HomeMy WebLinkAboutWalsh Contractor/6/Keystone Main/+$21,800TO: Lisa Scott Engineering Admininstration City of Carmel Indiana One Civic Square Carmel, IN 46032 I. II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. NO.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order 11,595,095.62 Contract Price will be increased by this Change Order 21,800.00 New Contract Price including this Change Order 11,616,895.62 Contract Time prior to this Change Order Days 11/1/2010 Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order Days 11/1/2010 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance The Above Changes Are Recommended American Structurepoint, Inc. ENGINEER 7260 Shadeland Station Address Indianapolis, IN 46256 City /State /Zip By: You are directed to make the following changes in this Contract: a. Add new pay items for additional work to the contract as follows: landscaping repair work on the 106th, 126th and 136th Street projects including resodding and adding mulch beds as directed by the City of Cannel Engineering Department and maintenance watering of all the new sod placed. Phone: 3/7 2$/ 9563 CITY OF CARMEL The Above Changes Are Accepted Walsh Construction CONTRACTOR 1260 East Summit Street Address CONTRACT CHANGE ORDER NO.: DATE: PROJECT NAME: CITY REQ. NO.: CITY PO NO.: CITY PO DATE: Crown Point, IN 46307 City /State /Zi Phone: 3(7. -665`t Date: 5127//f Date: g Z 7 June 1, 2011 of the changed work. Approved ames Brainard, Mayor 6 Keystone Main Street 07 -08 E D na Cordray, let Treasurer Date: -I/ City of Carmel Contract Modification Contract: _07 -08E, Keystone Parkway and Main Street Interchange 5/27/2011 1:45 PM FieldManager 4.5a Cont. Mod. Number 6 Revision Number Cont. Mod. Date 5/27/2011 Net Change $21,800.00 Awarded Contract Amount $11,746,826.97 Route Contract Location Keystone Parkway and Main Street Interchange Short Description Change Order 6 Description of Changes Add new pay items for additional work to the contract as follows: landscaping repair work on the 106th, 126th and 1360 Street projects including resodding and adding mulch beds as directed by the City of Carmel Engineering Department and maintenance watering of all the new sod placed. New Items Project: 07 -08E, Keystone Parkway and Main Street Interchange Category: 1, Keystone Parkway and Main Street Interchange Item Description Item Code Prop.Ln. ItemType Unit Proposed Qty. Unit Price Dollar Value Landscaping Repair Along Keystone _0899 0305 CHANGE DLRS 20,000.000 1.00000 $20,000.00 Parkway Reason: Pay item #0305 is being added to the contract to perform landscaping repair work on the 106th, 126th and 136th Street roundabouts at Keystone Parkway as directed by the City of Carmel Engineering Department. The landscaping repairs will include adding mulch beds over the concrete moment slabs and replacing sod that has died and adding topsoil as necessary to bring the grade level with the top of adjacent curb. Water, New Sod Areas 0900 0306 CHANGE EACH 1.000 1,800.00000 $1,800.00 Reason: Pay item #0306 is being added to the contract to water the sod that will be placed during the landscaping repair activities. The watering will be paid for each day the City of Carmel Engineering Department directs the contractor to water the sod due to dry conditions. Approved Not Eligible See Letter Dated (Signature) (Date) Contract: 07 -08E FEDERAL PARTICIPATION ACTION BY F.H.W.A. Cont. Mod.: 6 Subtotal for Category 1: $21,800.00 Subtotal for Project 07 -08E: $21,800.00 Page 1 of 1 FROM Wayne J. Kramer Inc. Wayne 3. Kramer Inc. PROPOSAL 5845 5.800 E. Zionsville, IN 460 Phone /Fax (317) 873 -4558 Email- waynekramer599gmail.com Proposal Submitted To: Walsh Construction Attn: Charlie Gannon Proposal No.05251101 DATE 5/25/2011 Project Mulching ,sod removal and replacement Total cost estimate 15,000 20,000 All material guaranteed as specified and the above work performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of Payment to e made as follows: Signature: ,6jk Aert bat Dollars PHONE NO. 3178734558 MAY. 25 2011 06:27AM P2 Work to be performed at Keystone 106'', 1 26 RAB's Mulch areas designated on plans with Black dyed hardwood mulch. 95 Cu. Yds. Estimated labor and materials 5,500 Grass areas Add topsoil to obtain proper grade and or remove dead sod and replace with Turf Type Tall Fescue sod ,first watering included 1,000 to 1,200 sq yds Estimated labor and materials 12,500 to $14,500 Additional waterings as needed and directed $1,800 per day in addition to the above costs. The above prices, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to complete this contract as specified. Payment wilt be made as outlined Date of Acceptance Signature: Signature: