HomeMy WebLinkAboutCorrespondenceFROM D HAWLEY
Angie Conn
City of Carmel
317 -571 -2426
Thanks,
Don Hawley
513»0461
PHONE NO. 317 896 1776 Rug. 28 2006 12:30PM P1
Attached is a rough markup of the drawing that you sent me last week, The landscape
people showed up yesterday (Sunday) and planted the items marked planted, Some were
put in the wrong place. As you will note, they already planted three trees where they
were marked delay.
I propose one additional tree to the southeast by the mini barn, Hopefully that would
satisfy the change we have discussed. 1 have also put in a call for Scott Brewer and
maybe you can share this sketch with him before he calls me.
LA 0300
o 4 01-100
2`1 v
One Civic Square
August 23, 2006
Mr. Donald Hawley
16923 Austrian Ct.
Westfield, IN 46074
RE: Carmel Hope Fellowship Church, 14535 Carey Rd, Carmel, IN 46032
Mr. Hawley:
The Depaittiient has administratively approved your request to delay the installation of some of the landscaping
along the south property line for a time limit of 8 years, with the inherent possibility of a church parking
expansion to the south. When the time limit expires, the Church will have to either submit a Special Use
Expansion application for approval of the church parking lot to the south of the subject site or install the
remaining landscaping as shown on the approved landscape plan. The delay in installation of landscaping will
expire on August 23, 2014. This delayed approval is with the understanding that the trees /shrubs along the
south property line, within 55 feet of the west property line are to be installed, and the trees /shrubs within 39 ft
of the east property line, along the south property line are to be installed (see attached site plan). A berm is not
shown on the approved landscape plan.
Also, your request to amend the building footprint is allowed by the Zoning Ordinance, Chapter 21.05; the
special use can be expanded up to 10% of the approved gross floor area without having to reappear before the
Board of Zoning Appeals. Your current proposed building addition shows an approximate expansion of 16
which will require Special Use Amendment approval, if it is not reduced to a 10% expansion. The Department
asks that you provide a copy of the proposed, amended site plan to our Department and to the Fire Department
(Gary Hoyt), to review the new traffic pattern and deletion of the church's drive- thru/drop off area, to make sure
there are no fire truck turnaround issues.
Sincerely,
Angelina Conn
Planning Administrator
Department of Community Services
File: Carmel Hope Fellowship.doc
CC: Scott Brewer, City Forester
Sarah Lillard, Building Code Services
Gary Hoyt, Fire Department
City of Carmel
Carmel, IN 46032 317 -571 -2417
Via email: Hawleyd7 @aol.com
Original via Mail
Conn, Angelina V
From: Conn, Angelina V
Sent: Tuesday, August 22, 2006 9:19 AM
To: Hollibaugh, Mike P
Cc: Brewer, Scott I
Subject: Carmel hope fellowship church landscape plan
Page 1 of 1
Good Morning, Mike:
if you have time today, please stop by my office so I may discuss this with you. Basically the petitioner would like
to delay the installation of most of the landscaping along the north property line for approx 8 -10 yrs, with the
possibility of church parking expansion to the north. The church is at the se corner of 146th st. carey rd. I
thought maybe you could administratively approve this request with the above mentioned time limit, and then
when the time limit expires they would have to bring the special use expansion application or install the remaining
landscaping.
Thank you!
Angie Conn, Planning Administrator
Division of Planning Zoning
Dept. of Community Services
City of Carmel
p. 317- 571 -2417 f. 317- 571 -2426
aconn @carmel.in.gov
8/22/2006
Conn, Angelina V
From: Conn, Angelina V
Sent: Thursday, August 10, 2006 3:02 PM
To: 'Hawleyd7 @aol.com'
Subject: RE: 14525 Carey Road Carmel Hope Fellowship
Mr. Hawley:
Upon further review and per our last conversation on March 3, 2006, the Dept still needs a new site plan
building elevations showing the proposed changes to the building you referred to with the removal of the drive
thru. Also, the Dept. needs the new percentage of lot coverage (pavement building footprints are included)
after that building change drive thru removal. The Dept. will also need the percent of the original approved
site plan that has changed.
Then, the Dept. can review to see if the berm, fe, and landscaping along the south property line of the site
can be amended /removed.
Also, what is the church planning to do with the parcel to the south of this site, since they have a purchase
agreement on it?
Thank you,
Angie Conn, Planning Administrator
Division of Planning Zoning
Dept. of Community Services
City of Carmel
p. 317 -571 -2417 f. 317- 571 -2426
aconn @carmel.in.gov
From: Conn, Angelina V
Sent: Friday, June 30, 2006 11:26 AM
To: 'Hawleyd7 @aol.com'
Subject: RE: 14525 Carey Road Carmel Hope Fellowship
I spoke with the Director and the Department has granted you a 60 -day extension.
Angie Conn, Planning Administrator
Division of Planning Zoning
Dept. of Community Services
City of Carmel
p. 317 571 -2417 f. 317 571 -2426
aconn @carmel.in.gov
From: Hawleyd7 @aol.com [mailto: Hawleyd7 @aol.com]
Sent: Friday, June 30, 2006 10:59 AM
To: Conn, Angelina V
Subject: 14525 Carey Road Carmel Hope Fellowship
Hi Angie,
At long last we finished the concrete work yesterday on the parking lot. There are several things still to be done
and I need to communicate with you regarding those items. If I need an extension of time to complete the total
project, this is my request for approximately 60 days. Following are the items left to be done:
8/18/2006
Page 1 of 2
Conn, Angelina V
From: Conn, Angelina V
Sent: Friday, June 30, 2006 11:26 AM
To: 'Hawleyd7 @aol.com'
Subject: RE: 14525 Carey Road Carmel Hope Fellowship
Angie Conn, Planning Administrator
Division of Planning Zoning
Dept. of Community Services
City of Carmel
p. 317- 571 -2417 f. 317 571 -2426
aconn @carmel.in.gov
From: Hawleyd7 @aol.com [mailto:Hawleyd7 @aol.com]
Sent: Friday, June 30, 2006 10:59 AM
To: Conn, Angelina V
Subject: 14525 Carey Road Carmel Hope Fellowship
Hi Angie,
Thanks,
Dan
6/30/2006
O L( 6)J24 V
I spoke with the Director and the Department has granted you a 60 -day extension.
\v/6V
Stripe parking lot
Remove old asphalt entry
Install parking lot lights poles
Final grade
Plant shrubs and trees as per prints
Please let me know if you have any further questions or if I need to do any other paper work for you.
Page 1 of 1
At long last we finished the concrete work yesterday on the parking lot. There are several things still to be done
and I need to communicate with you regarding those items. If I need an extension of time to complete the total
project, this is my request for approximately 60 days. Following are the items left to be done:
Conn, Angelina V
From: Hawleyd7 @aol.com
Sent: Friday, June 30, 2006 10:59 AM
To: Conn, Angelina V
Subject: 14525 Carey Road Carmel Hope Fellowship
Hi Angie,
Page 1 of 1
At long last we finished the concrete work yesterday on the parking lot. There are several things still to be done
and I need to communicate with you regarding those items. If I need an extension of time to complete the total
project, this is my request for approximately 60 days. Following are the items left to be done:
Please let me know if you have any further questions or if I need to do any other paper work for you.
Thanks,
Dent
6/30/2006
Stripe parking lot
Remove old asphalt entry
Install parking lot lights poles
Final grade
Plant shrubs and trees as per prints
Conn, Angelina V
From: Conn, Angelina V
Sent: Monday, October 17, 2005 12:50 PM
To: 'hawleyd7 @aol.com'
Cc: Hollibaugh, Mike P
Subject: Carmel Hope Fellowship Special Use #04030014 SU)
Mr. Hawley:
Please let this email serve as the official response to your correspondence of October 17, 2005, requesting
additional time to complete Phase II of the project (Carmel Hope Fellowship) at 146th Street Carey Road. The
time extension has been granted to June 30, 2006.
Feel free to contact the Department with any additional questions.
Angie Conn, Planning Administrator
Division of Planning Zoning
Dept. of Community Services
City of Carmel
p. 317- 571 -2417 f. 317- 571 -2426
aconn @carmel.in.gov
10/17/2005
Page 1 of 1
RECEIVED
OCT 1 7 2ci
DOCS
SEVENTH -DAY
ADVENTIS 1
CHURCH
P.O. Box 4671
CARMEL, INDIANA 46082
317 566 -9762
CARMEL HOPE FELLOWSHIP
October 17, 2005
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
Re: Carmel Hope Fellowship
Phase II
14535 Carey Road
To Whom It May Concern:
Due to present circumstances and conditions, we are hereby
requesting an extension of time for the completion of Phase II
of the above project until June 30, 2006.
We plan to have the project completed before that date but request
that time to allow for adverse weather conditions.
Don Hawley
Bldg. Committee Chairman
�j 0 61K SU
October 14, 2005
Mr. Donald N. Hawley
Chair, Building Committee
Carmel Hope Fellowship
P.O. Box 4671
Carmel, IN 46082
RE: Carmel Hope Fellowship Project Review #3
Dear Mr. Hawley:
n, Jr., P.
Assistant Ci Engineer
Department of Engineering
JAMES BRAINARD, MAYOR
EL
cc: Matt Griffin, Department of Community Services
John Duffy, Carmel Utilities
Paul Pace, Carmel Utilities
Paul Arnone, Carmel Utilities
Dave Barnes, Weihe Engineers
Greg Ilko, Crossroad Engineers
IlApps21 user data\engl shared\DHilI PROJREVO41 CARMELHOPEFELLOWSHIP3.doc
CLIOn
„X$
RECEIVED
-J
4Cj 17 2005
DOGS
The City has reviewed your drawings dated September 21, 2005 based upon the City review of May 18,
2004.
Based on additional review, the City provides additional comments:
1. Please remove the landscape plan from the plans submitted to the Department of Engineering for
approval. The Department of Engineering does not approve the landscape plan.
2. Please continue working with Crossroad Engineers to obtain approval of the drainage design.
The City reserves the right to provide additional comments upon further review by the City Engineer and
submission of more detailed construction plans.
These comments represent the Department of Engineering's third review of the construction plans for this
project. We request that all responses to our comments be provided in writing. Failure to provide written
responses may result in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re- submitted,
particularly if any such changes are considered "new" or fall outside of our previous reviews. Please
provide revised plans indicating all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, Special Studies or other committee meetings.
All bonds and performance guarantees (if required) must be posted prior to Engineering Department
approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if
required) must be obtained prior to Engineering Department approval. If you have questions, please
contact me at 571 -2441.
DEPARTMENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAx 317.571.2439
EMAIL engineering @ci.carmel.in.us
May 19, 2004
Carmel Board of Zoning Appeals
1 Civic Square
Cannel, IN
Dear Mr. Weinkauf & Board Members
I am writing this letter to voice my concerns and disapproval about a site that is adjacent
to mine. Carmel-Hope~Fellowihi~Ch~6h,has applied for development variances. This
greatly concerns me for the following reasons:
· Property values. It is zoned R-1 for a reason and I believe that it is in
Carmel's best interest to keep it that way. Please take into consideration
how the board voted against the Veterinarian Clinic that was proposed for
the property adjacent to this one.
· The property size vs. the size of the purposed building and parking area.
· Green space vs. impervious area.
· Drainage runoff for the site and upstream.
I would appreciate it greatly if the board would take these items into consideration.
14445 Carqy Road
Carmel, 46033
31 ~m8~14,. 1~H486033
May20,2004
Dear Board Members,
_TI3~ e following statement reflects my concern regarding the approval of the petition of the
~I-~pe-F~-o~i~-Ch~re~7-It is my understanding that this petition is one that will allow a church
to be built mad a parking lot to be installed on a piece of property on the sou~eastern comer of
Carey Road and East 146th Street. This particular parcel is zoned Residential-1 and has been
recently annexed along with other properties in C219 into Carmel.
The property consists of an existing brick ranch house with a building lot to the south and
another building lot to the north. Why would the City of Carmel cede this land to anything other
than Residential-1 use? It would appear that the best interests of the taxpayers living in the
immediate area would be best served by maintsining the existing home, and the possible
construction of two more homes on the adjacent lots. Those of us who live in C219, with the
exception of the Taylor Trace development, which has its own covenants and protection for its
twelve properties, need to rely on the City Council and the BZA to represent us in a fair and
equitable manner.
This is another instance of the pm-chase of a piece of property under the assumption that a use
variance would be automatically granted. While one might sympathize with the purchaser's
intent, it is not then the responsibility of those who live in the surrounding neighborhood to
sacrifice their property values so as to realize the buyer's goal.
I respectfully request that you deny this petition, and that you vote to maintain this parcel as a
Residential-1 area dedicated to single-family dwellings.
Thank you for your consideration of this matter.
~espeetfully, 4'i
\../Jeanne S. Beebe
May 18, 2004
Mr. Donald N. Hawley
Chair, Building Committee
Carmel Hope Fellowship
P.O. Box 4671
Carmel, IN 46082
CI EL
JAMES BRALNARD, MAYOR
C~I~?~C- ar.~mel:Ho~-Fellowship~Proj eot -R~iew #2
Dear Mr. Hawley:
The City has reviewed your submission for the May 19, 2004 Technical Advisory Committee meeting. The
general comments from the ftrst City review have been repeated in this letter. New comments are bolded
and italicized.
GENERAL INFORMATION
1. The project site is located within current City of Carmel Corporate Limits.
2. Jurisdictions:
·Street and Right of Way- City of Carmel (Carey Road)/Hamilton County (146th Street)
Water - City of Carmel
· Sanitary Sewer - City of Cannel
· Storm Sewer - City of Carmel
3.Board of Public Works and Safety Approval Requirements:
· Water and Sanitary Sewer Availability.
Commercial Curb Cut. The request for Board approval should include 8 ~" x 11" exhibits that
will indicate the proposed curb cuts and all appropriate data and dimensions including width, radii,
etc. Please indicate all existing and opposing driveways and their relationship to the proposed
curb cuts for this development.
· Temporary Construction Entrance. Separate BPWS approval will be required if this entrance is to
be located any:where other the site of the permanent curb cuts.
· Consent to Encroach approvals for any permanent improvement to be installed within dedicated
easements and/or dedicated right of way. If an irrigation system is planned for this project,
additional Water Availability approval will be required from the Board and additional Water
Connection Fees will be due.
· Dedication of Right of Way. Preferred dedication forms are available electronically from this
office.
A schedule for Board of Public Works and Safety meeting dates and agenda deadlines was previously
submitted. Please use the Engineering Department deadlines for submissions to the Board.
Any submission to the Board requires prior final approval by the Carmel Clay Plan Commission
and/or the Board of Zoning Appeals and completion of review by the Technical Advisory Committee.
All written requests to be place on the Board's agenda must include the appropriate Docket Numbers
and the date (or dates.) of approval by the Plan Commission and/or BZA.
4. Water and Sanitary Sewer Availability and Connection Fees:
Water and Sanitary Sewer Availability (acreage) Fees
Water - $1,010.00 per acre
Sanitary Sewer- $1,365.00 per acre
DEEART3dENT OF ENGINEERING
Oa~ C~xqc SQU:X~E, C.~CXIEI, iN 46032 OFVlC~ 317.571.2441 Fax 317.571.2439
r. ona aw ey
May 18, 2004
Page 2 of 4
Total $2,375.00 per acre
5. Water and Sanitary Sewer Connection
Water - $1,310.00 per EDU
Sanitary Sewer - $ 795.00 ncr EDU
Total $2,105.00 per EDU
6. The City requests that all comments and comment letters generated by this office be answered in
writing and be accompanied by a drawing reflecting requested revisions. Final drawings will not
be approved for construction until all issues have been resolved. All Carmel Utility issues must
also be resolved. The design engineer must certify all drawings submitted for final approval. This
office will requke a minimum of five-sets (maximum of seven-sets) of approved drawings afl, er all
issues have been resolved. The drawings will be stamped approved and signed by both the City
Engineer and Director Carmel Utilities. The Developer/Owner will receive one-set which is to be
maintained on the construction site at all times. Carmel Utilities will receive two-sets. Our Public
Works Inspector will receive one-set and one-set will be maintained in the Department of
Engineering. If more than the minimum of five-sets are requested to be approved, the additional
sets (maximum total of two additional) must be submitted with the five required sets.
7. Please he advised that any installation of signs, wails, irrigation systems, etc. within dedicated
easements and/or fight of way will require Consent to Encroach approval.
8. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted dkectly for all
water and sanitary sewer main locations. Please add a note to the drawing that has the contact
information.
9. Cannel Utilities will provide a separate review of this project for water and sanitary sewer issues.
10. The following items were sent with our fzrst review. I will not send additional copies unless
requested:
· Commercial Project Approval Procedures.
· Permit Data, Contacts, etc.
· Commercial Permitting Procedures.
· Current Utility Fee Schedules
BONDING REQUIREMENTS
11. Performance Guarantees/Engineer's Estimates
It does not appear that Performance Guarantees will be required for Phase I. They may be required for
Phase II construction, dependent upon receipt of detailed construction plans.
12. Street Cut/Right o f Way PemaJt and Bonding Requirements
Any work in the dedicated right of way of Carey Road, not included or covered by a Performance
Guarantee, will require a Right of Way Permit and a License and Permit Bond. The bond amount will
be detemfined by the number of instances of work in the right of way ~ $2,000.00 per instance. This
would include any demolition activities. Open pavement cuts in dedicated streets require approval by
our Board of Public Works and Safety. Please contact our Right of Way Manager, Fred Glaser, to
arrange permitting and bonding. Based upon the drawings submitted, it does not appear that permits
will be required for Phase I. Be advised that work in the right of way of 146t~ Street is under the
jurisdiction of the Hamilton County Highway Department.
PROJECT COMMENTS-REMODEL PHASE I
13. Since this was a single-family residence, the conversion to a church site will require the existing
dfiveway/curb cut to be re-approved by our Board of Public Works and Safety as a commemial
curb cut. The City requires that each of the existing street cuts be removed.
14. This conversion will also require Board of Public Works and Safety approval for Water* and
Sanitary Sewer availability.
15.Water and Sanitary Sewer Availability and Connection Fees
· Availability (acreage) Fees
Water, Pamel B* - 0.505 acres ~ $1,010.00/acre = $ 510.00
Sanitary Sewer, Parcel B - 0.505 acres ~ $1.365.00/acre -- $ 689.00
Total Availability Fees, Phase I 0.505 acres @ $2,375.00/acre = $1,199.00
Mr. Donald Hawley
May 18, 2004
Page 3 of 4
· Connection Fees
Connection Fees for Churches are based upon 0.008 EDUs per Sanctuary Seat. The drawing
submitted indieatas 60-occupants for Phase I. If this is incorrect, please advise. Therefore, 60-
seats ~ 0.008 EDUs per seat = 0.48 EDUs.
Water, Parcel B* - 0.48 EDUs ~ $1,310.00/EDU = $ 629.00
Sanitary Sewer. Parcel B - 0.48 EDUs (&. $ 795.00/EDU -- $ 381.00
Total Connection Fees, Phase I 0.48 EDUs ~ $2,105.00/EDU = $1,010.00
*Assuming the building will be connected to Carmel Water.
These fees will be credited with Phase II development.
16. The Carey Road right of way line is not identified or dimensioned on the plans submitted. The
City of Carmel 20-Year Thoroughfare Plan identifies Carey Road as a Collector Thoroughfare
with a fight of way requirement of 80-feet total, 40-feet half. If the existing fight of way for
Parcel B does not meet this requirement, the City will request the dedication of addifional right of
way to satisfy our 20-Year Thoroughfare Plan. The plan submitted does indicate the right of way
for Carey Road. However, unless this will be platted, the right of way must be formally
dedicated through our Board of Public Works and Safety.
17. The City 0f Carmel's Alternative Transportation Plan (ATP) for Carey Road requires the
construction of separated, parallel 10-foot wide asphalt paths. I will defer to our Department of
Community Services to determine if this path conslruction will be required for parcel B or if it
may be deferred to the construction of Phase II. The newplan does not indicate either a sidewalk
or a path in the right of way of Carey Road.
18. Is there demolition planned with Phase I? It appears there is a barn or shed on the proper{y.
19. Parking areas are required to be paved and curbed. It may be possible to obtain an exception,
given the circumstances of this development. I will defer to our Department of Community
Services. The City will allow extruded curbs but does not recommend them.
PROJECT COMMENTS-PHASE II CONSTRUCTION
20. Board of Public Works and Safety commercial curb cut approval will be required for the
abandonment of existing curb cuts and the construction of the new curb cut. Please be advised
that the City will not approve the extension of the entrance median into the right of way of Carey
Road. It appears that this median still encroaches upon the right of way.
21. The City requests the construction of deceleration/acceleratinn lanes and a passing blister on
Carey Road with Phase II construction. This has not been addressed.
22. Additional Water and Sanitary Sewer Availability approval will be required from our Board of
Public Works and Safety.
23. Additional Availability (acreage) and Connection Fees will be assessed with Phase II construction
as follows:
· Availability (acreage) Fees based upon Tract A and Tract C acreage (0.587 + 0.573 = 1.16)
Water, Tract A & B - 1.16 acres @ $1,010.00 per acre = $1,172.00
Sanitary Sewer, Tract A & B - 1.16 acres ~,, $1,365.00 per acre = $1,583.00
Total Availability-Phase II 1.16 acres ~ $2,375.00 per acre = $2,755.00
· Connection Fees
Water and Sanitary Sewer Connection Fees for Phase II construction will be based upon the
seating capacity of the new church. As indicated above, Connection Fees paid with Phase I will
be credited to Phase II.
Please be advised that,~vailability and Connection Fees used in Phase I and Phase II calculations
are based upon current City of Carmel Utility Fees and are not guaranteed to be the City of
Carmel Utility Fees in place when construction commences.
24. The City requires the submission of a drainage plan and drainage calculations with Phase II
construction including plans for storm water detention on site. The City has received the
drainage calculations for the on-site storm water. It is apparent that there is no on-site
detention planned. ~Please provide calculations for the existing pond with confirmation that the
proposed development was included in the sizing of the existing detention facility.
Mr. Donald Hawley
May 18, 2004
Page 4 of 4
25. Please indicate, with the use of flow arrows, how surface storm water run-off will flow
including parking areas and greenway. .also, where is the breakpoint at the entrance?
26. Swales less then 1% slope require a sub-surface drain laid at a stope which matches the slope of
the swale.
27. Is Structure No. 6 able to be constructed? Please provide 6" above the exterior crown ofthe pipe
to the top of tho concrete of the structure.
28. The grading of the eastern parking lot appears to have very shallow slopes. Please ensure that
the contractor is able to construct such fiat slopes.
29. Is the spot grade of 847.2 on the west edge of the western parking lot a bust?
30. A Right of Way Asphalt Paving Section is required. This is for the portion of the new entrance
within the right of way of Carey Road. The required section is l' ofllll surface over $"of SD
base over 7" of compacted #$3 stone.
31. Please indicate the radii of the entrance curbs off Carey Road.
32. ls the existing well to be abandoned?
33. Please detail the tree well noted on the plans. With the apparent grade change at this location, a
retaining wall may be required.
34. ShouM the sanitary service for the future sanctuary be installed now? Is the existing sanitary
service to the existing residential home large enough to accommodate flows from the final
development?
35. Tho northern entrance/exit to the eastern parking lot is less than 24-feet in width. Is it possible
to pull the curb back on the east side?
36. Please label bearings and distances of property lines and all required yards and setbacks.
37. As a general comment, the City will e2qoect more detailed plans for this project, including how
the construction will be phased. The City will also require a standard set of clvil construction
plans including a Title Sheet, Erosion Control, Existing Conditions, Site and Utility Plan, etc.
with a readable scale such as 1" = 50:
The City reserves the right to provide additional comments upon further review by the City Engineer and
submission of more detailed construction plans.
The above comments are based upon the Engineering Department's second review. Please provide our
office with a follow up letter regarding this review and revised plans, indicating all revisions. Third and
subsequent reviews will focus only on detailed cons~uction plans. It is critical that our office be made
aware of all modifications made on the plans being re-submitted, particularly if any such changes are
considered "new" or fall outside of our initial review. If you have questions, please contact Mike McBride
or me at 571-2441.
Dick Hill, Assistant Director
Department of Engineering
cc:
Mike McBride, City Engineer
Gary Duncan, Assism~nt City Engineer
John Duffy, Carmel Utilities
Paul Pace, Carmel Utilities
Jim Haag, Carmel Utilities
Dave Barnes, Weihe Engineers
IMpps21user datalenglshare~I1DHil~PROJREVO41C.~P~I£LHOPEFELLOIFSHIP2.doc
City of Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
Voice (317) 571-2600 Fax (317) 571-2615
Fire Prevention Bureau
Donald N. Hawley
Carmel Hope Fellowship
PO Box 4671
Carmel, IN 46032
RE:-SpeCial Us~ria~me- Carmel Ho-p~F~llb~,ship. Church
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Special Use Variance - Carmel Hope Fellowship Church
and has approved the plans subject to the following:
We are requesting the installation of a Knox box for emergency access. Knox product may be
purchased on-line at www.knoxbox.com.
Please respond to the above noted condition(s) in writing and submit to our off'~ce prior to the
scheduled Technical Advisory Meeting for this project.
Date: May 6, 2004 By: Gary Hoyt, Fire Marshal
Carmel Fire Department
AF~-19-8004 13:5~ FROM:HAMILTON CO HWY DEP 31T?769814
P.881x001
H ILTON COUNTY
HIgHWA ¥ DEPAI T EIYT
April 19, 2004
Mr. Jim Bamhart
Carmel Hope Fellowship
PO Box 4671
Carmel, IN 46082
RE: {~.e,.n'fiM H_~o _p~:Rellow~hip
-Sff~ PI~-~
S of 146m ~treet / E of Carey Road
Clay Township
Dear Mr. Bamhart:
This letter serves to follow up comments from our March 16, 2004 meeting held at the
Hamilton County Highway Department.'
The Highway Department will support the request to reduce the fight of way offset
from 146~h Street from 500' to 250', Therefore, the right of way on Carey Road would
be a 60' half right of way fl~om the Intersection to a point 250' to the south. From that
point to the s~uthem property line the right of way Is
If you have any questions or comments concerning this letter/please feel frae to contact
me at anytime.
Staff Engineer
cc: Jon Doboslewicz
Grog Hoyes
Dave Barnes
G:~U3ERE~,SBt04taC'~4- lg~4ca~melhope,do=
! ?00 South 10a Street Office (3J 7) 773-7770
Noblm~ville, In. 46060 www.eo,hamilton.i~,us Fax (3l'/) 776-98t4
~SvVEENTH'DAY
NTIST
CHURC'H
P.O. Box 4671
CARMEL, INDIANA 46082
317-566-9762
To'
From:
Date:
Re:
CARMEL
HDP F "'"'?
IE ELLOWSHIP ~/4
Members of the Cannel Clay Technical
Advisory Committee
Donald N. Hawley
Carmel Hope Fellowship Church
May 3, 2004
TAC Meeting, May 19, 2004
Enclos. ed please fred copies of the revised site plan ava dimensioned
elevation for the proposed church structure at 146' Street and Carey
Road. Carmel Hope Fellowship Church is on the May 19 meeting
agenda and is seeking the following rulings at the May 24, 2004,
meeting of the Board of Zoning Appeals: a Special Use Variance
(Docket No. 04030014 SD') and three Development Stand.ds
Variances (Docket Nos. 04040028 V, 04040029 V and 04040030 V).
I look forward to meeting with you on May 19t~.
Tin~lle¥, Connie S
From:
Sent:
To:
Cc:
SubJect:
Butler, Angelina V
Monday, April 19, 2004 3:08 PM
Tingley, Connie S
Morrissey, Phyllis (3; Pattyn, Dawn E; Babbitt, Pamela A; Hollibaugh, Mike P; Keeling,
Adrienne M; Kendall, Jeff A; Brewer, Scott I; Hancock, Ramona B; Dobosiewicz, Jon C; Stahl,
Gayle H; Pohlman, Jesse M
UPDATED Docket No. Assignment: (SU,V) Carmel Hope Fellowship Church (04030014 SU
and 04040028 V - 04040030 V)
Connie,
Please print and fax this e-mail to the petitioner identified below and update the file. I have issued the necessary
Docket Number for (SU, V) Carmel }lope Fellowship Chnreh. It will be the following:
Docket No. 04030014 SU
Docket No. 04040028 V
Docket No. 04040029 V
Docket No. 04040030 V
$750.00 + $100*.5acres = $800
$950
$45O
$450
Total Fee: $2,650.00
Carmel Hope Fellowship Church - Special Use
The applicant seeks special use approval for a church.
Docket No. 04030014 SU Ch.7.02.A special uses
The applicant also seeks the following development standards variances:
Docket No. 04040028 V Chapter 7.04.03.A front yard setback
Docket No. 04040029 V Chapter 26.02.08 side yard for church
Docket No. 04040030 V Chapter 7.04.03.F lot coverage
The site is located at the southeast comer of 146th Street and Carcy Road.
The site is zoned R-l/Residence. Filed by Don Hawley of Carmel Hope Fellowship.
Petitioner, please note the following:
1. This Item was on the March 17 agenda and will be on the May 19 agenda of the Technical Advisory
Committee.
2. Mailed and Published Public Notice needs to occur no later than Thursday, April 29, 2004. Published
notice is required within the Indianapolis Star.
3. The Proof of Notice will need to be received by this Department no later than noon, Friday, May 21.
Failure to submit Proof of Notice by this time will result in the tabling of the petition.
4. The Filing Fee and Eight (8) Informational Packets must be delivered to BZA Secretary Connie
Tingley no later than NOON, Friday, May 14. Failure to submit Informational Packets by this time will result
in the automatic tabling of the petition to the Monday, June 28, 2004, agenda of the BZA.
5. This Item will appear on the May 24, 2004 agenda of the Board of Zoning Appeals under Public
Hearings.
6. The petitioner will need to provide a fully filled-out Findings-of-Fact sheets for each petition the night
of the meeting for the Board's use (Sheet 8). On Ballot sheets, only fill out docket number, petitioner, and date
(Sheet 7). Ballot sheets must be collated.
PETITIONER: refer to your instruction sheet for more details and provide the affidavits and filled out
finding of fact sheets for each petition.
Please contact Mr. Hawley at 896-1776 or 513-0461 (Cell) (e-mail: .D.ONALDNHAWLEY1 ~AOL.COM) with
this information. Once the file is updated please return it to ~y office.
NATURAL RESOURCES
PLAN REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville IN 46060
Ph- 317-773-1432 or Email at john-south~iaswcd.org
Project Name-
Location-
C~an~l-H~d~F?~llowship~
15435 Carey Road
Acreage- 2.0 ?
Owner/Developer-
Mr. Donald Hawley
Carmel Hope Fellowship
PO Box 4671
Carmel, IN 46082
Engineer-
Mr. Dave Barnes
Weihe Engineering
10505 N. College Avenue
Indianapolis, IN 46280
Plan Review Date: May 14, 2004
I have reviewed the plans for this project and have the following comments:
· The project as shown will need to comply with Rule 5. A Storm Water Pollution
Prevention Plan will need to be developed. The parking lot is the largest potential source
of pollutants in the stormwater runoff. You may want to start considering how to
mitigate this issue in the design of the parking area. Grass swales, dry swales, inline
stormwater separatom and/or bioretention areas are practices that could be used.
· An NOI must be submitted prior to the start of construction.
Should you have questions concerning these comments, please contact me.
Submitted By:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
Cc~
Jon Dobosiewicz, Carmel DOCS
Greg Hoyes, County Surveyor
File
May 14, 2004
Carmel Hope Fellowship
ATTN: Donald Hawley
P.O. Box 4671
Carmel, IN 46082
VIA F..MAIL - Czrmelhopo~ol.com
Re: Csrmel Hope Fellowship
Dear Mr. Hawley:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's
Office on May 5, 2004 for this project and have $he following commenl~:
1. Thc preposcd projcct falls in the jur~dic~on of the City of Carmel.
2. The developmen~ east oflM$ p~cel cou~tus thc Taylor Tracc Regttlated Drain.
The proposed storm waler outlet for this site will be the pond in Taylor Trace.
The Taylor Trace pond Top of Bank will need to be raised ~o an olevalion of
843.83, to meet thc 2 foot f~cc beard requirement. This can be accomplish will an
e~then berm along the south end of thc pond, Plcasc provide some exlsl~g topo
information for this area and a cross section of the proposed bcrm.
An emergency spillway will need to be established with an elevation of 841.83
(Q100 elevation). Please provide a cross section detail for this spillway and show
emergency routing to an adequate outlet
6. Please provide this office with a copy of a recorded easement agreement across
the common ar~ of Taylor Trace into the pond for tho site outlet pipe,
7. Please include HCSO Standard Details 0-5 (toe anchor) and D-10 (Lake Outlet
Detail) in the construction prints.
Please submit afl Outlet permit to this office for the discharge in~o the Taylor
Trace R.cgulsied Drain. The application is available on our websiie si
htm://www, co~unilton.in.ns, go to Department~, Surveyor, and Drainage
9. Please note the additlonsl comments may be warran~l at a later da~¢.
Should you have any questions, I can be reached at 317-776-8495.
OtcS Hoyes
Plan Rcvicwcr
Cc: Son Dobo-,iewicz - Carmel DOCD
John South- HCSWCD
Sieve Broermann- HCHD
Dick Hill - Carmel Englneerlrig
Dave Barnes- Welhe Engineering
May 5, 2004
Mr. Donald N. Hawley
Chair, Building Committee
Carmel Hope Fellowship
P.O. Box 4671
Carmel, IN 46082
RE: Revised site plan
Game ~pe: F~ellowsl'ilj~ Church}
Dear Mr. Hawley:
I have received and reviewed the information for the above-mentioned
project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
Michael D. Fogarty
Chief of Police
MDF:vb
cc: 1 Dept. of Community Services
1517) 571-2500
A Nationally Accredit~!~[~forcement Agency
.571-2512
H ILTON COUNTY
HIoHWA Y DEPARTA4£NT
May 3, 2004
Mr. Jim Bamhart
Carmel Hope Fellowship
PO Box 4871
Carmel, IN 46082
RE: C ?l Hope. F-eilows ip
"S~'of146~'S~et / E of ~my Road
Clay T~nship
Dear Mr, Barnhart:
This letter serves to follow up comments from a conversation with the Carmel City
Engineer concerning the fight of way along. Carny Road for the above-mentioned project:
TheHi hwa De rtmentwillsu port the request to r~duce tha fight of way offset
g y pa p
from 14§ih Street from 500' to 250'. Therefore, the fight of way on Carey Road would
be a 50' half right of way from the intersection to a point 250' to the south. From that
point to the southern property line the right of way is 40'.
If you have any questions or comments concerning this letter, please feel free to contact
me at anytime.
Sincerely,
St~ff Engineer
Jon DobosiewiCz
Grog Hoyes
Dave Barnes
O:\U$ ERS~B~04te,~04-19-04carmelhope.do~
t?00 ~outl[ 10~' Street Office (319) 773-77/0
Nob_!a_ _villr~la. 46060 .... www~c.o, hamflton.in.u~ .............. Fax (31'7) ?76-98[4
From.'
Sent:
To:
SubJect:
Babbitt, Pamela A
Wednesday, May 05, 2004 12:55 PM
Brewer, Scott I; Butler, Angelina V; Dobosiewicz, Jon C; Hollibaugh, Mike P; Keeling, Adrienne
M; Pattyn, Dawn E
TAC review ?
Carmel Hope Fellowship
p.o. box 4671
TA¢ review ?
contact:
Don Hawley
566-9762
no fax
O City of Carmel
Original hy mail
Mareh l7,2004
Donald Hawley
Cannel Hope Fellowship
Box 4671
Carmel, IN 46082
Co p
1~: Carmel Hope Fellowship (#04030014 SLY)- Special Use Application
Dear Idr. Hawley:
This letter is in response to your Special Use application for Carmel Hope Fellowship. The members at the TAC
meeting, March 17, will make additional comments. Please complete the following items after the other conanents
are made:
1. Provide the off~ial list of adjacent prope~des form the H~milton County Auditor's Office.
2. Provide a copy of the landscape plan approval letter for the whole site from the Urban Forester (Scott
Brewer).
3. Please show/label the road ri~,hts-of-way for Carey Rd end 146th Stteet.
4. Show/label 3$-ft fi:ont yard setbacks. A Varisnce may be needed for the front yard setbacks.
$. Show/label a 2$-ft rear yard/buffer yard setback.
6. Please label the building square footage.
?. Please show/label a 25-i~ side yard setback (per Ch. 26.02.08).
8. Per Chapter 26.04, please comply with Buffer Yard D for the m,mher of plantings required per 100 feet.
9. A Variance from the BZA is required for the temporary/ravel parking lot (Ch. 27.03,01).
10. A Variance from the BZA is required for not having curbed parking (Ch. 27.03.02).
11. A Variance from the BZA may be required for the arched dilve.
12. Please p~-pare dedication of the necessary road rights-of-way.
13. Show the screening ofmech,nleal equipment and dumpster.
14. The existing, unused driveway closest to the intersection of Carey 8:146t should be closed/removed.
15. The maximum building height is 35 feet. Please show dimension of the buildings and steeple on elevations.
16. Please submit proposed signs with dimeasions (per the Sign O~ai,,,~ee, Chapter 25.7), colors, and details.
17. The maximum lot coverage is 35%, including the parking lot. Please show the percent breakdown of
buildings and parking lot square footage vs. the parcel square footage. A Variance may be required.
18. Please provide a location map end submit a legal description.
19. Please file a Special Use appllcaiion, including filled out findings of fact sheets.
I/you have any questions or if ! may be of assistenee please do not hesitate to call
Sincerely,
Angel/aa Buffer
plannln~ Aamlnlstrator
CarmelHopeFellowshipChurch-SU
Page 1
ONE CMC SQUARE
C.,Ait.M~.I., INDIA.-"qA 46032
317/571-2417
5tertian C. Hard, Surveyor $,f~e zs~
'Fl~one ¢5:7) 776'$4~5 One 2iamillvn ¢ouniy 3quare
March 16, 2004
Carmel Hope Fellowship
ATTN: Donald Hawley
P.O. Box 4671
Carmel, 1N 46082
VIA F.-MAIL - Carmelhope~aoLcom
Re: Carmel Hope Fellowship
Dear Mn Hawley:
We have reviewed the Special Use Application zubmitted to the Hamilton County Surveyor's
Office on March 2. 2004 for this project and have the following comments:
1. The proposed project falls in the jurisdiction of the City of Cennel.
A pan of the proposed site drainage does enter (~d is included) in the Taylor
Trace detention ponds, which is par~ of a Hamilton County Regulated Drain
Subdivision.
The proposed project is the convorsion of an existin~ residence into a small place
of worship. The site improvemenU will be limited to some paving of the existing
stone driveway and the addition of approximately 4000 sq. fl. of impervious
surface. Do to the size of thc increase and the surrounding sr~ of srass (pervious
area), no storm water detention will be required at fltis time,
4. No permits will be needed from fi~s office.
5. The Hamilton County Surveyor's Office does not object to the Special Use
Variance.
Any futu~ development (Phase II) or additional impervious surface added to this
site will require a complete dr~$c study to be performed, storm warn- detention
to be provided, and detailed civil drawings to be submitted to this office.
7. The proposed Phase II addition and parking area adds a great deal to the
impervious area on the sito. TI~ size of the parking ar~a will likely require
parking lot inlets and storm sewars to be installed to properly drain the parking
ar~a. This could possibly be detained in the Taylor Trace pond and this office can
provide the drainage calculations when that de~i~n tak~ place.
8. Please note the additional comments may be v~axlmtcd at a latcr dai~.
Should you have any questions, I can be reached at 317-776-1M95.
Sincer~ly,~ ~
Plan Roviowor
Cc: Ion Dobosiowicz- Carmel DOCD
lohn South- HCSWCD
Sieve Bro~mann- HCHD
Dick Hill - Cannel Engineering
NATURAL RESOURCES
PLAN REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9th Street, Noblesville IN 46060
Ph- 317-773-1432 or Email at john-south~iaswcd.org
Project Name-
Carmel Hope Fellowship
Location-
15435 Carey Road
Acreage- 2.0 ?
Owner/Developer-
Mr. Donald Hawley
Carmel Hope Fellowship
PO Box 4671
Cannel, IN 46082
Engineer-
Plan Review Date: March 15, 2004
Soils Information:
MmB2 Miami silt loam, 2 to 6 percent slopes, eroded
This is a moderately well drained soil with a seasonal high water table at 2.0 to 3.5 ft. This soil
is located on rises on till plains; slopes are 2 to 6 percent. The native vegetation is hardwood
forest. The surface layer is silt loam and has moderately low organic matter content (1.0 to 2.0
percent). Permeability is very slow (< 0.06 in/hr) in the most restrictive layer above 60 inches.
Available water capacity is moderate (6.1 inches in the upper 60 inches). The pH of the surface
layer in non-limed areas is 5.1 to 6.5. Droughtiness and water erosion are management concerns
for crop production. This soil is designated potentially highly erodible (class 2) in the Highly
Erodible Land (HEL) classification system.
CrA Crosby silt loam, 0 to 3 percent slopes
This is a somewhat poorly drained soil with a seasonal high water table at 0.5 to 2.0 ft. This soil
is located on rises on till plains; slopes are 0 to 3 percent. The native vegetation is hardwood
forest. The surface layer is silt loam and has moderately low to moderate organic matter content
(1.0 to 3.0 percent). Permeability is very slow (< 0.06 in/hr) in the most restrictive layer above
60 inches. Available water capacity is moderate (6.2 inches in the upper 60 inches). The pH of
the surface layer in non-limed areas is 5.1 to 6.5. Droughtiness and wetness are management
concerns for crop production. This soil responds well to tile drainage; it is designated potentially
highly erodible (class 2) in the Highly Erodible Land (HEL) classification system.
Additional information about soils is available in the "Soil Survey of Hamilton County". The engineer and/or
developer should consider the need for an onsite soils investigation.
I have reviewed the plans for this project and have the following comments:
I have no comments on the phase I project.
The phase II project will need to comply with Rule 5. A storm water Pollution Prevent
Plan will need to be developed. The parking lot is the largest potential source of
pollutants in the stormwater runoff. You may want to start considering how to mitigate
this issue in the design of the parking area. Grass swales or bio retention areas are two
practices that could be used.
Should you have questions concerning these comments, please contact me.
Submitted By:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
Cc~
Jon Dobosiewicz, Carmel DOCS
Greg Hoyes, County Surveyor
File
March 11, 2004
Mr. Donald N. Hawley
Chair, Building Committee
Carmel Hope Fellowship
P.O. Box 4671
Carmel, IN 46082
RE: Camel Hope Fellowship Addition
Dear Mr. Hawley:
I have received and reViewed the information for the above-mentioned
project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
~~o2Respectfull~
Acting Chief of Police
TJG:vb
cc: Dept. of Community Services
(517) 571-2509
A Nationally Accredit forcement Agency
Fax (517) $71-2512
Donald N. Hawley
Carmel Hope Fellowship
PO Box 4671
Carmel, IN 46032
City of Carmel
Fire Department Headquarters
2 CiViC SQUARE
CARMEL, INDIANA 46032
Voice (317) 571-2600 Fax (317) 571-2615
Fire Prevention Bureau
RE: Special use - temporary church facility
LETTER OF APPROVAL
The undersigned has reviewed the proposed plans for
Special use - temporary church facility
and has approved the plans subject to the following:
1. Will a fire alarm system be installed in the temporary facility?
2. Does the existing facility have a basement?
We are requesting the installation of a Knox box for emergency access, Knox product may be
purchased on-line at www.knoxbox,com.
Please respond to the above noted condition(s) in writing and submit to our office prior to the
scheduled Technical Advisory Meeting for this project.
Date: March 11,2004
By: Gary Hoyt, Fire Marshal
Carmel Fire Department
HAMILTON COUNTY
HIGHI, VA Y DEPAN.
Mardn 6, 2004
Mr. Donald N. Hawley
Carmel Hope Fellowship
PO Box 4671
Camlel, IN 46082
RE:
Cannel Hope Fellowship
Site Plans
S of 146~ Street/E of Carny
Clay Township
Deer Mr. Hawley
This latter serves to acknowledge receipt of a transmittal received 03/02/04 containing
the plans for the above-menttoned project. After reviewing the plans the Highway
Department has the following comments:
1. In accordance wtth the Hamilton County Thoroughfare Plan, the Highway
Department requests the dedication additional dght of way at the Intersection of 148th
Street and Carey Road. On Carny Road, the right of way from the Intersection to a~
,point:500' ~to-the ~outh. Ls.a eot h~alf. From that point to the southern property line the I
rlght:ef~:ls:40': Oh 1;48m S~'eelL the right of way from the intersection to a pol~.t .~
5~00t to the_east is.anS~-half; From that point to the eastom property fine the rtght of\
~a~:ls=~ 7S':half:A:t~l;=;ngular:c[-d Is also naeded at the intersection, ~con~ng the ._~
right of way for the perimeter streets. The triangle shOUld consist of twoS0'-Iega.
2, Any utility work to be performed within the right of way of 148~h 8treat will need to be
permitted through the Hamilton County Highway Department. Permits associated
wtth the entrance eo~struclion and Carey road must be obtained from the City of
If you have any questions or comments concerning thts m~tar, pease feel free to oontact
ma at anytime.
Sincerely,
Stovse J. Broennann
Staff Engineer
cc: Jori Doboslawlcz
Greg Hoyes
G:~USER~SB~4ta~oa.oB.o~anne~ope.doo
!'700 $ou~ 10e Street
Nobles',,Jlle~ la. 4~0~0
wv,~.to.hal[nl}t~ n,in,u~
ofr~ (al 7) "r73.777o
P.O. Box 4671
CAI!MEL, INDIANA 46082
317-566-9762
CARMEL HOPE FELLOWSHIP
Carmel Hope Fellowship
PO Box 4671
Carmel, IN 46082
February 29, 2004
Carmel Clay Technical Advisory Committee
for Project Review
C/O Carmel Department of Community Services
One Civic Square
Cannel, IN 46032
To Whom It May Concern:
The Carmel Hope Fellowship is filing an Application for Special Use to the
City of Carrnel for our property at 14535 Carey Road, Carmel IN, 46082.
In preparation for the TAC Committee meeting on March 17, 2004, we have
enclosed copies of the proposed site plan and the elevation for your review.
We are also enclosing copies of the design release from the State of Indiana
for the remodel of the existing structure and pages 1.0 and 2.0 of the remodel
drawings for your information.
You will note that the enclosed documents indicate that we are proposing to
remodel the existing building as a temporary place of worship tmtil we
complete Phase II of our plans.
If you have any questions, please feel free to call me at any time. I can be
reached at 317-896-1776.
Thank you for your time and consideration. I look forward to meeting you on
March 17.
Donald!N. Hawley
eflfa24-7@sema.state.th.us, Or VISIT OUR WEB SITE AT www,al.org/sema/osbc.html.
Indiana Department of Fire and
Building Services
PLAN REVIEW DIVISION
Office of the State Building Commissioner
402 W. Washington St., Room E245
Indianapolis, Indiana 46204
CONSTRUCTION DESIGN RELEASE
State Form 41191 (R9/5-98)
Report Printed on: Februaqt 17, 2004
Available At Your Local Licence Branch
Fo: Owner / Architect I Engineer SUPPORT HOOSIER SAFETY
IN ASSN OF SEVENTH DAY ADVENT Indiana State Emergency
DONALD N HAWLEY
15250 N MERIDIAN ST
P O BOX 1950
CARMEL IN 46032
Fax I e-mail 3175719281,
Manangement
Department
of Fire and Building
Services
Public Safety and Training
Institute
Project number
300085
Construction type
V-B
Scope of release
ARCH ELEC MECH
Release date
02/17/04
Occupancy classif!cation
A-3, REM
Type of release
Standard
Project name
CARMEL HOPE FELLOWSHIP
Street address
14535 CAREY RD
City
CARMEL
County
HAMILTON
The plans, specifications and application submitted for the above referenced project have bee. leviewed for compliance witil gte applicable rules of the
Fire Prevention and Building Safety Commission. The project is released for construction subject to, but not necessarily limited to, Ihe conditions listed
below. THIS IS NOT A BUILDING PERMIT. All required local permits and licenses must be obtained prior to beginning construction work.
All construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications must be tiled
with and released by this Office before any work is altered. This release may be suspended or revoked if it is determir~d to be issued in error, in
violation of any roles of the Commission or if it is based on incorrect or insufficient information. This release shall expire by limitation, and become null
and void, if the work authorized is not commenced within one (1) year from the above date.
CONDITIONS:
Note :tAlA & A1B): In accordance with the affidavit sworn under penalties of pedury in the application for construction design release the plans
and specifications tiled in conjunction with this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety
Commission. Providing false information constitutes an act of perjury, which is a Class D felony punishable by a pdson term and a fine up to $10,000.
In accordance with Section 19 of the General Administrative Rules {675 lAC 12-6-19) a complete set of plans and specifications that conform
exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a
copy of the design release.
3B
THIS PROJECT HAS BEEN REVIEWED UNDER THE 2003 INDIANA BUILDING CODE.
A1 No Conditions.
Please be advised that if an administrative review of this action is desired, a wd~ten petition for review must be flied at the above address with the Fire
Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above -stated
date, unless the eighteenth day falls on a Saturday, a Sunday, e legal holiday under State statute, or a day in which the Department of Fire and
Buildieg Services is dosed during normal business hours. In the latter case, the tiling deadline will be the first working day therealter. If you choose to
petition, and the before-mentioned procedures are followed, your petition for review will be granted, and an administrative pmceedieg will be
conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will be
final, and you must comply with its requirements.
Filed by
Code review official
FRED BENNETT
JAddress (name,title of local official,street,city,state and ZIP code
DEPT OF COMMUNITY SERVICES
JEFF KENDALL
ONE C~VIC SQUARE
CARMEL, IN 46032
l Fax / ~-mail 3175712426,jkendall@ci.carmeLin.us
State Fire Marshal
Page tll