HomeMy WebLinkAboutRieth Riley/5/106th Path Michigan to Ditch/+$178,588.86 CITY OF CARMEL TO: Engineering Department CONTRACT CHANGE ORDER NO.: 5 One Civic Square DATE:September 9, 2011 Carmel, IN 46032 PROJECT NAME: #09 -05 106th St. Path Michigan Rd. to Ditch Rd. CITY REQ. NO.: CITY PO NO.: #27441 CITY PO DATE: 7/21/2010 I. You are directed to make the following changes in this Contract: s A See Attached Exhibit A O SCHEDULED ADJUSTMENT i"''` ITEM AMOUNT OR DAYS See Attached Change Order Table $178,588.86 0 Days II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.:_N /A_W.D.C. NO.: N/A Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $707,956.64 Contract Price will be increased /decreased by this Change Order $178,588.86 New Contract Price including this Change Order $886,545.50 Contract Time prior to this Change Order 168 Days 7/23/2011 Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 168 Days 7/23/2011 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved Recommended Accepted CROSSROAD ENGINEERS Rieth -Riley Construction Co. (NW— ENGINEER CONTRACTOR am.- Brainard, yor 3417 Sherman Drive 1751 W. Minnesota Address Address e Mc r de, Ci ngin Beech Grove, IN 46107 Indianapolis, IN 46221 r I City /State /Zip Ci /State /Zip B Member Air EFS "o Member By:Derrick Bye ki, au r Tate VP I Opexations Ai L I 11 P f 40 Phone: 317- 780 -1555 Phone: 317- 634 -5561 l iana Cordray, Clerk- Trfurer Date: of Date: 9/13/11 Date: 1 CITY OF CARMEL 106th Street Path Michigan Road to Ditch Road Project 09 -05 CHANGE ORDER TABLE #5 ORIGINAL ORIGINAL FINAL FINAL ITEM NO. DESCRIPTION UNIT PRICE QUANTITY AMOUNT QUANTITY AMOUNT OVER /UNDER 1 Mobilization /Demobilization $33,000.00 1 $33,000.00 .1 $33,000.00 $0.00 2 Maintenance of Traffic $26,000.00 1 $26,000.00 1 $26,000.00 $0.00 3 Clearing Right of Way $38,188.16 1 $38,188.16 1 538,188.16 $0.00 4 Tree Removal $22,850.00 1 $22,850.00 1 $22,850.00 $0.00 5 Linear Ditch Grading $14.00 2171 $30,394.00 3262 $45,668.00 $15,274.00 6 Linear Grading for Path $10.30 9800 $100,940.00 12080.7 8124,431.21 $23,491.21 7 Manhole, Type C $2,500.00 1 $2,500.00 1 $2,500.00 $0.00 8 Concrete Pipe Catch Basin, 18" $1,200.00 1 $1,200.00 2 $2,400.00 $1,200.00 9 4" HDPE $56.00 41 $2,296.00 61 $3,416.00 $1,120.00 10 12" CMP $51.00 50 $2,550.00 37 $1,887.00 $663.00 11 12" RCP $44.00 126 $5,544.00 116 $5,104.00 $440.00 12 12" Concrete Pipe End Section $827.00 3 $2,481.00 4 $3,308.00 $827.00 13 71" x 47" Elliptical CMP $130.00 34 $4,420.00 34 $4,420.00 $0.00 14 Mechanically Core Existing Structure $960.00 1 $960.00 3 $2,880.00 $1,920.00 15 Str. #15 Relocation $2,000.00 1 $2,000.00 1 $2,000.00 $0.00 16 Reinforced Concrete Headwall $11,000.00 1 $11,000.00 3 $33,000.00 $22,000.00 17 Handrail $315.00 39 $12,285.00 105 $33,075.00 $20,790.00 18 B- Borrow for Structure Backfill $21.00 150 $3,150.00 116.1 $2,438.10 $711.90 19 Rip Rap, Revetment, Maximum 6 IN. $45.50 25 $1,137.50 291.74 $13,274.17 $12,136.67 20 Replace Casting and Adjust to Grade $625.00 6 53,750.00 13 $8,125.00 $4,375.00 21 Str. #11, Adjust to Grade $210.00 1 $210.00 0 $0.00 $210.00 22 Utility Manhole, Adjust to Grade $210.00 1 $210.00 2 $420.00 $210.00 23 Sanitary Manhole, Adjust to Grade $210.00 2 $420.00 2 $420.00 $0.00 24 Water Valve, Adjust to Grade $210.00 3 $630.00 23 $4,830.00 $4,200.00 25 Sprinkler Heads, Remove and Relocate $2,700.00 1 $2,700.00 0 $0.00 $2,700.00 26 Sanitary Cleanout Relocation $3,500.00 1 $3,500.00 0 $0.00 $3,500.00 27 HMA Surface, Type A $73,50 870 $63,945.00 880.99 564,752.77 $807.76 28 HMA Intermediate, Type A $55.00 1420 $78,100.00 2235.7 $122,963.50 $44,863.50 29 Surface Milling, 1 -1/2" $10.00 372 $3,720.00 0 $0.00 $3,720.00 30 Compacted Agg. No. 53, Base $23.50 2870 $67,445.00 4451.39 $104,607.67 $37,162.67 31 Sidewalk, Concrete, 4" $56.00 54 $3,024.00 142.8 $7,996.80 $4,972.80 32 Concrete Paved Side Ditch, Type A $31.50 983 $30,964.50 405 512,757.50 $18,207.00 33 Curb and Gutter, Concrete $29.50 395 $11,652.50 943.3 $27,827.35 $16,174.85 34 Concrete Curb Ramp, Type G 587.50 236 $20,650.00 188.8 516,520.00 $4,130.00 35 Nursery Sodding $2.72 18720 $50,918.40 0 $0.00 $50,918.40 36 Erosion Control Blanket $2.30 200 $460.00 1816.67 $4,178.34 $3,718.34 37 Erosion Control Measures $11,904.94 1 $11,904.94 1 $11,904.94 $0.00 38 Topsoil (Undistributed) $1.00 3500 $3,500.00 330 $330.00 $3,170.00 Street Sign and Post, Remove and 39 Relocate $150.00 2 5300.00 2 $300.00 50.00 40 Yard Light, Remove and Relocate $500.00 1 $500.00 0 $0.00 $500.00 A -1 Additional, Clearing of Right -of -Way $1,000.00 1 $1,000.00 1 $1,000.00 $0.00 A -2 Additional, Tree Removal $2,000.00 1 52,000.00 1 $2,000.00 $0.00 41 3' x 5' Precast Concrete Box Culvert 5868.97 16 513,903.52 16 $13,903.52 $0.00 42 3' x 8' Precast Concrete Box Culvert $387.59 32 $12,402.88 32 $12,402.88 $0.00 *45 Mobilization /Demobilization 2,680.28 1 $2,680.28 1 $2,680.28 $0.00 *46 Clearing Right of Way 2,799.26 1 52,799.26 1 $2,799.26 $0.00 *47 15" RCP End Section 1,143.59 1 $1,143.59 1 51,143.59 50.00 *48 18" RCP 130.25 62 $8,075.50 54 $7,033.50 $1,042.00 *49 18" Concrete Pipe End Section 1,193.99 1 $1,193.99 1 $1,193.99 $0.00 *50 Reinforced Concrete Headwall 1,144.44 5.5 $6,294.42 5.5 $6,294.42 $0.00 *51 12" Class A Concrete for Roadway Path 250.06 18 $4.501.08 24.4 86,101.46 $1,600.38 *52 Detour Route Marker Assembly 192.50 10 $1,925.00 10 $1,925.00 50.00 *53 Construction Sign A 328.50 12 $3,942.00 12 $3,942.00 $0.00 *54 Construction Sign B 110.00 2 $220.00 2 $220.00 50.00 *55 Barricade, Type III 22.00 72 $1,584.00 72 51,584.00 $0.00 *56 Line, Thermo, Solid White 4" 5.50 16 $88.00 80 $440.00 $352.00 *57 Line, Thermo, Solid Yellow 4" 5.50 16 $88.00 80 $440.00 $352.00 *58 Clean Existing 3' x 8' Box Culvert 2,824.93 1 52,824.93 1 $2,824.93 $0.00 *59 Stand Up Curb, 18" $45.05 104 54,685.20 104 $4,685.20 50.00 *60 4" PVC Smooth Wall $40.37 27 $1,089.99 27 $1,089.99 50.00 *61 Mulching Seeding- Special Blend $0.85 19493 516,569.05 19493 516,569.05 50.00 *62 Mobilization Demobilization for Seeding 5779.32 1 $779.32 1 $779.32 $0.00 *63 A-4 Manhole replacement Structure #5 $4,071.47 1 54,071.47 1 54,071.47 $0.00 *64 Meter Pit Relocation 2100 W. 106th $3,648.13 1 $3,648.13 1 $3,648.13 $0.00 �m_..� 7 ��c M �,z b.:� ^"^v ?r ..�.g•: -:w, '_.;�'."�;�5: i °a rye:: er ,,,.T,..,�,..,; '�,r.. Fv 1`' y d w v d Y,'. r o- .M X73'. S y y i F}} y .',7. Ft, i t{ J: ry `y,." 7 -A1., 1 s "„8k j. F tiR w s,':. 4 .4 -f,. 54...,- Y`�t. S. •t`a' 2 3 mi Y v2c x� �r.� x,�=_ t._,e >i:',` vet .P.W .L.s� �.•;ni 'A_ v, ti Y 1 r i j ,.t,.` k r k=1,8,816;6050 qR l+% f� •s� Jt: �A'�,"", .a� TOTAL`OF CHANGE'ORDER T ''`rh TL': al, ,EMS' .;,N �"�z.� n 64;400 QO w�.N l a _:n<..�,, ..��s �:$:1,�8,58886. TOTAL ORIGINAL CONTRACT PLUS CHANGE ORDER ITEMS ORIGINAL CONTRACT PRICE $664,400.00 CHANGE ORDER #1 $26,306.40 CHANGE ORDER #2 $34,535.12 CHANGE ORDER #3 $2,824.93 CHANGE ORDER #4 $20,109.81 CHANGE ORDER #5 $178,588.86 NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS 5886,545.50 Indicates additional item added to the contract.