Loading...
HomeMy WebLinkAboutGeorge Harvey/8/Cool Creek Trail/-$54.67 Contract No:R -29657 Change Order No.: 008 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -29657 Letting Date:02/09/2011 District:GREENFIELD DISTRICT AE:Goldner, Rob PE /S:Surber, Rob Status:Draft Change Order Information Change Order No.: 008 EWA: Y or Force Acct: N Date Generated: 00 /00 /0000 Date Approved: 00 /00 /0000 Reason Code: CHANGED COND, Construction Related `O Description: Extra Fence Added Around Utility Gate and Brackets on Bridge 11 Original Contract Amount 583,765.77 Original Change Order Amount -54.67 Percent: -0.009 Total Previous Approved Changes 31,929.88 Percent: 5.470 Total Change To -Date 31,875.21 Percent: 5.461 Modified Contract Amount 615,640.98 Time Extension Information Date Initiated 00 /00 /0000 Date Completed 00 /00 /0000 Original Contract Time SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SP Date 00 /00 /0000 or SP Days (SS Standard Specification, SP Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value Revised Contract Time SS Completion Date 00 /00 /0000 or SS Calendar/Work Days 0 SS Date 00 /00 /0000 or SP Days 0 ;fib,/ tdie Pt) „A., tela i al AV rk e- 60 "I*1 Contract No:R -29657 Change Order No.: 008 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: DDCM: per Change Order) LE 250K-) LE 750K LE 2 M GT 2 M (Days per Contract) (50 SS days 100 SS days 200 SS Days GT 200 SS days) Verbal Approval Required? Y N If Y, by Date Issued Total Change To- Date >5 Y N If Y Copy to Program Budget Manager Scope /Design Recommendation Y N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y N If Y, Date to LPA Date Returned FHWA Signatures Required? Y N If Y, Date to FHWA Date Returned Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -29657 INDIANA Date:12/06/2011 Change Order No:008 Department of Transportation Page: 3 Contract: R -29657 Project: 0600390 State:0600390 Change Order Nbr: 008 Change Order Description: Extra Fence Added Around Utility Gate and Brackets on Bridge Reason Code: CHANGED COND, Construction Related CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change 0016 0600390 0016 205 -06931 TON 100.000 -2.000 C Amount:$ 200.00 Item Description: TEMPORARY CHECK DAM, REVETMENT RIPRAP Supplemental Description1: Supplemental Description2: 0025 0600390 0025 303 -07449 TON 59.450 46.050 C Amount:$ 2,737.67 Item Description: COMPACTED AGGREGATE, NO. 73 Supplemental Descriptionl: Supplemental Description2: 0092 0600390 0092 105 -06807 LS 1,782.000 1.000 C Amount:$ 1,782.00 Item Description: ADDITIONAL Supplemental Descriptionl: Additional fence added at gate for utility access area. Supplemental Description2: 0093 0600390 0093 105 -06807 LS 1,101.000 1.000 C Amount:$ 1,101.00 Item Description: ADDITIONAL Supplemental Descriptionl: Additional brackets for bridge railing on bridge. Supplemental Description2: Total Value for Change Order 008 -54.67 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation Chain Link Fence had to be added in order to place gate at the south end of the Utility access pad. Brackets had to be added to hang the bridge railing on the bridge. Change Order Explanation for Specific Line Item It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor: Signed By: Date: NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -29657 INDIANA Date:12/06/2011 Change Order No:008 Department of Transportation Page: 4 APPROVED FOR LOCAL PUBLIC AGENCY Gtr Y GF,64 /,J .:.,p Let, 8 26// (SIGNATURE) (TITLE) (DATE) (SIGNATURE) (TITLE) (DATE) SUBMITTED FOR CONSIDERATION PENS APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status