HomeMy WebLinkAboutWalsh Contractor/5/Keystone Main/+$38,068.91TO: Lisa Scott Engineering Admininstration City of Carmel Indiana One Civic Square Carmel, IN 46032 CITY REQ. NO.: CITY PO NO.: CITY PO DATE: I. You are directed to make the following changes in this Contract: a. Add new pay items for additional work to the contract as follows: re- establish a swale to Cool Creek on northeast corner of project limits, add additional 12" RCP along Lamar property on east side of Main Street, remove /transport existing light poles to Carmel Street Department, premium time for Sunday work for Highway Technologies, remove /modify /reset existing. panel signs at 126th Street and 136th Street, paved side ditch and additional riprap at STA 585 +10, Lt., additional concrete and grading work for 16' x 25' driveway addition at Augenberg property, adjustments to Structures #31 and #32, and miscellaneous work by Gradex, Inc. The miscellaneous work by Gradex consisted of modifying Structure #211 to grade, modification to new structures on west side of Main Street due to storm pipe changes and removal of unknown existing 24" CMP. ITEM II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: y W.D.C. NO.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order Contract Price will be increased by this Change Order New Contract Price including this Change Order Contract Time prior to this Change Order Days Net increased/decreased resulting from this Change Order Current Contract Time including this Change Order Days 11/1/2010 This Change Order is for full and final settlement of all direct, indirect, impact extensions incurred at any time resulting from the performance of the changed The Above Changes Are Recommended American Structurepoint, Inc. ENGINEER 7260 Shadeland Station Address Indianapolis, IN 46256 City /State /Zip By: Phone: Date: 3 28i -1s63 2 Z 2olt CITY OF CARMEL The Above Changes Are Accepted Walsh Construction CONTRACTOR 2749 N. SR 39 Address CONTRACT CHANGE ORDER NO.: 5 DATE: February 1, 2011 PROJECT NAME: Keystone Main Street LaPorte, IN 46350 City /State/ Phone:?] 17.1 y. Utc S Date: J /'20/1 11/1/2010 0 AS TO i -0RM BY L. 07 -08 E AMOUNT OR DAYS Completion Date Days Completion Date costs and time work. pproved Date: mes Brainard Mayer 11,557,026.71 38,068.91 11,595,095.62 neer ST: Tana Cordray, '4 k- Treasurer City of Carmel New Items Project: 07 -08E, Keystone Parkway and Main Street Interchange Category: 1, Keystone Parkway and Main Street Interchange Contract: _07 08E, Keystone Parkway and Main Street Interchange Item Description Re -establish Swale to Cool Creek Add 12" RCP at Lamar Property Contract: _07-08E Contract Modification 1/31/2011 5:11 PM FieldManager 4.5a Cont. Mod. Number 5 Revision Number 1 Cont. Mod. Date 1/31/2011 Net Change $38,068.91 Awarded Contract Amount $11,746,826.97 Route Contract Location Keystone Parkway and Main Street Interchange Short Description Change Order 5 Description of Changes Add new pay items for additional work to the contract as follows: re- establish a swale to Cool Creek on northeast corner 01 project limits, add additional 12" RCP along Lamar property on east side of Main Street, remove /transport existing light poles to Carmel Street Department, premium time for Sunday work for Highway Technologies, remove /modify /reset existing panel signs at 126th Street and 136th Street, paved side ditch and additional riprap at STA 585 +10, Lt., additional concrete and grading work for 16' x 25' driveway addition at Augenberg property and miscellaneous work by Gradex, Inc. The work by Gradex consisted of modifying Structure #211 to grade, modification to new structures on west side of Main Street due to storm pipe changes and removal of unknown existing 24" CMP. Item Code Prop.Ln. ItemType Unit Proposed Qty. Unit Price Dollar Value _0849 0296 CHANGE LS 1.000 3,433.23000 $3,433.23 Reason: Pay item #0296 is being added to the contract to pay for work to re- establish a swale on the southeast corner of the Cool Creek Bridge. This work was necessary to allow the drainage from the outfall of Structure #129 of the Main Street project to reach Cool Creek from some additional utility work performed after the 136th Street project. _0872 0297 CHANGE LS 1.000 10,304.97000 $10,304.97 Reason: Pay item #0297 is being added to the contract to pay for the installation of 12" RCP along the south side of Main Street at the eastern limits of construction. The City of Carmel Engineering Department added this work to the project during the pre -final walkthrough for the project completion. Remove and Transport Existing Light _0873 0298 CHANGE LS 1.000 2,941.77000 $2,941.77 Poles Reason: Pay item #0298 is being added to the contract to pay for the removal and transporting of the existing light poles to the Carmel Street Department as directed by the City of Carmel Engineering Department. Premium Time for Sunday Work by _0897 0299 CHANGE LS 1.000 1,605.09000 $1,605.09 Highway Tech Reason: Pay item #0299 is being added to the contract to pay for premium time on Sunday, August 8, 2010 for Highway Technologies to install the thermoplastic pavement markings on the Main Street roundabout. Cont. Mod.: 5, Rev. 1 Page 1 of 2 City of Carmel Additional 16' x 25' Driveway at Augenbergs Miscellaneous Gradex Work Adjustment to Structures 31 and 32 _0898 0304 CHANGE LS Contract: _07-08E Contract Modification Reason: Adjustment to existing structures due to the storm pipe modifications made on the West side of Main Street. Cont. Mod.: 5, Rev. 1 1/31/2011 5:11 PM FieldManager 4.5a New Items Project 07 -08E, Keystone Parkway and Main Street Interchange Category: 1, Keystone Parkway and Main Street Interchange Item Description Item Code Prop.Ln. ItemType Unit Proposed Qty. Unit Price Dollar Value Remove, Transport, Modify and Reinstall _0875 0300 CHANGE LS 1.000 3,509.57000 $3,509.57 Panel Signs Reason: Pay item #0300 is being added to the contract to pay to reset and modify the existing panel signs from the 126th Street and 136th Street projects after the Main Street project was constructed. The locations of the existing signs were altered at the direction of the City of Carmel Engineering Department. Paved Side Ditch and Install Riprap at _0876 0301 CHANGE LS 1.000 3,664.92000 $3,664.92 STA 585 +10, Lt Reason: Pay item #0301 is being added for additional erosion control work at STA 585 +10, Lt. The work was to repair erosion caused due to water shedding off of Keystone Parkway into the existing ditch along the west side of Keystone just north of MSE Wall C. The work consisted of placing some additional riprap and a concrete paved side ditch to collect the water without eroding the embankment. _0877 0302 CHANGE LS 1.000 2,940.75000 $2,940.75 Reason: Pay item #0302 is being added to the contract to add an additional 16' x 25' driveway extension at the Augenberg residence (STA 47 +76, Lt.) as directed by the City of Carmel Engineering Department. _0878 0303 CHANGE LS 1.000 9,146.58000 $9,146.58 Reason: Pay item #0303 is being added to the contract for miscellaneous work performed by Gradex, Inc. during the course of the project. The items included for this pay item are the work necessary to raise Structure #211 due to changing the concrete barrier wall to a gravity wall; the work necessary to modify the storm pipe structures on the West side of Main Street due to the delay in the right -of -way acquisition with the Augenberg parcel; and the work necessary to remove and backfill the area of an existing 24" CMP not shown on the plans the pipe was unknown until excavation had begun. 1.000 522.03000 $522.03 Subtotal for Category 1: $38,068.91 Subtotal for Project 07 -08E: $38,068.91 FEDERAL PARTICIPATION ACTION BY F.H.W.A. Approved Not Eligible See Letter Dated (Signature) (Date) Page 2 of 2 3/cl Change Order #5 Item No. Description Unit Cost Quantity Unit Total Cost Deducts Addition Work Performed 0296 Re- establish swale to Cool Creek $3,433.23 1 LS $3,433.23 Ni 10/1/10, 10/5/10 0297 Add 12" RCP at Lamar property $10,304.97 1 LS $10,304.97 J 10/6/10, 10/7/10, 10/8/10, 10/11/10 0298 Remove and Transport Existing Light Poles $2,941.77 1 LS $2,941.77 NI 4/10/2010 0299 Premium Time for Sunday work by Highway Tech $1,605.09 1 LS $1,605.09 J 8/8/2010 0300 Remove, Transport, Modify and Reinstall Panel Signs $3,509.57 1 LS $3,509.57 NI 11/8/2010 0301 Paved Side Ditch and install riprap at STA 585 +10, Lt $3,664.92 1 LS $3,664.92 NI 11/22/10, 12/2/10 0302 Additional 16' x 25' Driveway at Augenbergs $2,940.75 1 LS $2,940.75 Ni 12/2/10, 12/8/10 0303 Miscellaneous Gradex Work $9,146.58 1 LS $9,146.58 4 6/10/10, 6/13/10, 6/30/10 0304 Adjustment to Structure #31 and #32 $522.03 1 LS $522.03 Ni Total Deductions: $0.00 Total Additions: $38,068.91 Net Total: $38,068.91