Loading...
Rieth Riley/7/Keystone at 116th Carmel/+$8,946.36TO: Lisa Scott Engineering Admininstration City of Carmel Indiana One Civic Square Carmel, IN 46032 I. You are directed to make the following changes in this Contract: a. Add new pay items for additional work to the contract as follows: Additional PCCP crack sealing and erosion control repairs on the east slope of Keystone Parkway south of 116th Street. ITEM II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. NO.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order Contract Price will be increased/decreased by this Change Order New Contract Price including this Change Order Contract Time prior to this Change Order Days 11/1/2010 Net increased/decreased resulting from this Change Order 0 Current Contract Time including this Change Order 11/1/2010 This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended American Structurepoint, Inc. ENGINEER 7260 Shadeland Station Address Indianapolis, IN 46256 City/State/Zip By: Phone: 311- 2$ -'l S(03 Phor CITY OF CARMEL The Above Changes Are Accepted Rieth -Riley Construction Co. CONTRACTOR 1751 W. Minnesota Address City/State/Zip tions 7) 634 -5561 Date: g iS i Date: August 15, 2011 CONTRACT CHANGE ORDER NO.: 7 DATE: August 17, 2011 PROJECT NAME: Keystone Parkway at 116th Street/Carmel Drive CITY REQ. NO.: CITY PO NO.: 07 -08 C CITY PO DATE: SCHEDULED ADJUSTMENT AMOUNT OR DAYS Indianapolis, IN 46221 mes Brainard, Mayor Date: 25,453,105.34 8,946.36 25,462,051.70 Completion Date Days Completion Date Approved iana Cordra lerk- Treasurer 9-7-(/ V2‘ S City of Carmel Contract: _07-08C Approved Not Eligible _See Letter Dated Contract Modification Contract: _07 -08C, Keystone Parkway at 116th Street/Carmel Drive 8/12/2011 5:22 PM FieldManager 4.5a Cont. Mod. Number 7 Revision Number Cont. Mod. Date 8/12/2011 Net Change $8,946.36 Awarded Contract Amount $25,351,380.00 Route Contract Location Keystone Parkway at 116th Street/Carmel Drive Short Description Change Order 7 Description of Changes Add new pay items for additional work to the contract as follows: Additional PCCP crack sealing and erosion control repairs on the east slope of Keystone Parkway south of 116th Street. New (teats Project: 07 -08C, Keystone Parkway at 116th Street Category: 1, Keystone Parkway at 116th Street Item Description Item Code Prop.Ln. ItemType Unit Proposed Qty. Unit Price Dollar Value Additional Crack Sealing for 10 IN PCCP _0904 0437 CHANGE DLRS 7,873.400 1.00000 $7,873.40 Reason: Pay item #0437 is being added to the contract to perform additional crack sealing during the 2010 construction season. The work was completed on the 10" PCCP ramps and collector roads as directed by the City of Carmel Engineering Department. Slope Repair South of 116th Street _0905 0438 CHANGE LS 1.000 1,072.96000 $1,072.96 Reason: Pay item #0438 is being added to the contract to perform repair work to the slope on the embankment along the east side of Keystone Parkway south of 116th Street. The area had erosion concerns due to runoff from the roadway and repair detail was provided by the City of Carmel Engineering Department. Subtotal for Category 1: Subtotal for Project 07 -08C: FEDERAL PARTICIPATION ACTION BY F.H.W.A. Cont. Mod.: 7 $8,946.36 $8,946.36 (Signature) (Date) 226 #07 -08C 116th Street/Keystone Parkway Change Order #7 Item No. Description Unit Cost Quantity Unit Total Cost Deducts Addition Work Performed 0437 Additional Crack Sealing for 10 Inch PCCP $1.00 7873.4 DLRS $7,873.40 4 4/5/11, 4/6/11 0438 Rigid Insulation, 2 In. $1,072.96 1 LS $1,072.96 6/30/11, 7/1/11 Total Deductions: $0.00 Total Additions: $8,946.36 Net Total: $8,946.36