Loading...
HomeMy WebLinkAboutTAC minutes 5-19-04Orin Jessup Land Co, Sec 2, pt lots 238-241 - Matthews Auto Repair Filed by E. Davis Coots of Coots, Henke & Wheeler REPRESENTING THE PETITIONERS: Mike Probst, WHEIHE ENGINEERS Daniel Matthews, MATTHEWS AUTO REPAIR Comes now Matthews Auto Repair. The applicant seeks the following development standards variance: The site is located at 725 E 106th Street. The site is zoned B- 2/Busineas within the Home Place Business District Overlay. HOYES: GROVES: SHUPPERD: BROERMANN: HILL: SOUTH: PROBST SOUTH: AKERS: HOYT: DOBOSIEWICZ: BREWER: DOBOS[EWICZ: BREWER: DOBOSIEWICZ: BLANCHARD: ALLEY: Waiving detention requirements will not be able to do from impervious surface. ~e will~r~e_q_Uj~d~t-en--tl~'n. Cannot release into a storm drains, which is the Almond & Stultz Drain. Sfi~/fll?lJo-n~-or /~d~-~gr6~u~d will be acceptable. I need~e~gaXe~Y6d:-site:plans. We have utilities there but I need engineered site plans. There is gas at the building now will you add to the load? Here is your contact person to upgrade meter if necessary. Relocating or adjusting the width of the entrance we have concern with what type will go in. We would request the fight-of-way stick with the Thoroughfare Plan so sixtyzf~tr(60):feet.half. What we need is for you to keep working with Joel and the dimensions of the building so we can get this correct. No plans, no comments. I would like a set of plans. Is the total impact less than one acre? Yes. Then you are exempt from the Rule Five Requirement. No comments. I sent you a letter May 17. I need a set of construction plans before I comment. We need:variances and plans to continue tlAi~'s:pr~ess I need an engineeredlandscaping:plaCn. Could you sup-port xelie~:witho~_[an~ds_caping? No:and:on the plan_s -I _ng~_d- ea__~sp_n3~egts- a_n_d~oy, erhe ad: line~s~hown. This submittal today is unacceptable. You have a need for pavement over more of the site than originally discussed. V ananc e~_ss n~n~e c ~ s~s ~a~r y. haxe~not ~been:addressed-onqandscapmg, ~-url/ihg:and d~-ai~a~..~.. S6~g~titioner hold off on BZA until you can return to TAC with acceptable engineered and complete plans for appropriate comments. Curbing, landscaping are required by all petitioners along with drainage, and adequate parking. Discussion should continue outside of TAC with your client and us to ensure your success next time through. No plans, no comments. Building permits should NOT be issued unless the District has issued a connection permit and any work on the sewer connection will require a District permit and inspection. Deta_!il~ed:c6-n~'dfion p]~s~e~'~rt'tCb'e:submitt~-f~ib~.~ The existing sanitary sewer lateral should be re-used if possible and nay work on the sewer connection will require a District permit and inspection. ...END...