HomeMy WebLinkAboutRieth Riley/7/Keystone at 116th Carmel/+$8,946.36TO: Lisa Scott
Engineering Admininstration
City of Carmel Indiana
One Civic Square
Carmel, IN 46032
I. You are directed to make the following changes in this Contract:
a. Add new pay items for additional work to the contract as follows: Additional PCCP crack
sealing and erosion control repairs on the east slope of Keystone Parkway south of 116th
Street.
ITEM
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: W.D.C. NO.:
Other:
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order
Contract Price will be increased/decreased by this Change Order
New Contract Price including this Change Order
Contract Time prior to this Change Order Days 11/1/2010
Net increased/decreased resulting from this Change Order 0
Current Contract Time including this Change Order 11/1/2010
This Change Order is for full and final settlement of all direct, indirect, impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are
Recommended
American Structurepoint, Inc.
ENGINEER
7260 Shadeland Station
Address
Indianapolis, IN 46256
City/State/Zip
By:
Phone: 311- 2$ -'l S(03 Phor
CITY OF CARMEL
The Above Changes Are
Accepted
Rieth -Riley Construction Co.
CONTRACTOR
1751 W. Minnesota
Address
City/State/Zip
tions
7) 634 -5561
Date: g iS i Date: August 15, 2011
CONTRACT CHANGE ORDER NO.: 7
DATE: August 17, 2011
PROJECT NAME: Keystone Parkway at 116th Street/Carmel Drive
CITY REQ. NO.:
CITY PO NO.: 07 -08 C
CITY PO DATE:
SCHEDULED ADJUSTMENT
AMOUNT OR DAYS
Indianapolis, IN 46221
mes Brainard, Mayor
Date:
25,453,105.34
8,946.36
25,462,051.70
Completion Date
Days
Completion Date
Approved
iana Cordra lerk- Treasurer
9-7-(/
V2‘
S
City of Carmel
Contract: _07-08C
Approved Not Eligible
_See Letter Dated
Contract Modification
Contract: _07 -08C, Keystone Parkway at 116th Street/Carmel Drive
8/12/2011 5:22 PM
FieldManager 4.5a
Cont. Mod.
Number
7
Revision
Number
Cont. Mod.
Date
8/12/2011
Net Change
$8,946.36
Awarded Contract Amount
$25,351,380.00
Route
Contract Location
Keystone Parkway at 116th Street/Carmel Drive
Short Description
Change Order 7
Description of Changes
Add new pay items for additional work to the contract as follows: Additional PCCP crack sealing and erosion control repairs
on the east slope of Keystone Parkway south of 116th Street.
New (teats
Project: 07 -08C, Keystone Parkway at 116th Street
Category: 1, Keystone Parkway at 116th Street
Item Description Item Code Prop.Ln. ItemType Unit Proposed Qty. Unit Price Dollar Value
Additional Crack Sealing for 10 IN PCCP _0904 0437 CHANGE DLRS 7,873.400 1.00000 $7,873.40
Reason: Pay item #0437 is being added to the contract to perform additional crack sealing during the 2010 construction season. The
work was completed on the 10" PCCP ramps and collector roads as directed by the City of Carmel Engineering Department.
Slope Repair South of 116th Street _0905 0438 CHANGE LS 1.000 1,072.96000 $1,072.96
Reason: Pay item #0438 is being added to the contract to perform repair work to the slope on the embankment along the east side of
Keystone Parkway south of 116th Street. The area had erosion concerns due to runoff from the roadway and repair detail was
provided by the City of Carmel Engineering Department.
Subtotal for Category 1:
Subtotal for Project 07 -08C:
FEDERAL PARTICIPATION ACTION BY F.H.W.A.
Cont. Mod.: 7
$8,946.36
$8,946.36
(Signature)
(Date)
226
#07 -08C 116th Street/Keystone Parkway Change Order #7
Item No.
Description
Unit Cost
Quantity
Unit
Total Cost
Deducts
Addition
Work Performed
0437
Additional Crack Sealing for 10 Inch PCCP
$1.00
7873.4
DLRS
$7,873.40
4
4/5/11, 4/6/11
0438
Rigid Insulation, 2 In.
$1,072.96
1
LS
$1,072.96
6/30/11, 7/1/11
Total Deductions: $0.00
Total Additions: $8,946.36
Net Total: $8,946.36