HomeMy WebLinkAboutCorrespondenceMichael Schipp, AIA
Fanning/Howey Associates, Inc.
9025 North River Road, Suite 200
Indianapolis, IN 46240
CRE :C(ay Junior High School Modular Office Relocation
The undersigned has reviewed the proposed plans for
Clay Junior High School Modular Office Relocation
and has approved the plans subject to the following:
1. The fire alarm system provided for the temporary office will need to be directly connected the
main building's fire alarm system, so that in the event of a fire in either the temporary office or
the main building, notification of an active fire alarm will exist.
2.
3.
4.
5.
6.
City of Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
Voice (317) 571 -2600 Fax (317) 571 -2615
Fire Prevention Bureau
LETTER OF APPROVAL
Please respond to the above noted condition(s) in writing and submit to our office prior to the
scheduled Technical Advisory Meeting for this project.
Date: June 15. 2004 By: Gary Hoyt, Fire Marshal
Carmel Fire Department
June 10, 2004
Mr. Michael K. Schipp, AIA
Fanning/Howey Associates, Inc.
9025 North River Road, Suite 200
Indianapolis, IN 46240 -2125
Dear Mr. Schipp:
Sincerely,
S:\PROJRE V 04 \CJAYMIDSCH
R' 111 R lea ME
In I malt
CITPAIWt EL
JAMES BRAINARD, MAYOR
RE: Modular Office Relocation -Clay Middle School
We have received the submission for this project which is scheduled for the June 16, 2004 Technical
Advisory Committee meeting. The Department of Engineering has no issues or objections to the relocation
of the modular offices from the Forest Dale Elementary School on Lakeshore Drive to the Clay Middle
School at 126 and Shelborne Road.
Dick Hill, Assistant Director
Department of Engineering
cc: Dobosiewicz, Department of Comtrmnity Services
Department Review
File Copy
DEPARIMES f OF ENGINEERING
ONE CIVIC SQUARE, CARVIEL. IN 46032 OFFICE 317.571.2441 FAX 317.5 7 1.2439
E.\i: \I1. kwce,eL i.carnicl.in.us
NATURAL RESOURCES
PLAN REVIEW AND COMMENT
Hamilton County Soil and Water Conservation District
1108 South 9 Street, Noblesville IN 46060
Ph- 317- 773 -1432 or Email at john- southgiaswcd.org
Project Name- Modular Office Relocation- Carmel Middle School
Owner/Developer
Engineer-
Plan Review Date:
Soils Information:
Carmel Clay School
Mr. Michael Schipp
Fanning/Howey Associates
9025 N. River Road Suite 200
Indianapolis, IN 46240
June 10, 2004
N/A
I have reviewed the plans for this project and have the following comments:
This project disturbs less than 1 acre of land. A storm water pollution prevention plan is
not required.
Should you have questions concerning these comments, please contact me.
Submitted By:
John B. South P.E.
Certified Professional in Erosion and Sediment Control
Cc: Jon Dobosiewicz, Carmel DOCS
Greg Hoyes, County Surveyor
File
JUN 09 '04 10:51AM
June 9, 2004
Xenton C, Ward, Surveyor
API one (317) 7764 )5
'lax (3
Fanning/Howey Associates, Inc,
ATTN: Michael Schipp
9025 North River Road, Suite 200
Indianapolis, IN 46240 -2125
VIA FACSIMILE: 848 -0843
Sincerely,
Greg H yes
Plan Reviewer
Cc: Jon Dobosiewicz Carmel DOCD
John South I4CSWCD
Dick Hill Carmel Engineering
Suite rS8
One J(amilton County Square
.Noblesville, Indiana 46o6o.113o
P. 2/3
Re: Modular Addition at Clay Middle School
Dear Mr. Schipp:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's
Office on May 28, 2004 for this project and have the following comments:
1. This project falls within the jurisdiction of the City of Carmel. We do not have
any county regulated drains in the area. Please direct any future storm sewer
questions to the City of Cannel Engineering Department.
2. The proposed project DOES fall in a Carmel Wellhead Protection Area.
3. No permits will be needed from our office.
4. Please note the additional comments may be warranted at a later date.
Should you have any questions, I can be reached at 317 7764495.
June 3, 2004
frail.,1
Michael D. Fogarty
Chief of Police
C&rme
Carme
Michael K. Schipp, AIA
Fanning/Howey Associates, Inc.
9025 N. River Road
Indianapolis, IN 46240
MDF:vb
cc: Dept. of Community Services
e parfinenf
d
a. 4 6432
RE: Project No. 201103.04
Dear Mr. Schipp:
I have received and reviewed the information for the above mentioned
project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
(317) 571 -2500 A Nationally Accredite7cr r forcement Agency Fa. (317) 571 -2512
JUN -01 -2004 13: FROM:HAMILTON CO HWY DEP 3177769814
June 1, 2004
Mr. Michael K. Schipp
Fanning /Howey Associates, Inc.
9025 North River Road, Suite 200
Indianapolis, IN 46240 -2125
VIA FACSIMILE
RE: Clay Middle School
BZA Request
Clay Township
Dear Mr. Schipp:
This letter serves to acknowledge receipt of a transmittal received 5/28/04 containing the
plans for the above mentioned project. After reviewing the plans the Highway
Department has the following comments:
1. It appears that this project Iles entirely within the limits of the City of Carmel.
Therefore, all future comments should be directed toward the City. If you have any
information contrary to this statement, please contact me Immediately.
If you have any questions or comments concerning this letter, please fee! free to contact
me at anytime.
Sincerejy,
Steven J. Broermann
Staff Engineer
cc: Jan Dobosiewicz
Greg Hoyes
G: IUSER3 1S8104tad06- D1- 04claymIddlc. doe
1701) South 10th Street
Noblesville. In. 46060
HAMILTON COUNTY
HIGHWAY DEPARTMENT
TO:317 571 2426 P.001'001
Office (317) 7731770
www.co.bamilton.in.us Fax (317) 776 -9814
E R Fanning/Howey
Associates, Inc.
Architects Engineers Consultants
To: Pam Babbit
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
From: Michael K. Schipp, AIA
Project Manager /Principal
T R A N S M I T T A L
Date: June 1, 2004
Project:
Modular Office Relocation
Clay Middle School
Carmel Clay Schools
Carmel, IN
Project No. 201103.04
NO. OF COPIES
1
1
DESCRIPTION OF ITEMS
Letter Dated May 28, 2004 to Pam Babbit, City of Carmel
Site Location Map
Property Owners List from the Hamilton County Auditor
Sent via:
COMMENTS:
mks /jm
r Mail r UPS r Overnight 17 Hand Deliver r Pickup r Courier
r Fax j
Fanning/Howey Associates, Inc. Intends to send this information (including any attachments) only to the designated individual or entity. If
you received this information in error, please notify the sender by replying to the electronic mail (if electronic) or by telephone at the
number indicated on this document. Use, disclosure, dissemination, distribution, or reproduction of this message by unintended
recipients is not authorized and may be unlawful.
9025 North River Road, Suite 200 1 Indianapolis, Indiana 46240 -2125
(317) 848 -0966 1 Fax (317) 848 -0843 1 http: /www.fhai.eom
anning/Howey
J Associates, Inc.
Architects Engineers Consultants
May 28, 2004
Pam Babbitt
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
Re: Modular Office Relocation
Clay Middle School
Carmel Clay Schools
Carmel, IN
Project No. 201103.04
Dear Pam:
As requested in your May 24, 2004 fax, we are pleased to account for the four items you requested
under "Petitioner".
Item No. 1: The plans for this Project, 3 sheets, were mailed to the TAC members on
May 27, 2004.
Item No. 2: An up -to -date list of adjacent property owners is enclosed.
Item No. 3: An area location map is enclosed.
Item No. 4: The two modular office units will be placed at the school site from July 2004 until
March 2005.
Sincerely,
FA�N�NING /HOWE�Y INC.
Michael K. Schipp, AIA
Project Manager /Principal
mks /jm
enclosure
9025 North River Road, Suite 200 Indianapolis, Indiana 46240
(317) 848 -0966 Fax (317) 848 -0843 http://www.fhai.com
Post -it® Fax Note 7671
Date `/L
pages
To 14(L
O O$ V✓1
From 3
i T
Co. /Dept.
Co.
Phone
Phone
Fax 4
Fax
Tingley, Connie S
From: Butler, Angelina V
Sent: Monday, May 17, 2004 12:56 PM
To: Tingley, Connie S
Cc: Morrissey, Phyllis G; Pattyn, Dawn E; Babbitt, Pamela A; Hollibaugh, Mike P; Keeling,
Adrienne M; Kendall, Jeff A; Brewer, Scott I; Hancock, Ramona B; Dobosiewicz, Jon C;
Pohlman, Jesse M; Brennan, Kevin S
Subject: Docket No. Assignment: (SUA) Carmel /Clay Schools Clay Middle School (#04050024 SUA)
Connie,
Please print and fax this e-mail to the petitioner identified below and update the file. I have issued the necessary Docket
Number for (SUA) Carmel/Clay Schools Clay Middle School It will be the following:
Docket No. 04050024 SUA $0.00
Total Fee: $0.00 (exempt)
Carmel/Clay Schools Clay Middle School Special Use Amendment
Petitioner seeks approval to place 2 modular classrooms on -site.
Docket No. 04050024 SUA Chapter 5.02 special use in the S -1 zone
The site is located at 5150 E 126th Street.
The site is zoned S- 1/Residence Low Density.
Filed by Michael Schipp of Fanning/Howey for Carmel Clay Schools.
Petitioner, please note the following:
1. This Item will be on the June 16 agenda of the Technical Advisory Committee.
2. Mailed and Published Public Notice needs to occur no later than Thursday, June 3, 2004. Published notice is
required within the Indianapolis Star.
3. The Proof of Notice will need to be received by this Department no later than noon, Friday, June 25. Failure to
submit Proof of Notice by this time will result in the tabling of the petition.
4. The Filing Fee and Nine (9) Informational Packets must be delivered to BZA Secretary Connie Tingley no
later than Noon, Friday, June 18. Failure to submit Informational Packets by this time will result in the automatic
tabling of the petition to the Monday, July 26, 2004, agenda of the BZA.
5. This Item will appear on the June 28, 2004 agenda of the Board of Zoning Appeals under Public Hearings.
6. The petitioner will need to provide a fully filled -out Findings -of -Fact sheets for each petition the night of the
meeting for the Board's use (Sheet 8). On Ballot sheets, only fill out docket number, petitioner, and date (Sheet 7). Ballot
sheets must be collated.
7.) PETITIONER: refer to your instruction sheet for more details.
Petitioner: please complete the following items:
1.) If not already done, please provide a copy of plans to the TAC members by June 1, for the June 16 Technical
Advisory Committee Meeting. TAC members list can be found online at www.ci.carmel.in.us.
2.) Provide an up -to -date list of adjacent property owners from the Hamilton County Auditor.
3.) Please provide an area location map.
4.) Please provide the length of time the modular classrooms are proposed to be present.
Please contact Mr. Schipp 848 -0966 (Fax: 848 -0843) with this information. Once the file is updated please return it to
my office.
Thank you,
Angie
DATE: May 17, 2004
TO: Michael Schipp, Fanning /Howey
FAX: 848 -0843
FROM: Connie
NOTES:
City of Carmel
Department of Community Services
One Civic Square
Carmel, IN 46032
317 571 -2417
Fax: 317-571-2426
FACSIMILE TELECOPY COVER LETTER
Attached hereto are 2 pages, including this cover letter, for facsimile transmission.
Should you experience any problem in the receipt of these pages, please call 317/571/2419
and ask for Connie.
You are listed as the contact person for this docket. Please make sure you notify your
Petitioner(s).
Attached is the filing information for:
Carmel /Clay Schools Clay Middle School (SUA)
Please call if you have any questions.
CONFIDENTIALITY NOTICE: The materials enclosed with this facsimile transmission am private and confidential
and am the property of the sender. The information contained in the material is privileged and is intended only for
the use of the individual(s) or entity(ies) named above. if you are not the intended recipient, be advised that any
unauthorized disclosure, copying, distribution or the taking of any action in reliance on the contents of this telecopied
information is strictly prohibited. If you have received this facsimile transmission in error, please immediately notify
as by telephone to arrange for retum of the forwarded documents to us.
i� Fanning/Howey
Associates, Inc.
Architects Engineers Consultants
T R A N S M I T T A L
To: Angie Butler
Planning Administrator
Board of Zoning Appeals
Carmel Department of Community Services
One Civic Square
Carmel, IN 46032
From: Michael K Schipp, AIA
Project Manager /Principal
Date:
May 14, 2004
Project: Modular Office Relocation
Clay Middle School
Carmel Clay Schools
Carmel, IN
Project No. 201103.04
1
NO. OF COPIES
2
2
DESCRIPTION OF ITEMS
Special Use Approval Request
Project Drawings
Sent via:
COMMENTS:
r Mail r UPS r Overnight 17 Hand Deliver r Pickup r Courier
mks /ejr
r Fax I
We have requested to be placed on the June 28, 2004, Technical Advisory Committee (TAC) Agenda.
Fanning /Howey Associates, Inc. intends to send this information (including any attachments) only to the designated individual or entity. If
you received this information in error, please notify the sender by replying to the electronic mail Of electronic) or by telephone at the
number indicated on this document. Use, disclosure, dissemination, distribution; or reproduction of this message by unintended
recipients is not authorized and may be unlawful.
9025 North River Road, Suite 200 Indianapolis, Indiana 46240 -2125
(317) 848-0966 Fax (317) 848 -0843 http: /www.fhai.com