Thieneman Construction/3/WWTP Expansion/+$11,122.00City of Carmel, Indiana; WWTP Expansion, Project Name of Project Headworks 106 Street Pump Station, Contract 70 Number 451 5996.002 Page 1 of 2 Contractor Address Jones Henry Engineers, Ltd. Thieneman Construction, Inc. 17110 Westfield Park Road, Suite 1A; Westfield, Indiana 46074 Bid Amount Net Change including Change Order 3 Present Contract Amount Change in Time of Completion Description of Change Item 1 Pressure Injection of Horizontal Surfaces Item 2 Joint Restraints for 12 -inch Water Line Item 3 Exploratory Work and Additional Labor to Install New Work Under Unforeseen Existing Water Lines Item 4 Delete Screenings Bagger Item 5 Delete SK -16 Item 6 Solenoid Valves 3,586.00 897.00 4,856.00 1,126.00 500.00 3,409.00 Approved City of Carmel, Indiana Owner CHANGE ORDER 5,454,500.00 330,114.38 5,124,385.65 April 15, 2011 to All claims against OWNER, which are incidental to or a consequence o >tChange Order, are satisfi Prepared By: Jones Henry Engineers, Ltd. By Engineer Accepted Thieneman Construction, Inc. By Contractor Total Increase Change Order No. 3 Date April 24, 2011 March 16, 2011 11,122.00 Date Date 3 /,30/// Date Item 2 Joint Restraints for 12 -Inch Water Line City of Carmel, Indiana Wastewater Treatment Plant Expansion Headworks and 106 Street Pump Station Contract 70 451 5996.002 Change Order No. 3 Item 1 Pressure Injection of Horizontal Surfaces The pressure injection of cracks of horizontal surfaces, per the letter of November 11, 2010 attached. The amount is $3,586.00. Injection of minor shrinkage cracks completed to minimize channel leakage. The Owner was unable to shut down the 12 -inch City water line, while the tie -in had to be completed for the 42 -inch. We are in agreement with the $897 cost for the additional joint restraints in the letter of February 10, 2011 attached. Item 3 Exploratory Work and Additional Labor to Install New Work Under S 4,856.00 Unforeseen Existing Water Lines The City of Carmel is in agreement with the exploratory work and additional labor to install the 42 -inch under the 20 -inch raw water main and 12 -inch finish water. The cost for this additional work is $4,856.00 per the letter of January 6, 2011 attached. The 20- inch and 12 -inch lines were not shown on the Contract Drawings, as they were installed after bidding. Item 4 Delete Screenings Bagger S 1,126.00 The City of Carmel accepts the credit for the deletion of the bagger at $1,126.00 as presented in the letter of February 17, 2011. The bagger was specified but not required. Item 5 Delete SK -16 The City of Carmel accepts the credit for the deletion of baffle SK -16 of $500.00. Baffle SK -16 was specified but is not required. Item 6 Solenoid Valves Added solenoid valves to reduce the plant water usage at the grit pumps. The solenoid valves were not part of the original Contract. Jones 8. Henry Engineers. Ltd. Page 2 of 2 3,586.00 897.00 500.00 3,409.00