 ($4,464.00) The above quoted hand geared trolley does not include spark resistant features. If you have any questions regarding the information requested please let me know. (c/4 -o Fax: 314 842 -5041 INSTALLATION 24 HOUR SERVICE July 14, 2010 Mr. Dan Miller, P.E. Jones Henry Engineers, Ltd. 2000 West Central Avenue Toledo, OH 43606 -3996 RE: Carmel WWTP Contract 70 PCO 8 Painting Credits TCI Project No.: 0913 J&H Project No.: 451- 5996.001 Dear Dan: Per your email on July 7, 2010 we are submitting separate pricing for deleting portions of the painting work on the interior of the new Grit/Screen Building. All proposed painting work to be deleted is on the lower level. The painting work on the second level and the floor coating remains. The deductive cost for the work associated with deleting the walls and ceiling painting work is: These are separate prices for each separate portion of work. If the Owner wishes to delete both the painting of the walls and the ceiling they would realize a credit of $8,550. If you have any questions or need any additional information, please contact myself at (317) 401 -6139. Respectfully, THIENEMAN CONSTRUCTION, INC. Joo uza .Maetio Joshua D. Morris, P.E. Project Engineer CC: PCO File 'HIEN CONSTRUCTION, INC. Option A Delete the painting of the interior lower level walls Deduct $5,100.00 ✓n Deduct Five Thousand One Hundred Dollars Option B Delete the painting of the ceiling of the lower level Deduct $3,450 Deduct Three Thousand Four Hundred Fifty Dollars April 16, 2010 Dear Mr. Coryell: Daniel Miller, P.E. Project anager DWM /rmb Jones Henry Engineers, Ltd. 2000 WEST CENTRAL AVENUE, TOLEDO, OHIO 43606 419/473 -9611 www.jheng:com FAX 419/473 -8924 Mr. Brian Coryell Theineman Construction, Inc. 17110 Westfield Park Road, Suite lA Westfield, Indiana 46074 Subject: City of Carmel, Indiana Wastewater Treatment Plant Expansion Headworks and 106 Street Pump Station Contract 70 Exhaust Fan No. 5 451- 5996.001 Please review and submit a detailed quotation for the larger fan. If you have any questions, please call. Sincerel c: Mr. Edward Wolfe ID. CONSULTING ENGINEERS Exhaust Fan No. 5 (EF -5) requires modification. The specifications required a design point of 9,000 cfm at 2 -inch water column, which must be modified to 9,600 cfm at 5-inch water column. The submitted supplier of exhaust fan EF -5 was Hartzell and they recommend a Model A40 -9 -27 with a 15 Hp motor. This increases the motor size from 7.5 Hp to 15 Hp, which will require a Size 2 starter at the MCC in lieu of the Size 1 shown on the Drawings, a 4 KVAR capacitor in lieu of a 3, and a 50 amp breaker in lieu of a 30 amp in MCC -HW, and an increase in feed wire size from 3 #12, 1 #12 Grd to 3 #10, and 1#10 Grd. Please note the revised fan will require a longer roof curb and back draft damper. A larger reducer will also be required on the discharge side of the fan. The fan manufacturer needs to allow for any pressure losses for these accessories in addition to the 5.0 water column of external losses. DESCRIPTION QUAN. UNIT LABOR EQUIP UNITS TOTAL MATERIAL UNITS TOTAL SUB TOTAL Subcontractor New Fan 1 Ea $6,258.00 $6.258.00 Reinforcing Steel 0.3 ton $129.62 $38.89 $555.00 $166.50 $150.00 $355.39 Concrete 1 cy $28.50 $28.50 $74.00 $74.00 $102.50 Formwork Material 39 sf $6.55 $255.45 $3.00 $117.00 $372.45 waterstop 20 If $3.00 $60.00 $2.00 $40.00 $100.00 rubbed finish 39 sf $3.50 $136.50 $0.50 $19.50 $156.00 Contract Manager hr $80.00 Project Superintendent hr $72.00 Project Manager 1.5 hr $72.00 $108.00 $108.00 Project Engineer 1.5 hr $50.00 $75.00 $75.00 Project Coordinator 1 hr $35.00 $35.00 $35.00 NAME: Carmel WWTP Contract 70 LOCATION: Carmel, IN ESTIMATED BY: DESCRIPTION DEDUCTIONS BKC PRICED BY BKC QUAN. UNIT ARCH. OR CONTRACTOR: Thieneman Construction, Inc. and Jones Henry Engineers TYPE OF WORK: PIPE Modifications to EF -5 EXTENDED BY: BKC Subtotal= subtract equipment= without equipment= Page I of I $737.34 $737.34 Subtotal= CHECKED BY: BKC $417.00 SUB $6,408.00 TOTAL ADDS Labor 15.00% $110.60 Material 15.00% $62.55 Subs 5.00% $320.40 Subtotal $8,055.89 Bond LABOR EQUIP UNITS TOTAL MATERIAL UNITS TOTAL Labor 5.00% Material 5.00% Subs 5.00% Subtotal TOTAL DEDUCTS NET CHANGE CHANGE ORDER REQUEST $8,056 ADDITIONAL CONTRACT TIME: 2 Days DATE: PROPOSED C.O. 10 8/4/2010 $7,562.34 $8,055.89 TOTAL $8,055.89 November 2, 2010 Mr. Dan Miller Jones and Henry Engineers, Ltd 2000 West Central Avenue Toledo, OH 43606 -3996 RE: City of Carmel Contract 70 PCOs for Change Order Dear Dan: Thieneman Construction has been asked to price up additional items as part of a change order to the contract. Below is a list of the items with pricing: The removal of the epoxy floor coating from the contract Deduct $15,000 The removal of the supernatant pump control panel Deduct 5,000 Attached letter of changes on the l &C No cost change Please forward a change order encompassing all the outstanding PCOs for the project previously discussed and agreed upon. If you have any questions or need any additional 'information, please contact me at (317) 867 3462. Respectfully, THIENEMAN CONSTRUCTION, INC. Brian Coryell Project Manager CC: Josh Morris File 1 4 d fl s 7 e B T 'EN AN CONSTRUCTION, INC. July 1 2010 City of Carmel WWTP Improvements TO: "Thienaman Construction AUTOMATION 10226 Pamona Ct. Fishers, Indiana 46038 The following notes and pricing. go with the re- submittal: Section l: LEVEL METERS As discussed, I have submitted ultrasonic level transmitters that use a remote unit for 4-20 mA output and level indication. This also eliminates the loop powered aspects of those that.were specified. We have submitted Endress and Hauser for cost savings and because the one used for flow has an integral flow calculator. ADDITIONAL COST: $1000 Section 4: TEMPERATURE EQUIPMENT Put in correct part number with selected RTD per information provided by Isreal. NO ADDITIONAL COST Section 5: PLC. equipment Downgraded PLC from 1756-L63 to 1756 -L61 per customer's request. CREDIT of $7000 total...$3500 each on one installed and one spare. Change Digital Input cards from 175 6 -IB -161, to. 1756 -IB16 per customer's request. CREDIT of $300 total...$75 each on three installed and one spare. Change Digital Output card from 1756-0A161 to 1756-0W161 per customer's request to eliminate AC voltage. CREDIT of $200 total...$100 each on one installed and one spare. Change Analog Input card from 1756 -IF16 to 1756 -IH8H per customer's request. CREDIT of $500 totaI...$250 each on one installed and one spare. Add an Analog Input card to provide spares. A Supernatant signal was added in the meeting and thus another card is required. ADDITIONAL COST: $1000 Section 9: ADD Fiber equipment Section Provide submittal information for required Fiber Box. We were required to provide an Ethernet switch, but it was not specified to be managed. Isreal gave me the exact part number the is required, and it is managed so there is an additional cost ADDITIONAL COST: $1000 Phone 317- 418 -9561 Fax 317 -913 -9998 Page 1 of 2 AUTOMATION 10226 Pamona Ct. Fishers, Indiana 46038 Section 10: ADD Operator Interface Section Provide submittal infomiation for new Panelview Plus. Isreal gave me the exact part number "the sis required. ADDITIONAL COST: $5000 Section 11: DRAWINGS #1 Added requested fuse style blocks for power isolation. Corrected missing parts and legend numbers: Updated PLC part numbers.:: Added Fiber equipment Added additional wiring duct and moved power section to the top per customer's request. #2 Updated power circuit and added fuse, blocks per customer's request. #3 Updated wiring' with new card and number system, per customer's request #4 Updated wiring with new card and number system per customer's request. #5 Updated wiring with new card and number system per customer's request. #6 Updated wiring with new card and number system per customer's request. #7- Updated wiring with new; card and .nuntber system per customer's request. #8- Added AI card .due 'to new signal per customer's request. #9- Updated wiring and number system per customer's request. Total of additional Charges: $8000, Total of Credits: $8000 >Net: $0 Please call me at 317 -418 -9561 if you have questions. Thank you very much! Sincerely, Sean Boland Maxim Automation, Inc. Phone =317- -418 -9561 Fax 317- -913 -9998 Page 2 of 2 DESCRIPTION QUAN. UNIT LABOR EQUIP UNITS TOTAL MATERIAL UNITS TOTAL SUB TOTAL Revised Pump Price 1 EA $61,835.00 $61,835.00 $61,835.00 Electrical Cost for VFD 1 EA $9,344.00 $9,344.00 $9,344.00 Seals for Pumps 1 Ea $7,000.00 $7,000.00 $7,000.00 Contract Manager hr $80.00 Project Superintendent hr $72.00 Project Manager 1 hr $72.00 $72.00 $72.00 Project Engineer 2 hr $50.00 $100.00 $100.00 Project Coordinator hr $35.00 NAME: Carmel WWTP Contract 70 LOCATION: Carmel, IN ESTIMATED BY: DESCRIPTION DEDUCTIONS Pump Price at Bid Time BKC PRICED BY: BKC QUAN. UNIT -1 Ea ARCH. OR CONTRACTOR: Thieneman Construction, Inc. and CSI Consultants TYPE OF WORK: Description: Change from 6" to 4" Pumps w/ VFD EXTENDED BY: CHECKED BY: BKC Subtotal= P a v i a $172.00 Subtotal= $78,179.00 $72,000.00 ($72,000.00) (572,000.00) SUB TOTAL ADDS CHANGE ORDER REQUEST $10,595 ADDITIONAL CONTRACT TIME: 0 Days DATE: PROPOSED C.O. 2 5/7/2010 78,351.00 $25.80 Labor 15.00% Material 10.00% $7,817.90 Subs 5.00% Subtotal $86,194.70 Bond LABOR EQUIP UNITS TOTAL MATERIAL UNITS TOTAL NET CHANGE $86,194.70 TOTAL ($72 ($72,000.00) Labor 5.00% Material 5.00% ($3,600.00) Subs 5.00% Subtotal (875.600.00) TOTAL DEDUCTS ($75 $10,594.70 JONES HENRY ENGINEERS, LTD. 2000 West Central Avenue Toledo, Ohio 43606 -3996 Telephone: 419.473.9611 FAX: 419.473.8924 Construction Bulletin No.: 060 Date: 6/1/10 By: DWM Contract: Carmel 70 WWTP Expansion Headworks 106 Street PS Project No.: 451 5996.001 Subject: Pumping Equipment Grit Pump Item No.: 11735 To: Thieneman Construction; City of Carmel, Indiana Submittal No.: 039 A J &H Eng., Ltd. (Office Toledo); J &H Eng. (Carmel Field) The following Shop Drawings are approved for use under their respective Contract Items in accordance with the Contract Drawings and Specifications. Quantity Identification Origin Description Comb Bound Book Morris Pumps Grit Pump Note: Motor must be explosion proof. Must Meet Class I, Division I, Group D Resubmit motor Information. I "r ck L S G lJotF_,L cf 0 ,5,e Svtv t���� "Il T�sa2 Distribution of Attached 4 of each Thieneman Construction Brian Coryell 1 of each City of Carmel, Indiana Edward Wolfe 1 of each Jones Henry Engineers, Ltd. 1 of each Jones Henry Engineers, Ltd. James Giradot Authorized By: Contractor Owner Office Field Approval in no way relieves the Contractor of any responsibility for capacities, performance, functions, compliance with Federal, State, and Local Codes; accuracy of dimensions and details; or continuity and completeness of the Project nor does approval constitute or imply any increase in Contract Price. EQUIPMENT SUMMARY MORRIS NON -CLOG CENTRIFUGAL PUMPS SERIES 6100 Job Name: Cannel WWTP Expansion, Contract 70 Order No: Quantity: 3 Type: Series 6100 I J Model: CTS HC 4 X Design Point: 300 GPM at 30 ft. TDH 4 Suction: 4f(in. Discharge: 4 0 in. Sphere: tin. Rotation: Left hand Discharge Position: 0 deg. Materials: ASTM A532, Class III, Type A, 28% chrome iron, 650 BUN casing, suction cover, impeller, rear liner. ASTM A48, Class 35, cast iron seal box, bearing frame. 1141 steel shaft. 450 BHN 420 stainless steel shaft sleeve. Graphite impregnated polymer packing with Teflon lantern ring and 316 stainless steel glands. Oil lubricated bearings. Accessories: Steel pump baseplate for a)4' pump and motor mounting. Motor ht. Steel V -belt guard. n I I U Fw Motor: gig HP: RPM: Frame: 2$ f I NEMA Design Letter: B Volts: 480 Phase: 3 Hertz: 60 Service Factor: 1.15 Ambient Temp: 40 deg C Manufacturer: Emerson Motor Co. Features: F insulation Cast Iron Construction Double Shielded Bearings Enclosure: TEFC /_Eki Duel Paint: SP -6 surface preparation, one coat Tnemec Hi -Build Epoxoline II, Series N62F Spare Parts: -(1)-seto€-belts.- Special Tool: (1) impeller removal tool. Testing: oAuT e: i II 1 1 'J 11 1' 117 i it n I r. Field Services: Installation inspection and certification. One day Operation and Maintenance Training One day additional training as requested by the owner. (11/22/2010) Dan Miller FW: Carmel WW VFD adder to MCC Page 1 From: "Brian Coryell" <BrianC @thienemanconstruction.com> To: "Dan Miller" <DMiller @jheng.com> Date: 4/22/2010 4:22 PM Subject: FW: Carmel WW VFD adder to MCC Dan, Here is the adder for the VFD's to be put in the MCC. Please remember that the actual cost will include the contractor's markup. Thanks, Brian K. Coryell Thieneman Construction 17110 Westfield Park Road Westfield, IN 46072 (317) 867 -3462 Phone (317) 474 -4636 Cell (317) 867 -3463 Fax brianc @thienemanconstruction.com Original Message--- From: Josh Morris Sent: Thursday, April 22, 2010 4:10 PM To: Brian Coryell Subject: FW: Carmel WW VFD adder to MCC Joshua D. Morris, P.E. Thieneman Construction, Inc. Office: (317) 867 -3462 Fax: (317) 867 -3463 Mobile: (317) 401 -6139 Original Message From: Sam Berry [mailto:sam @berry- electric.com] Sent: Thursday, April 22, 2010 4:06 PM To: Josh Morris Subject: Carmel WW VFD adder to MCC Josh, The adder for the Carmel WW MCC to remove the 3- 30 HP FVNR starteres and replace them with 3- 20 HP PowerFlex 70 VFD's in Nema 1 encloseures in the AB MCC is 9,344.00 Let me know, we have the MCC order on hold until we get this VFD change approved. Thanks F(11/22/2010) Dan Miller FW WW VFD adder to Page 2 Sam Berry <sam©berry-electric.com> Berry Electric Inc. DESCRIPTION QUAN. UNIT LABOR /EQUIP UNITS TOTAL MATERIAL UNITS TOTAL SUB TOTAL rental backhoe 1 days $230.00 $230.00 $230.00 rental hoe -ram for backhoe 1 days $200.00 $200.00 $200.00 delivery /demob 2 ea $50.00 $100.00 $100.00 Labor Foreman '8 hrs $37.71 $301.68 $301.68 Operator 8 hrs $48.36 $386.88 ,$386.88 Contract Manager hr $80.00 Project Superintendent hr $72.00 Project Manager hr $72.00 Project Engineer 0.5 hr $50.00 $25.00 $25.00 Project Coordinator hr $35.00 (11/11/2010) Dan Miller PCO #23 Concrete at light pole basespdf Page 1 NAME: Carmel WWTP Contract 70 LOCATION: Carmel, IN ESTIMATED BY: DESCRIPTION DEDUCTIONS JDM PRICED BY: JDM QUAN. UNIT ARCH. OR CONTRACTOR: Thieneman Construction, Inc. and Jones 8 Henry Engineers TYPE OF WORK: SITEWURK Description: Remove old concrete at the location of the light pole bases EXTENDED BY: CHECKED BY: JDM BKC Subtotal= $1,243.56 Subtotal without equipment $713.56 Subtotal of equipment $530.00 ubtotal= LABOR /EQUIP UNITS TOTAL Fie 1of1 MATERIAL UNITS TOTAL 9 SUB Labor 5.00% Material 5.00% Subs 5.00% Subtotal TOTAL DEDUCTS NET CHANGE CHANGE ORDER REQUEST $1,351 ADDITIONAL CONTRACT TIME: 1 Day DATE: PROPOSED C.O. 023 11/2/2010 Labor 15.00% $107.03 Material 15.00% Subs 5.00% Subtotal $1,350.59 Bond TOTAL ADDS $1,350.59 TOTAL $1,35059