Loading...
Walsh Contractor/7/Keystone Main/+$12,660.53TO: Lisa Scott Engineering Admininstration City of Carmel Indiana One Civic Square Carmel, IN 46032 The Above Changes Are Recommended American Structurepoint. Inc ENGINEER 7260 Shadeland Station Address Indianapolis. IN 46256 City /StateiZip Bv: Date: Phone: 3/ 7— 281— 4,533 8 -Z- It CITY OF CARMEL I. You are directed to make the following changes in this Contract: a. Add new pay items for additional work to the contract as follows: fine grading around the additional driveway at the Augenberg property, topsoil work along the right of way at the Griggs property and slope repair work on the west side of Keystone north of VISE Wall C. II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: W.D.C. NO.: Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order Contract Price will be increased by this Change Order New Contract Price including this Change Order Contract Time prior to this Change Order Days Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order Days 11 /1 /2010 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Accepted Walsh Construction CONTRACTOR Crown Point. IN 46307 City /State /Zi ATT ST: Burke, Member 1260 East Summit Street Address Phone: 317, T-1-1/ Date: CONTRACT CHANGE ORDER NO.: DATE: PROJECT NAME: CITY REQ. NO.: CITY PO NO.: CITY PO DATE: 11/1/2010 Completion Date James Brainard Mav iana Cordray, lerk- Treasurer Date: August 3, 2011 Keystone Main Street 07 -08 E Approved 7 11,616,895.62 12,660.53 11,629,556.15 6,4 Change Order #7 Item No Description Unit Cost Quantity Unit Total Cost Deducts Addition Work Performed 0307 Fine grading around Augenberg's added driveway $1,842.34 1 LS $1,842.34 J 5/12/2011 0308 Topsoil work at Griggs Property $4,261.38 1 LS $4,261.38 J 6/03/11, 6/29/11 0309 Slope work north of MSE Wall C $6,556.81 1 LS $6,556.81 J 6/14/11, 6/16/11, 6/17/11 Total Deductions: $0.00 Total Additions: $12,680.53 Net Total: $12,660.53 The Walsh Group 07 -08E Fine Grading Around Augensberg Added Drive #307).xlsx, Pagel Walsh Construction EXTRA WORK SUMMARY Date: 08/01/2011 Project Number: 07 -08E Project Name: Keystone Ave /Main St Title: Fine Grading Around Augensberg's Added Driveway umb Description LABOR MATERIALS EQUIPMENT SUBCONTRACT Gradex, Inc BOND INSURANCE Insurance Performance Bond bent .....Coat Subtotal 1 LS $1,649.90 $1,649.90 1 LS 1 LS $14.52 $14.52 $10.44 $10.44 Mark -up :Markup;: Rule <;Cost i,i L M M E SI I/B I/B $164.99 $1.45 $1.04 TOTAL Total Cost $1,814.89 $15.97 $11.48 $1,842.34 Note: Mark -up rules are L =20% labor, E =12% equipment, M =12% materials, S1 =10 %sub <$3000 S2 =sub >$3000, I /B =10% Bonds Insurance 4 0307 Fine `-?f 4b1Jc AT /44.< Ent B EFZ4 D Comments: See attached sheets for breakdown of costs U ii/842, 314 Walsh Construction Insurance Bond Cost Breakdown Fine Grading Around Augensberg's Added Driveway 07 -08E Keystone Main St ITEM CHANGE ORDER VALUE RATE UNIT TOTAL INSURANCE PERFORMANCE BOND 1,814.89 0.008 1 14.52 1,814.89 5.75 1,000 10.44 TOTALS: 10% Mark -up: 24.95 2.50 27.45 4/4c