City of Carmel
CARMEL PLAN COMMISSION
July 18, 2006
Minutes
The regularly scheduled meeting of the Carmel Plan Commission opened with the Pledge of Allegiance at
6:00 PM on July 18, 2006 in the Council Chambers of City Hall, Carmel, Indiana.
Members present: Jerry Chomanczuk, Leo Dierckman, Mark Rattermann, Rick Ripma, Carol Schleif, and
Susan Westermeier, thereby constituting a quorum.
DOCS Staff: Mike Hollibaugh, Director, Matt Griffin, Christine Barton Holmes, intern Nathan Anderson.
Also John Molitor, Legal Counsel.
The minutes of the June 20, 2006 meeting were approved as submitted.
F. Communications, Bills, Expenditures, Legal Counsel Report
John Molitor suggested scheduling a meeting of the Executive Committee to look at potential
changes in the Rules of Procedure; this could be done to coincide with the regularly scheduled
Committee meeting on August first.
G. Reports, Announcements, Department Concerns
Matt Griffin reported that two items have been continued to August 15: Item lh, Guerrero Property
PUD, and Item li, Midtown Village PUD.
1G. Gramercy Economic Development Plan Resolution
by Michael R. Shaver, Wabash Scientific
Michael Shaver, President of Wabash Scientific appeared before the Commission representing the
Carmel Redevelopment Commission. Also in attendance: Bruce Donaldson, attorney with Barnes
Thornburg appeared before the Commission representing the Carmel Redevelopment Commission.
Michael Shaver stated that he authored the Gramercy Economic Development Plan dated July 11,
2006. The Plan was developed on the basis of information presented to the Plan Commission. One
of the maps included in the Plan is an aerial of the Gramercy site and its connection to the Carmel
Drive commercial area. The Gramercy developer is working with the Redevelopment Commission
to structure a Tax Increment Financing District and an appropriate designation of tax allocation
areas. The issue before the Plan Commission this evening is the approval or disapproval of the
S:/ PlanCommission /MemorandumofMeeting /2006 /2006july18MEMO
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
Resolution that states that the Economic Development Plan conforms to the overall plan of
development for the City of Carmel.
The Redevelopment Commission thought it would be more appropriate to wait until the Plan
Commission had taken action and made its recommendation to the City Council before it took action
on the Economic Development area.
The Tax Increment Financing (TIF) structure will help defray the cost of infrastructure revisions to
what is now the Mohawk Hills Apartment Complex and the redevelopment of that particular tract of
land that includes the Golf Course and Apartments.
Mr. Shaver asked that this item be referred to the Executive Committee for further review.
Jerry Chomanczuk questioned certain sections of the Plan, in particular paragraph 5 that states "The
Plan Commission has determined that no residents of the City of Carmel will be displaced by the
proposed development thereof." How can we make that determination with any amount of
certainty?
Bruce Donaldson, attorney with Barnes Thornburg who serves as counsel for the Redevelopment
Commission responded that under the Redevelopment statute, the Redevelopment Commission and
the Plan Commission are required to take into consideration whether the Redevelopment
Commission's projects will displace any residents. It is the understanding that the Redevelopment's
role in this will be basically for the public infrastructure— streets, parking, etc. While the purchase of
the property by the developer and change in the use may result in residents relocating to other areas,
the Redevelopment Commission's role in just doing the public infrastructure as designed, would not.
Jerry Chomanczuk also questioned why the Developer is not prominently named from the beginning
of the document as opposed to the tail end with the tables Buckingham
Mike Shaver responded that the Redevelopment Commission simply did not want the name of the
developer to get in the way of whatever the contemplation is —the project is the project ultimately
the name of the developer was felt to be unimportant to what was being done. However, the
Buckingham name can certainly be inserted throughout.
Jerry Chomanczuk responded that it was OK as is, but did wonder if it was an oversight. Page 5,
first paragraph, last sentence says that the Economic Development Plan does not intend to suggest
that such an outcome (urban blight) would be manifest here. Page 11 we start seeing contradictory
statements which tend to indicate that this will evolve into some form of potential blight. This is a
little inconsistent.
Mike Shaver referred to page 5 and said it is a general statement about owners of apartment
complexes and different kinds of developments and their investment decisions with regard to that
ownership. Do they invest a sufficient amount of money to keep the property current, do they have
an accumulating list of maintenance items that have not been performed for any reason. Is there a
chronic problem with disinvestments where the owners have removed revenue from the project
S:/ PlanCommission /MemorandumofMeeting /2006 /2006july18MEMO 2
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
without reinvesting. Page 11 —there comes a point in this process where a choice can be made: Do
you want to invest significantly?
Jerry Chomanczuk then referred to pages 6 and 7, the legal description of the economic development
area and tax parcels —has this been proofed?
Mike Shaver responded a hopeful affirmative.
Jerry Chomanczuk referred to page 9 —what we are talking about is a location ideally suited for
commercial development. The commercial element of Gramercy is in its interior. People driving
along Keystone, whether north or south, to go within the interior of a planned development —it is
really that accurate? A corollary would be the Village of WestClay with its commercial elements
within its core of the development. How is this ideally located?
Mike Shaver responded that the Gramercy development is immediately adjacent to the commercial
area located along Carmel Drive. If you were to postulate that a community needs "X" number of
square feet of commercial area based on a certain size and certain income, and the amount of square
footage being proposed for commercial under the Gramercy proposal is inappropriate for the City of
Carmel, then the question becomes, "Where would it be located In the case of Village of West
Clay, they have 131s Street, a two -lane road, but they only have 100,000 square feet of commercial
development and they are on the west side of US 31. This particular site is located next to a divided
highway. If the redevelopment takes place in the urban portion of the City, the amount of sprawl is
reduced and increase the access of the existing part of Carmel to retail shopping without having to
develop another Simon -type mall on the outskirts. This particular site, being adjacent to existing
commercial and a four -lane divided highway with turn lanes is an appropriate location for high
intensity commercial development.
Jerry Chomanczuk said he would forward additional comments to Mr. Shaver. There is also an issue
with page 21 —the estimated, additional annual COIT. Why don't we just clarify the numbers?
These numbers seem somewhat higher.
Mr. Shaver felt that terms such as "average median" is redundant. We wanted to make it clear that it
was an inadvertent nomenclature issue. Mr. Shaver said he would identify sources and clarify the
numbers.
Jerry Chomanczuk also asked about a parking structure and whether or not one was actively
encouraged.
Rick Ripma asked for clarification on the TIF —what the developer is asking for is, rather than
paying for the infrastructure themselves, the City taxes would pay for it.
Matt Griffin confirmed comments made by Rick Ripma. An area within the development is being
identified where tax dollars will be utilized to pay for infrastructure and improvements.
Rick Ripma wondered why the City would do that —every other developer pays for his development.
S:/ PlanCommission /MemorandumofMeeting /2006 /2006july18MEMO 3
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
Bruce Donaldson responded that the City is not committing any of its general tax sources —a portion
of the infrastructure dollar, higher than $20 million, would come from the Tax Increment Finance
new incremental taxes from their development. If the project does not develop, the developer is on
the hook for it. It is similar to other deals the City has done with Merchants Square, Merchants
Pointe, Parkwood, etc. There is significant precedent in the City for doing these types of "developer
TIFs" where new taxes coming off the development will be devoted to fund public infrastructure.
Again, if it does not develop, the developer is on the hook for it. The short answer to the question
is that at this point, the Redevelopment Commission needs to help find a way to fund the
infrastructure to make this project happen —if not, it probably won't happen.
Mark Rattermann asked about the design of the law that created the TIF and the EDA's —why the
legislature would do that and is it a requirement that it be a blighted area.
Bruce Donaldson explained that the TIF is a tool for stimulating economic and redevelopment in
situations where it might not happen if this tool was not used. There are two different types of areas:
one is a blighted area, one is an economic development area different statutory findings— either one
can be declared a TIF area and must meet the statutory findings that are outlined in the plan; it is
related to creating new jobs, etc. This is partly related to the commercial development portion of the
plan.
Mike Shaver noted that the plan provides for 78,950 square feet of retail/commercial, 40,000 square
feet of office space, and 120,000 square foot hotel. All of those should have been put in the initial
plan before the Commission and there should be no surprise there.
David Leazenby, Buckingham Properties, said the plan provides for 150,000 square feet of office
service /retail uses as outlined in the PUD Ordinance before the City Council for review. There is a
phase II that is within the TIF, Economic Development Area that is not on the Gramercy property
that is also included in the plan, that is the Marsh building (The Fountains,) and the Barnes property
which is owned by Buckingham —that is Phase II commercial redevelopment. There are areas
outside of what was approved at Plan Commission.
Mark Rattermann then gave forth his understanding, that the extra tax on these buildings to be built
will be taken to purchase bonds that will be used for infrastructure. How long are the bonds?
Mike Shaver confirmed Mark Rattermann's understanding; however, it has not yet been determined
how long the bonds are —it could be 20 years, 25 years, etc.
Mark Rattermann continued that the money that would be taxed on the buildings above the assessed
value today would be used to pay off the debt for the infrastructure. Specifically what infrastructure
improvements are we talking about —how much of this is on site, how much is off site?
Mike Shaver referred to Page 20 of the Economic Development Plan is a Property Tax, AV TIF:
Projections Strategy developed by H.J.Umbaugh. $28 million is the approximate current value of
the four parcels with an estimated assessed value (not construction value) of $275 million. The
breakdown is on page 21 in five line items: street, curbs, paths, lighting, demolition, stormwater
management, soft costs, etc., $12 million; public open spaces and parks, $2 6million; public parking
S:/ PlanCommission /MemorandumofMeeting /2006 /2006july18MEMO 4
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
garages, $4 million; 126 Street improvements, $700,000 and Auman Neighborhood Improvements,
$700,000. It is not yet on a map.
Mark Rattermann responded that where these improvements sit will be very telling. If the road is
inside the project, that may affect the vote on this —if the road is 126 Street, that is a different story.
If it is a parking garage on the property, on Gramercy property, that is one thing —if it is a parking
garage someplace where the City has open and public access, that is completely different. It is vital
that we see exactly where these public improvements will be so that we know exactly what it is that
the tax dollars from the bond revenue will be constructing. The taxes off these projects will come
back to pay these bonds.
Mike Shaver stated that all of those issues are to be addressed by the Redevelopment Commission.
There was further discussion and explanation of the TIF and examples given of TIF areas.
John Molitor opined that under the Rules of Procedure, the Executive Committee would be the
appropriate body to hear this Plan. The Executive Committee does have jurisdiction over
administrative matters and technically, this is an administrative determination as to whether or not
this plan complies with the Comprehensive Plan for the City.
Jerry Chomanczuk forwarded the Gramercy Economic Development Plan to the Executive
Committee (date to be determined) for review and recommendation to the full Plan Commission.
Plan Commission members were encouraged to submit their comments to the President.
The Agenda for the Executive Committee Meeting will be published according to Statute giving the
time, location and subject matter.
H. Public Hearings:
1H. Docket No. 06010003 Z: Guerrero Property PUD CONT. TO AUG. 15.
The applicant seeks to rezone 38.8 acres from S1 /Residential to PUD/Planned Unit
Development for the purpose of developing attached single family residences and
townhomes.
The site is located at the northwest corner of Towne Road and 131s Street.
Filed by Charles Frankenberger of Nelson and Frankenberger for Indiana Land
Development Co.
2H. Docket No. 06060005 DP: Block G, West Carmel Marketplace
The applicant seeks site plan approval for a proposed commercial retail building.
Elevations and an ADLS /DP Amend application will be submitted at a later date.
The site is located at 99 Street and North Michigan Road and is zoned B2 /B3.
Filed by Chris Laystrom of Woolpert Engineering for Duke Construction.
Chris Laystrom, Woolpert Engineering appeared before the Commission representing the applicant.
The applicant is seeking approval for the construction of a commercial retail building on Block G
within the West Carmel Marketplace located at 99 Street and North Michigan Road. A 24X36 site
S:/ PlanCommission/ MemorandumofMeeting /2006/2006july18MEMO 5
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
plan was provided.
Block G is an 8 -acre site within the overall development of West Carmel Marketplace and is
currently undeveloped. Block G is located at the corner of future Commerce Drive and 99 Street,
the southwest corner, and adjacent to the future Home Depot store.
The applicant is seeking site plan approval. The parking lot consists of 489 spaces with curbed
islands, landscaping, lighting, and utilities. At this time, there is no identifiable building footprint and
the applicant will return to the Commission for ADLS review and approval.
Department Report, Matt Griffin: The applicant is requesting Development Plan approval and there
is no detail on the building. Typically, this is seen as DP /ADLS —when a tenant is selected and the
DP is approved, the applicant would come in with a footprint of the building and improvements
would come in either as ADLS alone or a DP Amend /ADLS request, depending on the amount of
changes. There are two issues with the current proposal: 1) The Department is still awaiting the
lighting plan; this is in the 421 Overlay and the photo- metrics are a little off. 2) The Urban Forester
is requesting some species substitution. Otherwise, this is an anticipated project with no surprises,
therefore, the Department is recommending fmal approval at the Committee level as opposed to
returning to the full Commission.
Members of the public were invited to speak in favor of or opposition to this petition; no one
appeared and the public hearing was closed.
Commission Comments
Carol Schleif wondered about the square footage —isn't there a limit of 85,000 square feet that was
passed by Council on June 5, 2006? This petition was submitted prior to that.
Department Comments, Matt Griffin This petition was not submitted prior to Council action;
however, the overall size limit does not fall within this area —that is south of this site.
Leo Dierckman asked about the logic in going through the DP process only at this time.
Chris Laystrom responded that Duke's intention is to complete work before the winter season. Duke
has commitments from Home Depot to provide access to their trailer and loading dock areas.
Commerce Drive will not be completed in a timely fashion; Home Depot will be finished in mid
September. The petitioner is providing temporary access through this site.
Carol Schleif said she thought Commerce Drive was finished and was sure she had driven on the
asphalt and rear access to the loading docks to Home Depot.
Paul McLaughlin, Duke Realty responded that there is a temporary access drive for the construction
period so that trucks can get back to the loading docks. The center is moving forward with their
opening time, and this is the best way to get retail traffic to the front of the store —it will be limited
to a single access off Walnut Creek if the 99 Street access is not opened across the front of the site.
Rick Ripma commented that when Home Depot came through the Commission, there was a side
S:/ PlanCommission /MemorandumofMeeting /2006 /2006july18MEMO 6
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
view and it did not show another building at this site.
Matt Griffin responded that when Home Depot cam through, they had an unimproved wall. They
may have made a commitment to clad the wall in brick if there was no other building; the west wall
was a blank.
Leo Dierckman made formal motion to forward Docket No. 06060005 DP, Block G, West Carmel
Marketplace to the Special Studies Committee on August 1, 2006 with full authority to approve this
item, seconded by Susan Westermeier, Approved 6 -0.
3H. Docket No. 06050020 PP: Clay Creek
The applicant seeks to plat 30 lots on 29.971 acres.
The site is located on Hoover Road north of 116 Street and is zoned Si.
The applicant seeks the following waivers for the proposed plat:
06050021 SW: SCO Chapter 6.03.07 Cul -de -sac Length request to have cul de sac
in excess of 600 feet in length
06050022 SW: SCO Chapter 6.05.07 Orientation of Home request to allow
dwellings to face internal street
06050023 SW: SCO Chapter 7.05.07 Clearing of greater than 15% of mature
woodlands.
Filed by Charlie Frankenberger for MHE Development Co. LLC.
Charlie Frankenberger, attorney with Nelson Frankenberger appeared before the Commission
representing the applicant. Also present: Bob Ellis on behalf MHE Development.
The subject real estate comprises approximately 30 acres, zoned S -1, and located just north of 116
Street adjacent to Hoover Road. MHE Development is requesting Primary Plat approval to develop
the real estate under the existing S -1 classification. The plat would be known as Clay Creek and
consist of 30 lots; the density is one per acre with 28% open space and significant tree preservation
areas to the south along the Meeting House Road to be constructed.
The residences will be custom homes and will range in price from $750,000 to $950,000 plus.
Architectural commitments, while not required, are included in the informational packets. Meeting
House Road shown on the northern boundary does not exist today, however it is shown on the
Thoroughfare Plan for Carmel. As part of this request for 30 lots, the petitioner is required not only
to dedicate all of the land for this segment of Meeting House Road, but also to build this segment of
Meeting House Road adjacent to the northern boundary of the real estate. The Thoroughfare Plan
designates this as a collector street and it will align with the existing Meeting House Road on the
west side of Hoover Road.
A neighborhood meeting was held on July 11, 2006; the petitioner was asked about eliminating the
median shown in Meeting House Road. It is the petitioner's understanding that the City requires
landscaping in the center of Meeting House Road, therefore, the pavement width will be reduced
(not the right -of -way.) The petitioner was asked to narrow the width of the right -of- way —the
Thoroughfare Plan indicates that Meeting House Road is a collector street and that an 80 foot wide
right -of -way is required.
S:/ PlanCommission/ MemorandumofMeeting /2006/2006july18MEMO 7
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
Originally, MHE requested three waivers: 1) Cul -de -sac length. 2) Orientation of dwellings.
3) Clearing of greater than 15% mature woodlands. Pursuant to the Department's recommendation,
the design of the cul -de -sac now includes a stub to the east, and the need for the cul -de -sac length
waiver is obviated. Regarding the orientation of dwellings, the waiver will prevent the backs of
homes (6 homes) to face the perimeter road; two homes will face Meeting House Road. As
indicated in the informational packets, berms are proposed in the buffer areas and additional
architectural features are required for those residences. Regarding the tree clearing, the petitioner
must clear trees within the right -of -way of Meeting House Road in order to comply with the
requirements of constructing Meeting House Road. Regarding approximately 8 acres of woodlands
located outside of Meeting House Road and within Clay Creek, MHE Development will preserve
approximately 5.5 acres and clear approximately 2.49 acres. To mitigate, MHE Development has
committed to reforest, to the extent it clears more than 15% of the woodlands within Clay Creek.
The reforestation is currently being discussed with Scott Brewer, Urban Forester.
At this time, the petitioner is requesting Primary Plat approval for 30 lots on 30 acres, consistent
with S -1 requirements. The density is also consistent with that permitted in the S -1 classification.
The homes will be custom built, exceed the S -1 requirements, and range in price from $750,000 to
$950,000.
Members of the public were invited to speak in favor of the petition; no one appeared. Members of
the public were invited to speak in opposition to the petition; the following appeared:
Public Remonstrance /Unfavorable:
Kevin Denois, 1837 Braeburn Drive, Carmel was concerned with construction of the road
location, configuration, and preservation of the existing tree line, and buffer being provided. Mr.
Denois stated concern with the specified 80 -foot right -of -way as opposed to the 120 -foot right -of-
way. Mr. Bahney feels that the proposed plan inconsistently applies the requirement of standard
procedure planning, including the Thoroughfare Plan. Mr. Denois referred to a letter dated July 17,
2006 addressed to the Department and will provide a copy for the Commission.
Doug Bahney, eastern-most lot that borders the proposed development —has no issue with the
proposed development as far as lot size, type of homes, etc., but does have an issue with the
placement of Meeting House Road due to the safety factor —it is in residential back yards —and the
effect on the mature tree line, and impact on housing values. Consider re- locating the road to the
south side of the development —that would alleviate concerns expressed. Ditch Road could still be
matched -up.
Rick Reard, High Grove Subdivision, objected to the location of the road because of the access that
would be adjacent to the High Grove property.
Rebuttal, Charlie Frankenberger: Meeting House Road is shown as a collector on the Thoroughfare
Plan. Again, there was much discussion as to whether or not it could be narrowed and if the median
could be eliminated. Regarding the location of Meeting House Road, the engineers have conferred
with the City Engineers Meeting House Road is in the location that is desirable to the City. It is
desirable for many reasons: It will eventually extend farther east and then south to Ditch Road.
S:/ PlanCommission/ MemorandumofMeeting /2006/2006july18MEMO 8
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
Meeting House Road, because it is an important road, will occur whether it is feasible for the
petitioner to develop the land or not. If the petitioner does not develop it and the City were to
acquire the land eventually through eminent domain, it would be constructed with public funds. The
City would like to choose the location of the road. Also, Meeting House Road must align with the
existing Meeting House Road on the opposite side of the street. The location as shown has a lesser
impact on the natural attribute of the real estate and permits an area of tree preservation to remain as
a single area and not be split. The required buffering is also being provided.
Department Comments, Matt Griffin: As was stated, Meeting House Road is a part of the
Thoroughfare Plan and has been since the 1990 Comp Plan process. As requested in that plan, the
right -of -way is 80 feet. The improvements as shown are what are called out in the current
construction plan for the Thoroughfare Plan. There is probably discussion to be had on how much
planting goes on in each side of the road, and how wide the improvements are within the 80 -foot
right -of -way. What is shown is what is being requested by the City and is an important link in the
Thoroughfare Plan system —the link is required by the City.
Regarding the landscape plan: As stated, there are a lot of substantial trees on the site and the Urban
Forester feels that there may be an opportunity to identify those trees within the bufferyard. We are
doing a better job of preserving the existing and possibly maintaining a better buffer between this
property and the property to the north as well as other trees on site. Also, Carmel Engineering had a
list of concerns and comments and a lot of those have been addressed through the revised plans seen
this evening. The Department is requesting that the petitioner touch base with engineering and go
over the list again, identify outstanding items, and revise. At this time, the Department is
recommending this item be sent to the Subdivision Committee on August 1, 2006 at 6:00 PM for
further review.
Rick Ripma asked that the petitioner submit drawings from the road into the community in
connection with the orientation of home waiver. The Committee would also like to see some
commitments regarding construction of the homes —the back of the homes, landscaping on those
lots, etc. Detail should be presented showing what will be cleared as far as the trees, what will be
added, and the placement.
Mark Rattermann commented that the Thoroughfare Plan being referred to is on the City website
and he encouraged the residents to access the site. This leg of the road has been on the plan for at
least 10 years. Maybe there is some flexibility here —there is no easy solution.
Leo Dierckman asked for confirmation that there is a trail planned for both the north and the south
side of Meeting House Road.
Charlie Frankenberger responded in the affirmative.
Carol Schleif was concerned about the planting strip as a buffer between the development and
adjacent neighborhood. Also, the plan looks as if it is really short on shrubs. A lot of the shrubs are
not evergreen and that means they will be brown in the winter. Regarding existing trees that might
be cut, Carol asked for an aerial with an overlay indicating the trees and sizes for the entire site that
would be cut down. If it is over 15 it is important to look at.
S:/ PlanCommission/ MemorandumofMeeting /2006/2006july18MEMO 9
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
Mike Hollibaugh, Director, Department of Community Services addressed the Commission. When
High Grove was platted, this segment of roadway was on the Thoroughfare Plan and it was
discussed. At that time, the City tried to get some reservation of right -of -way or buffer as a part of
the plat; the Plan Commission felt that it was not necessary. We have done this to ourselves on a
number of occasions where there is a line on the Thoroughfare Plan and we let it slip away to the
point where we end up with one option and not everyone is happy with that one option. The
concept for the boulevard —the City has been building the boulevard as a part of the bond issue and
that is the standard that the Engineering Dept. has moved forward with. The idea is that rather than
having two lanes of pavement, a median helps to break that up and minimize the impact of a
roadway. We are slowly implementing the plan. When you hear for the first time that there will be a
road in your back yard, it is hard to swallow. The Department will continue to look at ways to
adjust it with the developer and Engineering in order to minimize everyone's pain.
Docket No. 06050020 PP: Clay Creek was referred to the Subdivision Committee for further
review on August 1, 2006 at 6:00 PM in the Caucus Rooms of City Hall.
The meeting continued following a short recess.
4H. Docket No. 06060004 Z: 122 Pennsylvania Rezone
The applicant seeks to rezone 27.41 acres from RI and M3 to B3 to allow for
medium density commercial office development.
The site is located on the northeast corner of 122 Street and Pennsylvania Street.
Filed by Paul Reis of Bose McKinney Evans LLP for Panattoni Development.
Paul Reis, attorney with Bose McKinney Evans, 600 East 96 Street, Suite 500 appeared before
the Commission representing the applicant. Also in attendance: Nathan McClure, Panattoni
Development, and Steve Granner, Land Use Consultant with Bose McKinney
Panatonni Development develops, leases, and manages industrial office and retail projects in more
than 85 cities throughout the United States, including Indianapolis, Plainfield, and Noblesville. This
is their first entry into the Carmel market. Panatonni is proposing to develop approximately 27 acres
of undeveloped land located at the northeast corner of Pennsylvania Street and 122n Street.
The site is bound on the north by Kirk Furniture, Hamilton Crossing Retail Center, and Carmel
Drive —to the south is the Conseco campus, undeveloped land, and the REI parcel —also a helipad.
The site consists of three parcels —two parcels are in the Residential R -1 zone district, the third and
largest one is in the M -3 District. The site is identified in the Comprehensive Plan within a regional
community employment area with a recommendation for medium intensity development. What that
contemplates is low to mid -rise office complexes between three and five floors, community retail
centers up to 200,000 square feet and retail developments greater than 10 acres in size.
Panatonni Development is petitioning to rezone these three parcels into the B -3 Business District
that provides a wide variety of commercial and office uses while regulating businesses in developing
areas. With the Old Meridian District slowly beginning to redevelop, there will be continued
development as well as development of the vacant parcels within the Meridian Technology Center.
S: PlanC ommis lion /Memorandumo (Meeting/ 2006 2006j uly18MEMO
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
10
At this point, the petitioner has already filed the ADLS and Development Plan applications and has
included the conceptual site plan with the informational materials. Three buildings are anticipated,
anywhere from two to three stories in height, general office uses. It is the petitioner's belief that the
rezone will be very complimentary to the existing, adjacent uses and will be responsible growth
consistent with the US 31 corridor.
Members of the public were invited to speak in favor of or opposition to the petition; no one
appeared and the public hearing was closed.
Department Report, Matt Griffin: As previously stated, a portion of this site is a rezone from an R -1
and M -3 zone to a B -3 Business classification —this complies with the current Comprehensive Plan
for the zoning in terms of use for the area. Next month, the DP /ADLS will be before the Plan
Commission. At this time, the Plan Commission is considering the Rezone —next month the Plan
Commission will be reviewing what is actually proposed on this site. The Department is
recommending this item be sent to the Special Studies Committee for further review on August 1,
2006. It would be appropriate for the Committee and the Commission to request commitments at
this stage of the rezone in the form of architectural commitments or site design. This proposal does
comply with the zoning in the Comprehensive Plan.
Commission Comments:
Jerry Chomanczuk said that when Conseco purchased these properties, it did not take any action to
rezone to B -3 or B -5 —it was dormant. The City would certainly like to see a B -3 or B -5 zoning in
this area. This is probably more or a "housekeeping" issue at this point.
Mark Rattermann concurred with comments made by Jerry Chomanczuk.
Rick Ripma noted that the buildings are not very attractive perhaps when the petitioner comes
under ADLS review, some changes could be made.
Leo Dierckman concurred as to the aesthetics of the buildings and noted that the property is a "sea
of asphalt." Somehow, there needs to be some green space incorporated into the plan.
Jerry Chomanczuk noted that with the construction of the buildings, those will be across from the
Irsay Helipad —would there be any flight pattern issues to be considered? Has `Kopper Airways"
responded or commented to the public notice.
Paul Reis responded that his firm represents Bopper Airways and correspondence was sent from
Bopper to the developer, Panatonni. Everyone is one board that this is an operating helipad and
everyone understands and believes the flight path does not interfere with any construction.
Jerry Chomanczuk asked if there had been any notification or interaction with the Meridian
Technology Park Association administrators. There is also a concern with the proximity of the
egress on Pennsylvania Street. There is a round about planned for Old Meridian at this intersection.
Paul Reis said he would follow up and make contacts with the appropriate people. The round about
S: PlanC ommis lion /Memorandumo (Meeting/ 2006 2006j uly18MEMO
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
11
would not have any impact on this particular site; the petitioner has been in contact with Gary
Duncan in the Engineering Department.
Carol Schleif commented that building number three needs a lot more windows offices need
maximum light for increased productivity.
Docket No. 06060004 Z, 122 Pennsylvania Rezone was referred to the Special Studies
Committee for further review on August 1, 2006 at 6:00 PM.
5H. Docket No. 06060006 PP Replat: Little Farm Subdivision Lot P16
The applicant seeks to divide one parcel into two parcels, to allow for the
construction of two, two family dwellings. A variance has been granted to allow for
reduced lot size.
The site is located at 10506 Combs Avenue and is zoned R3 within the Home Place
Overlay. Filed by Shahpor Shahbahrami.
Shahpor Shahbahrami, 8565 North Central Avenue, Indianapolis appeared before the Commission
representing the applicant. The petitioner would like to divide one parcel into two parcels to allow
for the construction of two, two family dwellings. The property is located within the Home Place
Overlay and is zoned R -3.
Mr. Shahbahrami commented that the proposed dwellings would be complementary to the area.
Members of the public were invited to speak in favor of the petition; no one appeared. Members of
the public were invited to speak in opposition to the petition; the following appeared:
Public Remonstrance /Unfavorable
James Richards, 1140 East 105 Street. To Mr. Richard's knowledge and belief, there is a natural
drain flowing beneath the parcel intended for development; during heavy rains, water flows across
the lot and any structure would bank the water into 4 or 5 existing homes in this area.
Judith Steiner, 1142 East 105 Street, 41 year resident. Existing structure on the property was
built as an income property for an elderly person. Since then, there have been a number of renters;
currently there are as many as five persons occupying the home and three dogs, one of which is a pit
bull. The lot size cannot accommodate two more homes drainage is also a problem.
Rebuttal: Shahpor Shahbahrami said he had looked at the drainage and calculated it for the area.
(Mr. Shahbahrami is also a professional engineer.) The capacity of the pipes is sufficient to
accommodate the runoff and drainage. The area is flat and water does not stand after heavy rains, it
drains from the site.
Department Report, Matt Griffin As stated earlier, this petition does comply with the Ordinance,
however, the petitioner also has applied for a variance to grant the creation of the two lots. There
are no outstanding concerns or issues. The Urban Forester has no issues with the site. The property
is actually within the County for Engineering. This proposal has been before the TAC Committee
and those reports can be made available at the Committee level. The Department is suggesting that
S: PlanC ommis lion /Memorandumo (Meeting/ 2006 2006j uly18MEMO
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
12
this item could have final approval at Committee discretion. The Department is recommending this
item be sent to the Subdivision Committee on August 1, 2006 for further review.
Commission Comments:
Mark Ratterman wanted to confirm that this proposal is actually for one building containing two
units, and will be owner occupied. The drainage issue will have to be approved by the County, not
the City.
Carol Schleif noted that the drawings show two buildings.
Matt Griffin clarified that currently there is one lot with a single- family home on it. The petitioner
intends to split the lot in half —the new, additional lot will have one, double -unit on it. In the end,
there will be a total of three units —two in a double, one existing single. This proposal is a re -plat of
the Little Farms Subdivision.
Mark Rattermann cautioned the petitioner that sometimes there are covenants in existence that
prohibit the splitting of lots such as proposed. If that were the case, even if the Plan Commission
were to approve it, it would not cancel out the covenants and restrictions.
Docket No. 06060006 PP Replat, Little Farms Subdivision Lot P16 was forwarded to the
Subdivision Committee for further review on August 1, 2006.
Mark Rattermann made formal motion to empower the Subdivision Committee to grant final
approval of Docket No. 06060006 PP Replat, seconded by Susan Westermeier, Approved 6 -0.
Note: Petitioner is to bring to Committee a photograph of the existing home as it is today on the lot.
I. Old Business
11. Docket No. 06010008 Z: Midtown Village PUD CONT. TO AUG 15.
The applicant seeks to rezone 18.82 acres from I1/Industrail to PUD for the purpose of
creating mixed use development.
The site is located at 510 Third Avenue SW and is zoned Il/Industrial.
Filed by Lawrence Kemper of Nelson and Frankenberger for Centex Homes.
2I. Docket No. 06030005 PP: Village on the Monon
Docket No. 06030028 SW: SCO Chapter 7.05.07, Woodlands
The applicant seeks to plat 19 lots on 6.29 acres.
The site is located at 1320 Rohrer Road and is zoned Rl Residential
Filed by Kevin Roberts of DeBoy Land Development Services for The Anderson
Corporation.
Jim Anderson, management member of Stuart Anderson LLC, developers of this project, appeared
before the Commission representing the applicant. Also in attendance: Kevin Roberts, DeBoy Land
Development.
The petitioner is seeking primary plat approval as well as a subdivision waiver for the removal of
S: PlanC ommis lion /Memorandumo (Meeting/ 2006 2006j uly18MEMO
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
13
woodlands. The site consists of 19 lots on 6.7 acres and is currently zoned R -1. The project is
designed under the Open Space Ordinance and will be an "empty nester" type of development. The
price of the homes will be $300,000/$400,000 and will be predominantly brick, 1800 to 2300 square
feet in size. The project will be a low- maintenance type development with monthly dues covering the
costs of yard maintenance and snow removal.
The primary amenity for the project is the green space as well as the preservation of the natural setting.
The project is located on the west side of Rohrer Road, just north of the parking lot that serves as a
trailhead for the Monon Trail. The petitioner has committed to several roadway improvements for
Rohrer Road on the west side of the street. Per the Engineering Department, the petitioner is adding a
decel lane and accel/decel blisters; the petitioner will mill and resurface Rohrer Road the entire length
of the property. The petitioner will grant additional right -of -way to provide for 40 feet of half right -of-
way across the entire length of the property.
The project will have a main entrance off of the west side of Rohrer Road at the southern end of the
property. This particular location is at the crest of the hill on Rohrer Road and has a good site line.
The petitioner said he has preserved a great deal of open space, approximately 34% of the entire site.
A tree analysis was done and tree inventory developed. Those are included in the informational
packets.
Department Comments, Matt Griffin: The Department has no outstanding issues with this petition and
approval is recommended as forwarded by the Committee.
Committee Report, Carol Schleif Mostly what the Committee discussed were the trees and the fact
that the lots are much smaller than needed to be for this zoning. The general feeling was to try to save
as much green space as possible. There was a concern that the square footage of the one story building
would put much of the building right at the building line. In general, the target they were shooting for,
even though it is tight, might work. The Committee voted 4 -0 to recommend approval.
In response to questions from Mark Rattermann, Jim Anderson said that lawn and exterior
maintenance will be done by the same entity, the Homeowners Association.
Leo Dierckman made formal motion to approve Docket No. 06030005 PP, Village on the Monon
and Docket No. 06030028 SW, SCO Chapter 7.05.07, Woodlands, seconded by Mark Rattermann,
APPROVED 6 -0.
3I. Docket No. 06040025 DP Amend /ADLS Amend: Parkwood Garage (Liberty
Mutual Group)
The applicant seeks Development Plan Amendment, Commitment Amendment, and
Architectural Design, Lighting, and Signage Amendment approval for 7.81 acres, for
the purpose of constructing a three -story parking garage, replacing some existing
surface parking.
The site is located at 350 East 96 Street and is zoned B6 /Business. The site is
located within the US 31 Corridor Overlay.
Filed by Paul Reis and Blaine Paul for Liberty Mutual and Duke Construction LP.
S: PlanC ommis lion /Memorandumo fMeeting/ 2006 2006j uly18MEMO
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
14
Paul Reis, attorney with Bose McKinney Evans appeared before the Commission representing the
applicant. Also in attendance: Blaine Paul, Chris Chambers, Duke Construction, Ron Dench,
Liberty Mutual.
The Parkwood Garage petition was reviewed by the Special Studies Committee on June 29, 2006;
the first item discussed was the actual need for the additional parking. The Indiana Insurance
Building was originally constructed to serve as a corporate headquarters. However, the use of the
building has transitioned into a data center creating more jobs and requiring more parking. Under
the current Zoning Ordinance, general office use requires 4 parking spaces for every 1,000 square
feet. A calling center requires 6.7 parking spaces for every 1,000 square feet. This parking garage is
being approached as a hybrid of those two uses and would support the parking ratio of 5.6 spaces
per 1,000 square feet.
The number of employees, traffic, planned improvements, and 96 Street were also discussed with
the Committee and the members concluded that the parking was in fact appropriate for the building
and stacking ability for the cars. A revised elevation was presented for the structure as well as
enhanced photographs from I -465 showing the existing trees that are being preserved as well as the
additional trees being added to the landscape plan. The landscape plan has been approved by Scott
Brewer, Urban Forester and Environmental Planner
Revised elevations were distributed showing the decrease in the number of light poles by 50 -from
12 to 6 —and the poles were lowered to 19 feet in order to decrease the visibility of the poles. Those
reductions were both approved and welcomed by the Committee and had a positive on the over all
project. We also discussed light migration and agreed that the reduction in the number and height of
the light poles would help. There is also high intensity lighting along I -465 and a significant distance
from this structure to 96 Street and the homes that are on the other side of 96 Street.
The final issue was discussion and confirmation that the material samples being used in the parking
garage match the building materials used on the existing office building.
The Committee voted 4 -0 to recommend approval of the Development Plan and ADLS as well as the
Commitment Amendment regarding the height of the structure.
Department Report, Matt Griffin: There are no outstanding issues at this time and the Department is
recommending approval.
Committee Report, Leo Dierckmanw There was an issue with the neighborhood to the south and
there are usually some residents in attendance. (namely, Janet Maynard Cox) However, the fact
that there are no neighbors present is a good indicator that they are comfortable with this proposal.
Looking at the elevations from 465, you see trees in place, but not much of the structure.
Paul Reis reported that Steve Granner and Blaine Paul had appeared before the Nora Northside
Community Council and they have given their approval to this proposal.
Jerry Chomanczuk said he had one concern and that is the traffic issue. The entire area leading up to
S: PlanC ommis lion /Memorandumo (Meeting/ 2006 2006j uly18MEMO
ONE CIVIC SQUARE
CARMEL, INDIANA 46032 317/571 -2417
15
Meridian currently has traffic cops directing traffic.
Leo Dierckman responded that there are few lanes heading west on 96 Street to Meridian. As the
road is widened, this will be somewhat alleviated with a left turn lane, right turn lane, and two
straight lanes. The problem currently is that the straight lane is blocked by left turns. The road is in
process of being widened.
Leo Dierckman made formal motion to approve Docket No. 06040025 DP Amend /ADLS Amend,
Parkwood Garage (Liberty Mutual Group) together with the commitment amendment,
seconded by Rick Ripma, APPROVED 6 -0.
There was no further business and the meeting adjourned at 8:50 PM.
Ramona Hancock, Secretary
S: PlanC ommis lion /Memorandumo (Meeting/ 2006 2006j uly18MEMO
ONE CIVIC SQUARE
Jerry Chomanczuk, President