Date: March 16, 2004
Project No.: #02079
Project Name: Clay Terrace
We Are Sending
By Way Of:
r--! Fax
r-] Mail
r-] Express Mail
r--] Separate Cover
I--I Federal Express
I'-! UPS
I~ Courier
r-] Hand Delivered
F'I Your Messenger
The Following:
Action Required:
J--! Transparencies
r'-I Prints
I-I Samples
I-] Diskette
r'l For Review
r-I For Approval
I~ For Your Use
r'-] As Requested
r'-i copy of Letter
r-! specifications
I--I Shop Drawings
I-'1 Drawing Log
r--! Reviewed- No Exception
I--! Reviewed - W/Exception
l"-! Rejected / Resubmit
r-i Reviewed No Action
I~ Submittal Info
I-'1 Change Orders
E] Change Bulletins
E] For Distribution
E] Return Prints
I--I Prints Returned
Copies Date Description
2 3-16-04 Building E2 - ADLS Submittal
,
,
Remarks:
If you have any questions, please contact Fred Simmons.
Copies To:
Simmons Office File
By: Carla Cartwright
Transmittal With Copies To:
Only Enclosures
Transmittal
Only
W~h
Enclosures
IF ENCLOSURES ARE NOT AS INDICATED, PLEASE NOTIFY US AT ONCE
Date: January 14, 2004
Project Name: Clay Terrace
ON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville, IN 46060
Ph: 317-773-2181 Fax: 317-776-1101
Present at Site: John South, Hamilton Co. SWCD; Mike Sparks, Lauth
This Report Provided To Mr. Mike Sparks Jason Dapp, Gradex
Lauth Fax: 573:3979
Fax: 815:8872
Carmel DOCS
File
TYPE OF EVALUATION:
Initial X Routine Follow-up Complaint
This evaluation is intended to assess the level of compliance with 327 MC 15-5 (Rule 5). It is also intended to identify areas where
additional measures may be required to control erosion and sedimentation. All practices recommended in this report should be
evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer.
All erosion and sediment control measures shah meet the design criteria, standards, and specifications outlined in the "Indiana
Handbook for Erosion Control in Developing Areas" or similar guidance documents.
Current Site Information: Mass grading is nearly completed. Storm sewer is installed. Many buildings
are under construction and some or the gravel or paved lots are established. Road work has stopped.
None of the stormwater basins are completed. Some of the disturbed areas at the south end of the site
have been mulched. The large stock pile at the north end has not mulched. The power lines prevent
further soil movement until the power is relocated. The outlet pipe for the northern sediment basin is
still not installed correctly.
The Following Items Have Been Evaluated and Assigned a Designation of:
S = Satisfactory M = Marginal U = Unsatisfactory NA = Not Applicable
Construction Site Management for Erosion and Sediment Control
U (1) Disturbed areas have been adequately protected through seeding or other appropriate erosion and
U
n/a
U
S
N/A
S
M
N/A
sediment control measures.
(2) Appropriate perimeter sediment control measures have been implemented.
(3) Conveyance channels have been stabilized or protected with appropriate sediment control measures.
(4) Erosion & sediment control measures are installed properly.
(5) Storm drain inlets have been adequately protected.
(6) Outlets have been adequately stabilized.
(7) Existing erosion & sediment control measures are being maintained.
(8) Public & private roadways are being kept clear of accumulated sediment or tracked soil.
(9) Erosion & sediment control measures have been installed and maintained on individual building sites.
Status of Sediment Retention On-Site
Site conditions present a high potential for off-site sedimentation.
There is evidence of off-site sedimentation.
Describe:
X Please Refer to the Comments Section of this Report
Definitions
Satisfactory: The item is currently in compliance with the Rule
Marginal: A concern has been identified; corrective action is strongly recommended to remain in compliance
Unsatisfactory: A violation has been identified and the site is not in compliance; corrective action is required
Not Applicable: Does not apply at this stage of construction Revised 4/98
ON-SITE EVALUATION FOR EROSION AND SEDIMENT CONTROL
COMMENTS
PROJECT NAME: ClayTerraee
Page 2
The items checked below were to be correct by 12/17/03. These items remain uncompleted and must be corrected prior
1/30/04, unless otherwise noted.
X Install an appropriate sediment control practice between construction areas and lower lying areas. The
detention basin in the north east comer of the site needs to function as the sediment basin for that part of the
watershed. The slotted riser needs to be backfilled with #8 stone and cut off at the correct height. The dam
should be stable, seeded and mulched. Stormwater that flows from the construction trailers north along the
old frontage road must be directed into the basin. A potential channel has been left between the two stockpiles
on the east side of the basin. This channel needs to be closed up and all discharge directed through the slotted
riser. The stock pile must be mulched or surrounded with silt fence.
Replace/Repair silt fence and/or straw bale barriers.
Entrench silt fence (6-8 in.) and/or straw bale barriers (4 -6 in.) and stake straw bales.
Remove accumulated sediment from:
storm drain inlet protection devices,
sediment traps/basins, behind silt fence/straw bales,
streets and gutters (Do not flush with water)
around
X
X
Temporary seed, fertilize, and/or mulch: Soil stockpiles at the north end of the site.
Permanent seed, fertilize, and mulch areas that are at final grade
Protect storm drain inlets: Xcurb inlets, X drop inlets as inlets are installed. Fabric under the casting
is not an approved practice for a functioning inlet.
Reshape and stabilize sideslopes of' sediment traps/basins, detention/retention basin
Install/Maintain construction entrance(s):
Reshape and stabilize conveyance channels:
Place greater emphasis on erosion and sediment control on building sites; contractors, subcontractors,
material vendors, and others should be made aware of erosion and sediment control requirements.
Appropriate perimeter sediment controls (e.g. silt fence) and stable construction entrances shall be
utilized on all sites. Sediment tracked into the street shall be removed (do not flush with water) at the
end of each work day.
X Other Requirements:
Repair the stone check dam for the outlet of the south basin (on the south side of new Rangeline
Road) or fill in the drainage cut. This south basin is to be mulched.
Raise by 18" the horse shoe rock dam protecting the existing box culvert on the west side of the
frontage road.
This report submitted by:
Revised 4 / 98
John B. South P.E.
Babbitt, Pamela A
From:
Sent:
To:
Cc:
Subject:
Butler, Angelina V
Wednesday, March 17, 2004 4:27 PM
Babbitt, Pamela A
Morrissey, Phyllis G; Pattyn, Dawn E; Tingley, Connie S; Hollibaugh, Mike P; Keeling,
Adrienne M; Kendall, Jeff A; Brewer, Scott I; Hancock, Ramona B; Dobosiewicz, Jon C; Stahl,
Gayle H; Pohlman, Jesse M
Docket No. Assignment: (ADLS Amend) Clay Terrace, bldg E-2 (#04030026 ADLS Amend)
Pam,
Please print and fax this e-mail to the petitioner identified below and update the file. I have issued the
necessary Docket Number for (ADLS Amend) Clay Terrace, bldg E-2. It will be the following'
Docket No. 04030026 ADLS Amend: Clay Terrace, Bldg E-2 -ADLS Amendment
The applicant seeks approval for a retail building.
The site is located at 14250 Clay Terrace Boulevard.
The site is zoned PUD/Planned Unit Development.
Filed by Frederick Simmons of Simmons & Simmons Associates.
Petitioner, please note the following:
1. This Item will not be on an agenda of the Technical Advisory Committee.
2. Mailed and Published Public Notice does not need to occur.
3. Proof of Notice is not needed.
4. ?~he Filing Fe~e-ah-dEigh~t(8)-?~f0~rmational Packets~must be delivered to Plan Commission
Secretary Ramona Hancock no later than N. oo,n~Erl~day~Ma~reh~tg~.~ Failure to submit Informational
Packets by this time will result in the tabling of the petition to the Tuesday, May 4, 2004 agenda of the
Plan Commission Special Studies Committee.
5. This Item will appear on the Tuesday, March 30, 2004 agenda of the Plan Commission Special
Studies Committee.
PETITIONER: refer to your instruction sheet for more detail.
PETITIONER: please complete the following prior to submitting the informational packets'
1 .) Please provide a location map.
2.) Please provide color renderings/elevations.
3.) Bring material/color samples to the Meeting.
4.) Show details of wall-mounted light fixtures, if any.
5.) Provide a landscape plan for the building. Also, provide a copy to the Urban Forester.
Please contact Mr. Simmons at 656-3500 (Fax: 656-3501) with this information. Once the file is
updated please return it to Jon's office.
Thank you,
Angie
From'
Sent:
To:
Subject:
Babbitt, Pamela A
Wednesday, March 17, 2004 3:18 PM
Brewer, Scott I; Butler, Angelina V; Dobosiewicz, Jon C; Hoilibaugh, Mike P; Keeling, Adrienne
M; Pattyn, Dawn E
newi
Clay Terrace
bldg E-2
14250 Clay Terrace blvd.
Contact:
Fred Simmons
656-3500
656-3501 fax