Loading...
HomeMy WebLinkAboutCorrespondenceTl~ plttn bat not bam rg~tn~l far loa~ tta~ ar ft~ral perrnit~ that may be ~ to ~ ~ ~ pr~j~..t. ~ddi~t~ ~ Indm~ d~gn calcul~ion~ mayt be r~f~zl~d to furt~r ~,ma~ #~ ~rar~'m~ City of Carmel ~'~ DEPARTMENT OF ENGINEERING March 12, 1999 Mr. Jim White Quadrant Development 445 Gradle Drive Carmel, IN 46032 RE: Foster Estates, Section 4 Dear Jim: The Engiatering Department has reviewed the plans for the above meutioned development, and we offer the following comments: 1. Based on our previous discussions regarding dtis development, we would ask that the detansion area behint~ iots 281-292 be labeled as a drainage, utility, mid detension easement 2. Please relocate all curb castings away from lmndicap rmnps. (Stephanie Street & Thomas Lane intersection) 3. We would suggest a single mn of subsurface drains along the rear lot lines within the detension area. 4. All existing storm sewers in this section will need to be inspected prior to construction. 5. The designed pipe slopes near structures 605 (8.54%) and 606 (12.59%) need to be reduced so that pipe velocities do not exceed 10 fps. 6. Entrance plans need to clearly identify sections of pavement to remain, and those to be removed. 7. All necessa~ bonds must be posted prior to recording the secondary plat for this section. If you lmve any additional questions, please feel free to contact our office at 571~2441. Sincerely, (~ Assistant City Engineer Cc: Kate Boyle-Wecse, City Engineer Ditek _Hill, De_pamnent .of~Engineefing ..... ~ Monr~,__Department of Community-Sen, ic_e.s John Duffy, Cannel Utilities ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2441 'H_AMILTON COUNTY: 925 Oivis on Soil & Water Noblesville, IN 46060-2744  Ph. (317) 773-1432 Fax (317) 776-1101 Drainage, Erosion and Sediment Control Plan Technical Review and Comment qq.-~ F:~,q~DL£ DFIOg_ Project Name: Submitted By: Reviewed By.' Plan Review Procedure: Site Visit Date: Location: /a~.5 Z'~/~ ~'..$ Legal Description: ,.~ Township: Plan Review Date: Range: 6/ZE' Civil Township: ~Z~ F The technical review and comments are intended to evaluate the completeness of the erosion and sediment control olan for the projec~ The erosion and sediment control plan submitted was not revim~ed for the adequacy of the : engineering design. ,~llpractices included in the plan, as well as those recommet,ded in the comments should be evaluated as to their feasibility by a qualified individual with structural practices designed by a qualified engineer. The plan has not been reviewed for local, state or federal permits that may be required to proceed with this project..4dditional information, including design calculations may be requested to furthar evaluate the erosion sediment aontrol platr and sediment conlzol plan has been reviewed and it has been determined that the plan: FI Satisfies the minimum requirements and intent of 327IAC 15-5 (Rule 5). Notification will be fonvarded to the Indiana Department of Environmental Management. Refer to the comments section for additional information. Does not satisfy the minimum requirements and intent of 3271AC 15-5 (Rule 5); deficiencies are noted in the checklist and in the comments section. Deficiencies constitute potential violation of the role and must be adequately addressed for compliance. The information necessary to satisfy the deficiencies must be submitted: . Please address revisions to the reviewer. Proper implementation of the erosion and sediment control plan and inspections of the construction site by die developer or a representative are necessary to minimize off-site sedimentation. The developer should be aware that unforeseen construction activities and weather conditions may effect the performance of a practice or the erosion and sediment control plan. The plan must be a flexible document, with provisions to modify or substitute practices a~ necessary. · Proje~t: EROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW COMMENTS Page 3 of .~ Note: .411 erosion and sediment control measures shown on th.e plans and referenced in this review must meet the de$ign criteria, sta, n. dards, and specifications outlined in the Indiana Handbook for Erosion Control in Dev¢lo. oingAreas fromthelndianaDepartmentofNaturaIResources, Divisionof$oilConservationorMmilar Guidance Documents. $oE & ~aa~r Pb. p~9 r;3-1432 Pm~ submraed B~. not sa~ ~ m~mn mqu~t~ and intern et'3271AC 1 ~'~ OLulc $); def'~ncim am nord in d~:~dtst and in t~ commen~s section, Deficiencies c~msti~u~ p~m~dal violtflon of~e mb an~ must . Pkn~e ~ ~vi~io~ m ~hz reviewer. IW ri 2~' DRAINAGE, AND GENERAL SiTE FEATORE~ Yes NO · 0 3B I 0 No EROSION AND ~DI~SfgNT COb ~-~OL MEASUR~ 4A Sequence of Whm Ead~ Measur~ Wilt Be tmp~ (,~,r/~ M F-m~ i~b~b/nW.4m~A*/~/~) 0 0 0 I City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 3171571°2600 The Schneider Corporation Attn. Keith Lash, P.E. 12726 Hamilton Crossing Blvd. Carmel, Indiana 46032-5422 RE: FOSTER ESTATES, SECTION FOUR LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Foster Estates, Section Four and has approved the plans subject to the following: 1. After review of this project, I have no additional requirements to be met at this time. Date:_January 29, 1999 By: Stanley Puekett, Fire Marshal Carmel Fire Department ~i~ Pr~ention Saves Lives and Pmp~n7 Ianuav.¢ 29, !~)9 Mt. Keith Lash 'lhe Schneider Coq:oration 12726 Hamilton Crossing Blvd. CarmeL, IN 46032-5422 Consm~ction Plan Review Foster E~tn~ Subdivision, S~:tion 4 //outh of 146th Slreet I East of U.S. 31 City of Cnnnel D~r Keith: This letter serves to admowledge receipt of a revised set ofconstructlon plans for Fosm' E~lat~ Subclividon, Section 4. It has bee~ noted that all commen~ with the exception of item #t from my January 19, 1999 has been addressed, Although om' deparhn~nt umlmstands Thc Schneider ~ronp & Quadrant's position in reference to flae la~mplng mound, the Highway Departmenlt will require the entire moUnd to be removed from the 60' half right of way in onler to remain e. onsistent witch the pastjudgemanLs and requirements which have been implemenled upon cntu~ developer's throughout Hamilton County. Therefore, we; kindly ask that the r. onsl~o1|en plans be revised Ito reJocate the entire landscaping moa_nd outside of the rJgla of way. Upon completion of this item, the Highway Department will recommend apptovat of your censtra~tion pimps to the Cannel Plan Commlaslen~ Thank you for your at~nlion and cooperation. Should you have any questions, pl~mse feel free to contact at 773-7770. Sincerely, Maxk H, McCullec& 01-29-99.b lira Ne. al Madr Monroe . Steve 1717 PLEASANT STREET NOBLESVILLIc, INDIANA 460~0 Sc hndder ~2726 ]Hamilton Crossing Blvd. Carmel, IN 46032-5422 317-574-3797 phone 317-57473?99 fax January 22, 1999 Mark Monroe Department of Community Services One Civic Square Cannel, IN 46032 RE: Foster Estates Section Four Dear Mark: Please find enclosed the following materials for the above referenced project that were requested in your letter dated December 31, 1998: 1. Report describing the utilities servicing the site. 2. Covenants and Restrictions for this section (Sheet 6 and 7 of the revised Secondary Plat). 3. Revised construction plans with fire hydrant locations per the Carmel Fire Department. 4. Entrance and 146~h Street frontage landscape plan (submitted at TAC). 5. Various letters from TAC members along with response letters. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~eith~Lash, P.E. Project Manager Enclosure \\SEC_CARMEL'ff) ATA~IOB S\610\002\docsXmonroe2.doc Foster Estates Section Four The following is a report describing the water, sanitary systems, and drainage on the above referenced project: 1. Water System Water to each of the 40 lots will be provided by the City of Carmel Utility Department. This service will be provided from the existing 10 inch main along the south side of the proposed Jason Street which connects thc water distribution systems of sections one and three. There is also an existing 8 inch main on the south side of Stephanie Street at its existing eastern limits stubbing from section one. Thc proposed water distribution system includes extending 8 inch mains through the proposed section connecting to both existing systems. 2. Sanitary System The sanitary effluent for the site will be accepted and treated by the City of Carrnel. There are two existing 8 inch sanitary mains that will be connected to and extended into the proposed section that will provided service to all 40 lots. One of the existing 8 inch mains is located at the existing eastern limits of Stephanie Street stubbing from section one and the other is located at the northwest corner of the proposed section that was also stubbed from section one. 3. Storm Sy~em The rainfall runoff generated from this section will be collected by various proposed storm sewer systems that all ultimately connect to an existing 36 inch storm sewer that runs from the southeast portion of the section to the northwest portion of the section. This storm sewer system was constructed during section two and was designed at that time to handle the runoff generated by this portion of the development. Schneider Corporation January22;1999 John South, P.E. Hamilton County Soil & Water Conservation District 925 Division Street Noblesville, IN 46060 RE: Foster Estates Section Four Dear John: We have received your letter dated January 7, 1999 which was a review of the construction plans and secondary plat for the above referenced project. I have addressed each of your items individually with a numbering system consistent to your comment letter. 1. The plans are not intended to reflect a swale along the rear of lots 296 and 297, these lots are intended to drain from back to front. 2. The plans are not proposing a dry detention facility in the rear of lots 281-283. 3. Please see the revised construction sequence that takes into account your comments. 4. Please see the revised erosion control plan, sheet C 102, which has been modified to show a slotted riser with a silt basin at each of the existing beehive inlets. A construction detail of this stotted riser has been added to sheet C103. Also, please see the revised notes regarding the site specific sequence which has been modified to include a note specifying the timing of the berm construction along 146'h Street. 5. Please see the revised erosion control plan, sheet C 102, which shows a slotted riser with a silt basin. I believe the silt basin surrounding the structures will address your request for additional silt traps at both of these locations. 6. Please see the revised erosion control notes for home builders on sheet C 103. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION Project Manager Enclosure \\SEC_CARMEL~DATAU'OBS\610~002\does~southresp.do¢ The Schneider Corporation January 22, 1999 Stan Puckett Fire Marshall City of Carmel Fire Department 2 Civic Square Carmel, IN 46032 RE: Foster'Estates Section Four Dear Stan: We have received your letter dated December 29, 1998 which was a review of the construction plans and secondary plat for the above referenced project. I have addressed each of your items individually with a numbering system consistent to your comment letter. 1. Please see the revised water distribution plan, sheet C701, which shows the fire hydrant that was previously located on lot 296 to be placed between lots 286 and 287. 2, Please see the revised water distribution plan, sheet C701, which shows a fire hydrant on the comer of lot 299. 3. Please see the revised water distribution plan, sheet C701, which shows a fire hydrant between lots 264 and 265 Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION By: ~Ch,'~P.E. Project Manager Enclosure \\SEC_CARM EL~DATA\ J OB S\ 610\002\docs\fireresp.do¢ Schndder Corporation January 22, 1999 Paul Amone City of Carmel Water-Wastewater Utilities 130 1st Avenue Southwest Carmel, IN 46032 RE: Foster Estates Section Four Dear Paul: We have received your letter dated January 15, 1999 which was a review of the construction plans and secondary plat for the above referenced project. I have addressed each of your items individually with a numbering system consistent to your comment letter. 1. Please see the revised sheet C701 which shows the water main connection to the existing main along 146th Street. 2. Please see the revised sheet C701 which shows the S" valve as requested. 3. Please see the revised sheet C701 which shows the 8" valve as requested. 4. Please see the revised sheet C701 which shows the S" valves as requested. 5. Please see the revised sheet C702 which has a note below the fire hydrant assembly detail regarding the hydrant valves being banded to the tee. 6. Please see the revised sheet C701 which shows the revised water main tap as requested. 7. Please see the revised sheet C701 which shows the revised water main tap as requested. 8. Please see the revised sheet C701 which shows the revised water main tap as requested. 9. Please.forward a copy of the new water meter specification to me once they are in affect. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION By: ~Z/,~~ 5'Keith Lash, P.E. Project Manager Enclosure \\SEC_CARMEL\DATAklOBS\610\002\docs\utilresp. do¢ The Schneider COrporation January 22, 1999 Mark McCulloch Hamilton County Highway Department 1717 Pleasant Street Noblesville, IN 46060 RE: Foster Estates Section Four Dear Mark: We have received your letter dated January 19, 1999 which was a review of the construction plans and secondary plat for the above referenced project, l have addressed each of your items individually with a numbering system consistent to your comment letter. Construction Plans 1. Please recall from TAC that the contour lines shown on the development plan represent a landscape mound and not a detention facility. In an effort to easy your concerns regarding the mound being within the right-of-way, I have enclosed a cross section showing the relationship of the mound to the right-of-way. Please notice that the mound is not substantially within the right-of-way and is only approximately 2.5 feet high at the right-of-way line. 2. Please see the revised sheet C101 which shows the roadside swale with grades. 3. Please recall from TAC that this storm sewer will be utilized by the County to drain 146~ Street when it is upgraded and therefore should remain within the right-of-way. 4. Please verify with your records that a permit was not obtained. If one was not obtained I will forward your request to Quadrant Development. 5. Upon receiving approval of these plans from your office, we will forward a set to Paul I. Cripe, Inc. to be utilizing in designing 146a Street. Secondar~ Plat 1. Please see the revised Secondary Plat which contains the right-of-way chamfers as requested. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCItNEIDER CORPORATION By: as Project Manager Enclosure \\SEC_CARMEL\DATAUOBS\610\002\docs\hwytegp.doc Schneider Corporation January 22, 1999 Dick Hill Department of Engineering City of Carmel One Civic Square Carmel, IN 46032 RE: Foster Estates Section Four Dear Dick: We have received your letter dated January 12, 1999 which was a review of the construction plans and secondary plat for the above referenced project. I have addressed each of your items individually with a numbering system consistent to your comment letter. Storm Sewers/Drainage 1. A meeting has been setup with Kate Boyle regarding this issue as requested at TAC. 2. Please review the Plan and Profile sheets which have the existing structures, casting elevations, casting types labeled. 3. The existing storm sewer system was installed during Section Two to give an outlet from that section. 4. This item was approved by the Hamilton County Commissioners during the negotiation for additional right-of-way of 146~ Street. 5. Please find enclosed the requested drainage calculations. 6. Please review the new prints which are darker than the other set and are more legible. 7. Lot 263 has a larger easement in the rear yard due to the small ravine that is located across the rear of the lot. The easement assures that the drainage of lot 264, which drains partially through the ravine, is not disrupted in the futnre. Please see the revised Secondary Plat which contains rear yard easements on lots 290 and 291. As with all developments, the potential purchasers will be given the Plat and the Covenant and Restrictions to review prior to making the determination to purchase a lot. 10. Please see the revised sheet C 101 showing the handicap ramp / curb inlet conflicts being resolved. 11. Please note that the lots with window/walk out designation are not facing a detention facility. 12. The nopad lots are those lots that are in the wooded areas. Sanitary Sewers 1. Please see the revised plan and profile sheets with the existing structures labeled as existing. 1. Design requirements for the street centerline profiles were obtained from the AASHTO - Geometric Design of Highways and Streets. 2. Please see the development plan for the existing portion of the entrance. The existing curbs and pavement is designated by the linetype and thickness. 3. Please see sheet C301 for the entrance detail 4. We acknowledge that the northern 60 fee~ of the entrance is in the Hamilton County Highways jurisdiction. All Other 1. We acknowledge that Carmel Utility department is also reviewing the sanitary sewer sytems and the water distribution plans. 2. The developer is aware of the availability fees for the development. 3. We acknowledge that the Sewer and Water Availability must be approve by the Board of Public Works and Safety. 4. We acknowledge that the Secondary Plat must be approved prior to submission to the Board of Public Works and Safety. 5. We acknowledge that the IDEM application will not be signed prior to the Board of Public Works and Safety approval of availability. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, TIlE SCHNEIDER CORPORATION 't'~'~th Lash, P.E. Project Manager Enclosure \\SEC_CARMEL\DATA~IOBS\610\002\docs\engresp,doc January 19, 1999 Mr. Keith Lash The Schneider Corporation 3020 North Post Road Indianapolis, [Iq 46226. RE: Foster Estates, Section 4 South of 146th Street / East of U.S. 31 City of Carmel Dear Mr. Lash: This letter serves to acknowledge receipt of a submittal containing the construction plans and plat for Foster Estates Subdivision, Section 4. All interior right of way lies within the jurisdiction of Carmel, while 146th Street right of way is controlled by Hamilton County through an inter-local agreement. ARer reviewing the plans and plat, the Highway Department has the following comments: Construction Plans l) Please relocate the proposed detention pond outside of the 60' half right of way of 146th Street. This is necessary in order to provide futura expansion to 146th Street. 2) Please provide centerline elevations for the road side swale along 146th Street. For public safety reasons, please verify that both side slopes do not exceed 4:1 and the depth does not exceed 3' 6". We also ask that flow lines be provided on Sheet C101. 3) Please relocate the proposed storm sewer lines and structures outside of the 60' half right of way of 146th Street since it will conflict with any expansion to 146th Street 4) It has been noticed that the entrance to this section has already been constructed. If the petitioner for this development did not obtain a public road approach permit for this entrance, he will be required to do so before any construction begins for Section 4. Please contact Mr. Ron Lantzer of our department for further details. 5) Once revisions have been made to the construction plans, please deliver a set to Mr. Phil Kuntz of Paul I. Cripe, Inc. Paul Cripe was chosen as our departments design consultant for 146th Street. Secondary Plat 1) Please provide right of way chamfers at the entrance of 146th Street and Stephanie Street. This should be in the shape of a triangle with two 35' legs. 1717 PLEASANT STREET NOBLESVILLE, INDIANA 46060 (317) 773-7770 At this time, the Highw&y Department has no further comments. Once these items hax3e been addressed, p:lease deliver a revised set ol'the construction plans to my attention ,%r review. Please bear in mind that further comments and requirements may be necessary. Should you have any questions, please feel fi'ee to contact me at 773-7770: Thank you for your attention and cooperation. Sincerely, Mark H. McCulloch Staff Engineer 0149~99.a cc: lim Neal Ron Lantzer Mark Monroe Steve Cash John South Dick Hill CITY OF CARMEL ,VATER-WASTEWATER UTILITIES 130 1ST AVE. SW · CARMEL, ]NDIAN~. 4603~ (317) 571-2648 · FAX (317) 571-2652 Jaanaty15,1999 KeithLash The Schneidercorpomfion 12726Hmn~ltonCrnsfingBlvd. Carmel, Indiana46032-5422 Re: Foster Estates Section 4 DearMr~Lash, We have re'v4ewed the plans for Foster Estates Section 4 and have the following comments: 1 ) We will require the proposed water main to be connected to the existing main on 146~h Street. We also would like to see a fire hydrant placed on the comer of t46t~ Street and Stephnnie Street. 2) At file intersection of Stephanie Street and Ma~k Drive, there will need to be an 8" valve installed controlling west. 3) At file imerseetinn of Jason Street and Mark Drive, there will need to be an 8" valve installed controlling north. 4) At the intersection of Stepharde Street and Jason Street, two 8" valves will need to be installed. One controlling north and the other controlling south. 5) All hydrant valves are to be banded to the Tee. 6) Water main tap on Jason Street for the main on Mark Drive - The tap should be on the ,,vest side of Mark street to avoid the 90-degree bend and the street crossing. 7) Water main tap from Stephanie Street for the main on Mark Drive - Tlie ~ap should be made so the main is sWaight, to avoid the angle. 8) Water main tap fi.om Jason Street for the main running no~th on Stephanie Street - The tap should be made so the main is straight, to avoid the angle. 9) New water meter pit specifications go into effect this year. Actual specifications are being drawn up and will be distributed. Sanitary Sewer: 1) OK at this time. Please feel free to call with any questions. Thank you. Sincerely, Water Distribution and Sewer Collection Office Manager cc: Paul Pace, Water Distribution Supervisor City of Carmel DEPARTMENT OF ENGINEERING January 12, 1999 Mr. Keith Lash, P.E. The Schneider Co~poration 12726 Hamilton Crossing Boulevard Carmel, IN 46032 RE: Project Review, Foster Estates Section 4 Dear Mr. Lash: This office has reviewed the preliminary construction plane for Foster Estates, Section 4, which were received on December 21, 1998. We offer the following comments resulting from this review: STORM SEWERS/DRAINAGE · Is storm water detention being provided for this section? · On the Development Plan and on Hah and Profile Sheets, identify/label all slructures/pipes tlmt are existing as existing. Also include the first existing offsite structure and run of pipe that is associated with proposed Section 4. Show existing TCgnverts on plan and profiles. · When and why are there so many existing pipes/structures in this section? · It appears as if existing/proposed pipe/structures are located directly under the proposed fence and columns along 146~ Street. Is this correct? If so, t.his condition would not be acceptable. · Provide Drainage Calcs including Storm Sewer spread sheets. · Cannot read or distinguish contour lines on the Development Plan (Sheet CI01). Please provide a plan with darker contour lines and elevations. · Why doesn't the rear yard easement for Lot 263 match the easement for lot 2647 · Why aren't there rear yard easements for lots 290 and 2917 · Will potential purchasers of lots be made aware, by covenants or otherwise, of easements on their lot, particularly those lots with easements of larger dimensions and will the purchaser be made aware of restrictions associated with said easements? · Move inlets from the handicap ramps. · This office does not recommend window/walk out lots facing wet or dry detention areas. · What determines the designation of no pad lots? SANITARY SEWERS · Identify/label existing sanitary structures/pipes on the development plan and on Plan and Profiles. STREETS · What are road design standards regarding sag and crest where there are abrupt and drastic changes in grade? · Show existing portion of entrance as existing on the Development Plan. * Show delail of entrance on Sheet C301 including median details, pavement widths on either side of the median, etc. · That portion of the entrance within the 60-foot half right-of-way line of 146~' Street is Hamilton County Highway jurisdiction. ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2441 ALL OTHER * Additional review of Sanitary Sewer and Water Plans and details to be by our Utility Depai-tment under separate cover. · Based upon the platted acreage, the Availability (acreage) Fees for this development would be: Water - 26.5 A {~ $1,010.00 per acre = $26,765.00 Sanitary - 26.5 A ~ $1,365.00 per acre = $36,172.00 $62,937.50 · Sewer and Water Availability approval reqaired from our Board of Public Works and Safety. * Plan Commission approval required prior to Board of Public Works and Safety submissions. · IDEM application will not be signed and returned until Board of Public Works and Safety approval of availability has been granted. . Carmel UUlities will review sanitary sewer and water plans and comment under separate cover. ff you have questions; please contact Kate Boyle-Weesu, Craig Parks or myseff at 57,1-2441. Dick Hill, Assislant Director Department of Engineedng ct:: M. Kate Boyle-Weese, City Engineer Craig Parks, Assistant City Engineer Mark Monroe, DOCS John Duffy, Carmel Utilities Jim White, Quadrant Development $:~PRO~R~V9 8~E STS ECT4 School Board Members Stephen Backer Paul Bolin Bruce Sreaden Angela Corley Tom Williams Administration R. Stephen Tegarden Supedntendent James 1~ Borrell Assistant Superintendent Human Resources Roger McMichael Assistant Superintendent Business Affairs Barbara Underwood Assistant Superintendent Curriculum and instruction Ubbie Morgan Conner Director of Curriculum Bill Dreibelbis Director of S[.~cial Education Sue H. Moeschl Director of Infomlation Services Samuel B. Robinson Director of Student Services Januaw 8,1999 Mr. Keith Lash, P.E. Project Manager The Schneider Corporation 12726 Hamilton Crossing Blvd. Carmel, IN 46032-5422 RE: Foster Estates Section 4 Dear Mr. Lash: Carmel Clay Schools appreciates receipt of the construction plans and secondary plat for Section 4 of Foster Estates. The school corporation has two areas of concern. In the interest of safety, the installation of sidewalks should be mandated within the subdivision. In addition, any cul-de-sacs should be a minimum of 93 feet to accommodate the turning radius of an 84- passenger school bus. Information regarding the development of new subdivisions is vital to the process of accommodating the educational needs of a growing community. The projected pupil growth from the subdivision has been anticipated in the long-range plan for Carmel Clay Schools. Carmel Clay Schools fully intends to provide a quality educationai program for the patrons of Foster Estates. Sincerely, Samuel B. Robinson Director of Student Services SBR/jbk C: Mr. Mark Monroe, DOCS Educational Services Center · 5201 E. 131st Street · Carmel, IN 46033 · Telephone (3t7} 844-996~ * FAX (317) 844-9965 Carmel Police January 7, 1999 Mr. Keith Lash, P.E. The Schneider Corporation 12726 Hamilton Crossing Blvd. Carmel, IN 46032-5422 RE: Foster Estates Section Four Dear Mr. Lash: I have received and reviewed the site plans of the above-mentioned project. At the present time, I see nothing in the plans that would hamper law enforcement efforts. If we can be of any further assistance to you, please contact us. Respectfully, Michael D. Fogarty Chief of Police MDF:vb cc: Mark Monroe, Dept. of Community Services A Nat onally Accredited Law Er~forcement Agency 15171 571-2500 Fa~, (517) 571-2512 Soil & Water 925 Division Noblesville, lN46060-2744 Ph. (317)773-1432 Fax (317) 776-1101 Drainage, Erosion and Sedirneut Control Plan Technical Review and Comment Projex:tName: ,*c-'O_~T'.~!7~ ~/1 7-.~ ,g Submitted By: ~T:~lgLfl P ~'}d T Reviewed By: Plan Review Proc~ur~: $i~ ~isi! Date: Location: Dcgel Description: Tovn~hlp: /,/~/-/ Civil Toumship: ,~(-~ P' l'he technical review ¢rnd commence are intended to m,aluate the completeness of the eroMon and sediment control vlan for the profe<:L The erosion and sediment control plan submi#ed ~s not reviewed/or the adequacy of the englneering desigt~ /lll praetie~ tncluded in the plon, c~ w~ll a~ those recommendt,M tn the. commen~ should be ~valuctted az to tl~tr fea. ttblllty by a q~alified individual w~th structural prac. tle~e deslgne~4 by a q~alified engineer, IIzc plan ht~v not been rm, it*w~l for local, state or federa! permits that may be required to proceed wlth this ~roject. ~ddltlot~ctl Information, including design colculatlon~ may be requ~,~ted to further evaluate, the erosion sediment control platt ; erosion and sediment contzol plan has been reviewed and it has be~n detemfined that Otc plan: Satisfies the minim~ml requiroment~ and intent of 327IAC 15-5 (Rule ~), Notification will be forwarded to tho Indiana Depm'traent of EnvJxonmental ManagemenL Refer to the comments section for additional information. Does not satisfy the minimum requirements and intent of 3271AC 12; 5 (Rule 5); deficiencies are noted in the checklist and in thc comments section. Deficiencies constitute potential violation of thc vale and lnnSl be adequately addressed for Compliance. The information uecessary to satisfy tho deficiencies mn.sl be submittod: . Please address revisions to th~ r~viewer. pracPrOper implementation o/the erosion and sediment control plan and inspections of the cotx~truction site by the develaper or a representative are nece.~gary, to minlmi~e off-$ite sedimentation. The cleveloper ~houM be a'a,ore that unfore.~een construction activities and ~x'ather conrtition~ mm, e.O~ect the performance ora practice or the eroMon and ~edlment control plon. The plnn musl be a flec~ible docnment, with provlslol~s to modify or substitute Pag~ 2 of .3 ARE THE FOI~LOWlNG TTEMS ADEQUATELY ADDRESSED ON THE PLANS ~t~ ~ ~e Not~ptleable to ~ l~oje~ ~ d~e~ by ~) PROJECq' INFORMA'HON Proje~t Location Map ($how projetr in t~tlarlon Narroti,~ De~crlbln~ the Nature and Puq~o~e of ~he Project L~cation of Ptaaned and/or ExiSting Roads, Utilities, Struciures~ HJghwaya, etc~ Lot and/or Building Locations L.~ndu~ of Adjacent Areas (Show ih¢ ~ntire Upstream Watet~hed and ~dJac~t Area~ ~ithtn $OO Feet ~f the prol;~ty lJne~) TOPOGRAPHIC, DRAINAGE, AND GENERA/. srrE FEATURES Exk~ing Vegetation '( ldmn'~ anJ Delineate ) Location and Hame of All We/lauds, Lake~ and Water Courses On aad ,Adjacent to the 100 Year Floodplains, Floodway Frivgem, and lqoodways OVot~lf~one) ~oi{s [nformntlon (lfl0rltie soib are pretmt, it i$ iht re~Foe~tbtlltF of the own~td~we[oper to tnve*~igate the ~$tmde of ~lla~l~ trod to ob~io ~l~ f~ the appreciate ~m~t E~ug and ~anu~ Coat~t~ at ~ ~tc~M App~pdate ~ lndlente D~e ~tlo~ of Sp~lfic Polntn ~e~ $to~water Dilate ~11 ~ the Site Id~y ~1 R~ei~g Wate~ ( lf ~chd~e Is to a S~e M~d~l ,Vto~ S~. Idm~ ~e ~ of the Muoi~l O~tor ~ the ~ffmate ~dvlng Pot~ti~ Ar~ ~e~ Sta~ water May Entec G~mdwater (Not~ ~tiOa 0f Sto~water Syflem ([~clude Culve~, Sto~ S~, ~s. ~ Yes No l~ 0 3A ~ 0 aB LAND DL~TURBING ACITvT1XES Locatlou and Approximate Dimensions of All Disturbed Areas [t.~. Construction Llmtt$] Qfrem~ R/her~ ¥~eftm've Cover Flail Be pr~xerv~l Should be Clearly D,~dgnated) SOil StocJt, plle$ and or Borrow Aroas($howLoeation~orlVot,~lfJ%ne) ~ 0 4F ~ 0 4G O,~P o ~B 0 ~ 4~ EROSION AND SEDIMEI~ CONTROL NEEASURES Sequence of When Each Measure Will Be Implemented (l{elativetoEm~h Distur~fngAetivitle*) Men//or/rig and Maintenance Guideline~ for Each Measure Perimeter Sediment Contrul Menmrts (l~,~atlon, Co~vtmct,'on Detail. Dlmenston& and Sl~clflcatlon~) Temporary Seeding (Specifications; b;¢lud?ng Seed Mi~ Feri~'llzer. l~me., and Agulch Pate*) Temporary Erosion and Sediment Control (Loc~tion. Con~t, ntcllon D~ail. Dime, Mans, a~d =~t~cifications) Permanent Erosion and S~imo~t Control Me~m~r~s (Locotion. Con~o~tction Detail. Dimen~ion~. am4 Sierra D rain Inle~ Protection (Locoffon, Coo. vwuetion Dtlail, Dimensions. omi Stormwater Outlet Protection (Location. Con.st*~ctton Detall, Dimensions, Stable Consiruetlon Entrance (l. oo~tYon. Con~o~cti~n Detail. Dim~n$ioos. and Eruaion and Sediment COnirol on Individual Building Lots (Specificat,'on:) Pemanent Seedlug (Slmcifie~ntions; Including Seed Mit, Fer~'tizet. Lt>n¢. and Mul~ COMMENTS REGARDING THE DRAINAGE AND I~ROSION CONTROL PLAN Project: FoSter Estates Sec. 4 1. The swale at the rear of lots 296 and 297 appears not to be needed. Please check the swale 9rade at the rear of lot 297. 2. Is'there a dry detention basin at the rear'of lots 281-2837 3. The construction sequence should be modified to in¢orpor&te some of the following comments. 4. Item 4C- The existing storm inlets will need to be protected prior to any construction. Because of maintenance concerns, believe the silt box is inadequate. A stone donut, wir, reinforced silt fence, or slotted riser is recommended. A sediment basin needs to be excavated at each inlet. The construction of the earth berm alonG the north side should be the completed first to prevent storm water drainin9 to 146th Street. 5. Item 4E- A sediment trap is needed between lots 280 and 262 on the south side of the road to prevent sediment from enterinG the street. An additional trap is needed south of structure 600. silt fence will be required behind the curb of all lots if the construction is completed when temporary seeding will not readily Germinate. Staged seeding of disturbed areas must be considered during construction. 6. Item 4J- Silt fence will be required behind the curb for the following lots during home construction- 296, 299, 284, 292, 295, 2~1, 262, 2~3, 279, 280. These lots bare at least 4' of rise from the street to the pad. These items are necessary because a sediment trap does not exist between the curb inlets and cool Creek. Mark Monroe S~eve Cash /' File City of Carmel December 3 I, 1998 Mr. Keith Lash, P.E. Schneider Corporation 12726 Hamilton Crossing Boulevard Cannel, Indiana 46032 re: Foster Estates Section 4 Secondary Plat Application via facsimile Dear Keith: The Secondary Plat application fled for the proposed Foster Estates Subdivision Section 4 has been reviewed by our office. The following are comments that need to be addressed and plans updated accordingly: Application: · The application form is complete as fled. · A brief report describing the utilities to service the site needs to be submitted. oA copy of the covenants for this section need to he submitted. Plat: · The owner/subdivider's name is misspelled. Construction Plans: · The proposed water hydrant locatiom need to be approved by the Cannel Fire Department. · The final location, colors and style of any proposed entrance signage will need to be specified. · The final landscape plan and fencing detail need to be provided. · All correspondence fi'om the Technical Advisory Committee will need to be submitted to our office. Please distribute your plans immediately, if not already done, to the members of the Technical Advisory Committee in preparation for the January 20th meeting. Further comments on the plan will be forthcoming once revised plans have been received by our office. All infon-nation will need to be submitted and reviewed by our department before a docket number will be issued, fi.you have questions regarding these comments please contact me at 571-2417. Thank you for your time and consideration. Sincerely, Mark T. Monroe, AICP Planner Department of Community Services ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 CITY OF CARMEL DEPARTMENT OF COMMUNITY SERVICES TRANSMITTAL From: Mark T. Monroe, AICP Department of Commllllity Sorvic~ One Civic Square Carmel, IN 46032 ph. 317 571 2417 fax 317 571 2426 {~l The material you requested Fl For your information .~For r~vicw and comment F! For approval Quantity/Description sAforms~ran~nit Cky of' Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 317/571.2600 The Schneider Corporation Attn. Keitla Lash, P.E. 12726 Hamilton Crossing Blvd. Carmel, Indiana 46032 RE: EOSTERESTATES, SECTION FOUR LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Foster Estates, Section Four and has approved the plans subject to the following: 1. Move fire hydrant from lot 296 to between lots 286 and 287. 2. Install new fire hydrant on the comer of lot 299. 3. Install new fire hydrant between lots 264 and 265. Date:_December29, 1998 By: Stanley Puckett, Fire Marshal Carmel Fire Department Fire Prevention Saves Lives and Property 317-574-3797 phone 317-574-3799 fax December 18, 1998 Mark Monroe Department of Community Services One Civic Square Carmel, IN 46032 RE: Foster Estates Section Four Dear Mark: Please find enclosed the following materials for the above referenced project: 1. 2 Prints of the Secondary Plat and Site Construction Plans 2. 2 Copies of the legal description (8 ½" x 11") 3. Secondary Plat Application 4. Copies of letters to TAC members 5. Subdivider Agreement Form The above referenced materials are for your review and comments with respect to Secondary Platting. It is my understanding that this matter will be on the agenda of the January 20, 1999 Technical Advisory Committee meeting. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, ~eith Lash, P.E. Project Manager Enclosure \\SEC_CARMEL\DATAk/OBS\610\002\docsknonroe.doc hndder Corporation 12726 ltamilton Cro~aing Blvd. Carmel, IN 4~032-5422 December 18, 1998 Kate Boyle City of Carmel Engineer's Office One Civic Square Carmel, IN 46032 RE: Foster Estates Section Four Dear Kate: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION 'Keith Lash, P.E. Project Manager: Enclosure J:\610\002\docs\TACSUB.doc dder Corporation December 18, 1998 Stan Puckett City of Carmel Fire Department Two Civic Square Carmel, IN 46032 RE: Foster Estates Section Four $17-574-3797 phone 317-574-3799 fax Dear Stan: Please find enclosed one set ofthe construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Cannel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~eith Lash, P.E. Project Manager Enclosure 7 l:\610\002\docs\TACSUB.doc December 18, 1998 Kimbedy Theademan Carmel/Clay Communications 31 First Avenue, N.W. Carmel, IN 46032 RE: Foster Estates Section Four Dear Kimberly: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, FI~eith Lash, P.E. Proj&ct Manager Enclosure J:\610\002\d ocs\TACSUB.doc December 18, 1998 Roger Harper Carmel/Clay Schools 5201 East 131,6 Street Carmel, 1N 46033 RE: Foster Estates Section.Four Dear Roger: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~teith Lash, P.E. Project Manager Enclosure J:\610\002\docs\TACSUB.doc Corporation December 18, 1998 Michael Fogerty City of Carmel Police Department Three Civic Square ~ Carmel, 1N 46032 RE: Foster Estates Section Four 317-$74-3797 phone 317-574-3799 fax Dear Michael: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION Kt~ith Lash, P.E. Project Manager Enclosure J:\610\002\docs\TACSUB.doc 'der Corporation. December 18, i998 Randy Auler Carmel/Clay Parks Department One Civic Squgre Carmel, IN 46032 RE: Foster Estates Section Four Dear Randy: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Cannel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION Project Manager Enclosure J:\610\002\docs\TACSUB.doc ndder Capomion December 18, 1998 317-574~3797 phone 317-574-3799 fax Larry Castetter Cinergy/PSI 1441Sou,thGuilford Carmel, IN46032 RE: Foster Estates Section Four Dear Larry: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION Kei~ ash, P.E. Project Manager Enclosure J:\610\002\docs\TACSUB.doc December 18, 1998 Mary Schultz ~ndiana Gas Company ~16000 Allisonville Road Noblesville; IN 46060 RE: Foster Estates Section Four Dear Mary: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION Project Manager Enclosure J:\610\002\docs\TACSUB.doc 'Schne r Corporation 12726 Ha milton Crossing Blvd. Carmel, IN 46032-5422 317-574-$797 phone 317-574-3799 fax December 18, 1998 Peg Dickson Ameritech 5858 North College Avenue Indianapolis, IN 46220 RE: Foster Estates Section Four Dear Peg: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION Keith Lash, P.E. Project Manag& Enclosure J:\610\002\docs\TACSUB.doc dder. Corporation 317-574-3797 phone 317-574-3799fax December 18, 1998 Tim Gibson Time Warner Cable 516 East Carmel Drive Carmel, IN 46032 RE: Foster Estates Section Four Dear Tim: Please find enclosed one set'of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION Kdith Lash, P.E. Project Manager Enclosure J :\610\002\docs\TACSUB.doc Theh der Corporation December 18, 1998 Steve Cash Hamilton County Surveyor's Office One Hamilton County Square, Sqite 146 Noblesville, IN 46060 RE: Foster Estates Section Four Dear Steve: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~eith Lash, P.E. Project Manager Enclosure J:\610\002\docs\TAC SUB.doc December 18, 1998 Dave Klingensmith City of Carmel Street Department 211 Second Street S.W. Carmel, IN 46032 RE: Foster Estates Section Four Dear Dave: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION 5~e~th Lash, P.E. Project Mahager Enclosure I:\610\002\docs\TACSUB.doc 127~6 llamiho. Crossing Blvd. Carmel, IN 4~:032-5422 317-S74-3797 phone 317 574 3799 fax December 18, 1998 John South, P.E.. Hamilton County:Soil & Water COnservation District 925 Division Street Noblesville, IN 46060 RE: Foster Estates Section Four Dear John: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE' SCHNEIDER CORPORATION R~eith'Lash, P.E. Project Manager Enclosure J:\610\002\docs\TACSUB.doc 317 574 3797 phone 317 574 3799 fax December 18, 1998 John Duffy Carmel City Utilities One Civic Square Carmel, 1N 46032 RE: Foster Estates Section Four Dear John: Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~eeith Lash, P.E. Project Manager Enclosure J:\610\002\docs\TACSUB.doc 317-574~3797 phone 317-574-3799 fax December 18, 1998 Brian Houghton Jofies&Henry 2420N. Coliseum Blvd., Suite 214 Fo~Wayne, IN 46805 RE: Foster Estates Section Four Dear Brian: Please find enclosed one set of the construction plans and secondazy plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Carmel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, THE SCHNEIDER CORPORATION ~F~eith Lash, P.E. Project Manager Enclosure J:\6!0\002\docs\TACSUB.doc Schndder Corporation 317-574 3797 phone 317-574 3799 fax December 18, 1998 JeffHill Hamilton County Highway Department 1717 East Pleasant Street Noblesville, IN 46060 RE: Foster Estates Section Four Dear Jeff.' Please find enclosed one set of the construction plans and secondary plat for the above referenced project by Quadrant Development Co. Inc. We are tentatively scheduled to present this project to the Cannel Technical Advisory Committee at its January 20, 1999 meeting. Please review the enclosed material and forward any comments or concerns you may have to my attention. Should you have any questions or require additional information, please feel free to contact me at your convenience. Sincerely, o.o A Om K~ith I]ash, P.E. Project Manager Enclosure J:\610\002\docs\TACSUB.doc