Loading...
180075 12/08/2009 CITY OF CARMEL, INDIANA VENDOR: 105285 Page 1 of 1 ONE CIVIC SQUARE GAYLOR ELECTRIC INC CHECK AMOUNT: $5,946.00 CARMEL, INDIANA 46032 PO BOX 3757 CARMEL IN 46082 CHECK NUMBER: 180075 CHECK DATE: 1218/2009 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 902 4460807 91977 5,534.00 PERFORMING ARTS CENTE 902 4460807 91995 412.00 PERFORMING ARTS CENTE GA- YIL 0, REMIT TO: F Iwdw R. P.O. Box 3757 WE GLADLY ACCEPT Corporate Offices Carmel, IN Carmel, IN 46082 -3757 Visa MasterCard American Express 317.843.0577 Fax 317.848.0364 800.878.0577 http: /www.gaylor.com FED ID# 20- 3727689 8 nvo/ ce 91977 Bill to: Job: 91051802 City of Carmel Carmel City Ctr Energy Ct Redevelopment Commission 777 3rd Avenue SW One Civic Square South of City Center Drive Carmel, IN 46032 Carmel, IN 46032 Invoice 91 Date: 09/30/09 Custo P.O. Payment Terms: NET 30 Salesperson: Customer Code: CITCAR Page 1 of 1 VENDOR: 105285 OF CARMEL, INDIANA GAYLOR ELECTRIC INC CHECK AMOUNT: $5,9 0 5 CITY po BOX 3757 CHECK NUMBER: 121812009 ONE CIVIC SQUARE CARMEL IN 46082 CHECK DATE: CARMEL, INDIANA 46032 DE AMOUNT SCRIPTI TS CENTS PO NU MBER I NVOICE N UMBE_!? 5 PERFORMING STS CENTE ACCOUNT 91977 DEPA RTME_N? 4460807 412.00 PERFORMING 902 4460807 91995 902 Page: 1 September 25'20O9 CP#O2 CCC Energy Center CHANGE PROPOSAL Tom P|ahitko Shie| Sexton 0U2 North Capitol Indianapolis, |N4G2O4 Proposal: RFQ#XXX/CP#62 AT&TInvoice from Aug 16th thru Sept. 16th, 2009 for the powerservice for the Carmel Energy {enter. Dear Tom P|ahitko: Per your request, we have reviewed the documents provided related to this change in scope request and prepared nn estimate nf the costs involved. The documents received to define the change in scope are aofollows: 1 RFO#XXXX Dated: 9/25/2009 VVo have determined the value nf the work involved in this change hobe 333 We request a Change Order be issued in that amount to authorize us to include this work in our contract. To expedite implementation of this change, please return a copy of this letter signed as noted below to acknowledge acceptance of our Change Proposal. Attached is a scope summary and cost breakdown for your review to be sure we have accurately interpreted the work wo are required tn perform by this Change Proposal. Thank you for your consideration ofGay|or Group, Inc. VVe look forward to meeting your needs. Sinuene|y, QJ a4nieF. Spence Project Manager PROPOSAL ACCEPTANCE: ACCEPTED |N THE SUM OF $333 THIS DAY OF FOR BY COMPANY NAME AUTHORIZED AGENT NAME TITLE NOTE: This proposal is valid for 30 days from the proposal date or until work has progressed to the point that this proposal would not bevalid. Please sign and return the original proposal and retain o copy for your files. Page 1 of 2 Date: 9/25/2009 Time: 3:28 PM September 25, 2009 Number: CP #62 SCOPE OF WORT( FOR: RFQ #XXX /CP #62 Alterations, specifications, remarks and exceptions are as follows: 1. No cutting or patching of the existing surfaces are included, if applicable. 2. Sales Tax is not included. 3. All work in above quote is based on straight time. NOTE: The above price is based on attached AT &T Invoice (Not Attached at this time). See attached Invoice for scope of work. Page 2 of 2 Date: 9/2512009 Time: 3:28 PM CHANGE PROPOSAL PRICING SUMMARY Project CCC Energy Center RFQ #XXX /CP #62 Division Electrical DATE 9/25/2009 Contractor Gaylor Page Trade Labor Labor Material Equipment Subs Breakdown Classification Manhours I Rate Cost/Credit I Cost/Credit Cost/Credit I Cost/Credit AT &T Electrical 2 45.33 90.66 3.75 222.08 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 MET TOTALS 2 45.33 90.66 1 3.75 1 222.08 NET TOTAL LABOR COST OF 90.66 x 1.10 99.73 NET TOTAL MAT'L COST OF X 1.10 NET TOTAL EQUIPMENT COST OF 3.75 x 0.00 NET SUBCONTRACTOR COST OF 222.08 x 1.05 233.18 NET SMALL TOOLS COST OF 90.66 x 0.00 (BARE LABOR COST) NET TOTAL SALES TAX 225.83 x 0.00 (BARE MAT'L COST) BOND COSTS 332.91 x 0.00 TOTAL COST 333 September 25, 2009 CP #63 CCC Energy Center CHANGE PROPOSAL Tom Plahitko Shiel Sexton 902 North Capitol Indianapolis, IN 46204 Proposal: RFQ #XXX /CP #63 Duke Energy Invoice from Aug 4th thru Sept 2nd 2009 for the power service for the Carmel Energy Center. Dear Tom Plahitko: Per your request, we have reviewed the documents provided related to this change in scope request and prepared an estimate of the costs involved. The documents received to define the change in scope are as follows: 1 RFQ #XXXX Dated: 9/25/2009 We have determined the value of the work involved in this change to be 5,201 We request a Change Order be issued in that amount to authorize us to include this work in our contract. To expedite implementation of this change, please return a copy of this letter signed as noted below to acknowledge acceptance of our Change Proposal. Attached is a scope summary and cost breakdown for your review to be sure we have accurately interpreted the work we are required to perform by this Change Proposal. Thank you for your consideration of Gaylor Group, Inc. We look forward to meeting your needs. Sincerely, Gaylor, I c. W Spe O' Project Manager PROPOSAL ACCEPTANCE: ADD: ACCEPTED IN THE SUM OF $5,201 THIS DAY OF 20 FOR BY COMPANY NAME AUTHORIZED AGENT NAME TITLE NOTE: This proposal is valid for 30 days from the proposal date or until work has progressed to the point that this proposal would not be valid. Please sign and return the original proposal and retain a copy for your files. Page 1 of 2 Date: 9/2512009 Time: 3:31 PM September 25, 2009 Number: CP #63 SCOPE OF WORK FOR: RFQ #XXX /CP #63 Alterations, specifications, remarks and exceptions are as follows: 1. No cutting or patching of the existing surfaces are included, if applicable. 2. Sales Tax is not included. 3. All work in above quote is based on straight time. NOTE: The above price is based on attached Duke Energy Invoice. See attached Invoice for scope of work. Page 2 of 2 Date: 9/25/2009 Time: 3:31 PM CHANGE PROPOSAL PRICING SUMMARY Project CCC Energy Center RFQ #XXX /CP #63 Division Electrical DATE 9/25/2009 Contractor Gaylor Page Trade Labor Labor Material Equipment Subs Breakdown Classification Manhours I Rate Cost/Credit I Cost/Credit I Cost/Credit Cost/Credit Duke Energy Electrical 2 45.33 90.66 3.75 4,857.91 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 NET TOTALS 2 45.33 1 90.66 1 3.75 4,857.91 NET TOTAL LABOR COST OF 90.66 x 1.10 99.73 NET TOTAL MAT'L COST OF X 1.10 NET TOTAL EQUIPMENT COST OF 3.75 x 0.00 NET SUBCONTRACTOR COST OF 4,857.91 x 1.05 5,100.81 NET SMALL TOOLS COST OF 90.66 x 0.00 (BARE LABOR COST) NET TOTAL SALES TAX 4,861.66 x 0.00 (BARE MAT1 COST) BOND COSTS 5,200.54 x 0.00 TOTAL COST 5,201 Account Number 1900 3694 -01.4 CM 03 $4,857.91 Sep 25, 2009 For more detailed billing information on your monthly bill, check box on right HelpingHand Contribution Amount Enclosed (for Customer Assistance) �o8aolalQoa��oo bp ef false d' olaallolaoo8a1a1o1oao1a1a1a0maa11d0oo1 00023777 PSI1 ZA 09246. ZIPCODE 03 YNNNNN 1oz Gaylor Inc Carmel Energy Center PO Box 9001076 PO Box 3757 Carmel IN 46082 -3757 Louisville KY 40290 -1076 900 00004857917 19003694014 0925.20099 00004994116 T PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT. t Page of 1 aylor Inc Duke Energy 891 3Rd Ave SW gy 1- 800 -521 -2232 1900 3694 -01 -4 Carmel IN 46032 W0I01ofrs9a��th PO Box 9001076 Payments after Sep 03 not included Bill prepared on Sep 03, 2009 Louisville KY 40290 -1076 Last a Elec 106943187 Aug 04 Sep ment received Au 19 9 Next meter reading Oct 02, 2009 Ak 0229 57,616 On Peak 116.00 D'::::::::}•<:J:': ::ni:ii:::::i'i:i:ii:!gi:�:: •:4:i: i:i.i::;:..'.::; is iiii: i %:i: i::J: iii:::: ?ii:•i ::.:+i:i:'::i: ii iii'r'•:i•i: "i iii i':i i::i:: Usage 57 kWh 22 .40 616 k Duke Energy Rate LSNO kVar Amt Due Previous Bill $4,515.19 4,540.10 Payment(s) Received 4,515.19 Current Electric Charges 4,540.10 Balance Forward 0.00 Current Electric Charges 4,540.10 a A Taxes s Taxes Current Amount 317.81 Due 4,857.91 Offset Your Carbon Footprint: The Carbon Offset Program gives you the opportunity to reduce your carbon footprint. Your voluntary payments help support the deployment of technologies that reduce or prevent greenhouse gas emissions through the purchase of carbon credits. Learn how you can Participate at www. duke energy .com /indiana /products /carbon- offset- program.asp. U Average Cost: 0.0788 per kWh Se 2009 •:.ii:. >ia:::4. p 25, 4,857.91 4,994.11 visit us at www.duke- ehergy.com Spence, Dana From: Thomas Plahitko [tlahitko @shielsexton.com] Sent: Monday, September 28, 2009 7:34 AM To: Spence, Dan Cc: Fishburn, Chasity; Mike Anderson Subject: RE: Carmel Energy Center (AT &T Aug 16th Sept 16th CP #62 Duke Aug 4th Sept 2nd C P #63) Dan, Yes, submit invoice today addressed to City of Carmel, but send it to me for processing. We will continue to address the need for them to take over the billings. Thanks. Tom Plahitko Carmel Performing Arts Center Interiors Project Engineer 777 3rd Ave. SW, Carmel, IN 46032 Phone: (317) 688 -6894 Cell: (317) 339 -2207 From: Spence, Dan [mailto:SPENCE @gaylor.com] Sent: Friday, September 25, 2009 3:40 PM To: Thomas Plahitko Cc: Fishburn, Chasity; Mike Anderson Subject: Carmel Energy Center (AT &T Aug 16th Sept 16th CP #62 Duke Aug 4th Sept 2nd CP #63) Importance: High Tom: See attached CP #62 AT &T CP #63 Duke. Still bill the Owner? Please advise (We would like to bill today Any update on the Owner taking over the Utilities 1 Thanks; Dan Spence Project Manager Indianapolis Branch Gaylor, Inc. 17225 Kraft Court Noblesville IN 46060 317 214 -6300 voice 317 214 -6301 fax 317 716 -5460 mobile www.gaylor.com http: /www.gaylor.com 2 GAYL REMIT TO: yr P.O. Box 3757 WE GLADLY ACCEPT Corporate Offices Carmel, IN Carmel, IN 46082 -3757 Visa MasterCard American Express 317.843.0577 Fax 317.848.0364 800.878.0577 http: /vvww.gaylor.com FED ID# 20- 3727689 Invoice 91 995 Bill to: Job: 91051802 City of Carmel Carmel City Ctr Energy Ct Redevelopment Commission 777 3rd Avenue SW One Civic Square South of City Center Drive Carmel, IN 46032 Carmel, IN 46032 Invoice 91995 Date: 10/01/09 Customer P.O. Payment Terms: NET 30 Salesperson: Customer Code: CITCAR Remarks: CP #64 01 ffiffilm Electrical Work Complete for Carmel City Ctr Energy Ctr Per Terry Crocket See attached paperwork 412.00 Subtotal: 412.00 Total: 412.00 Page: 1 i t LZ)z t rn7 September 30, 2009 CP #64 CCC Energy Center CHANGE PROPOSAL Tom Plahitko Shiel Sexton 902 North Capitol Indianapolis, IN 46204 Proposal: RFQ #XXX /CP #64 Install dedicated ground for IT equipment. Dear Tom Plahitko: Per your request, we have reviewed the documents provided related to this change in scope request and prepared an estimate of the costs involved. The documents received to define the change in scope are as follows: 1 RFQ #XXXX Dated: 9/30/2009 We have determined the value of the work involved in this change to be 412 We request a Change Order be issued in that amount to authorize us to include this work in our contract. To expedite implementation of this change, please return a copy of this letter signed as noted below to acknowledge acceptance of our Change Proposal. Attached is a scope summary and cost breakdown for your review to be sure we have accurately interpreted the work we are required to perform by this Change Proposal. Thank you for your consideration of Gaylor, Inc. We look forward to meeting your needs. Sincerely, Gaylor, Inc. Daniel F. Spence Project Manager PROPOSAL ACCEPTANCE: ADD: ACCEPTED IN THE SUM OF $412 THIS DAY OF 20 FOR BY COMPANY NAME AUTHORIZED AGENT NAME TITLE NOTE: This proposal is valid for 30 days from the proposal date or until work has progressed to the point that this proposal would not be valid. Please sign and return the original proposal and retain a copy for your files. Page 1 of 2 Date: 9/30/2009 Time: 10:37 AM September 30, 2009 Number: CP #64 SCOPE OF WORK FOR: RFQ #XXX/CP #64 Alterations, specifications, remarks and exceptions are as follows: 1. No cutting or patching of the existing surfaces are included, if applicable. 2. Sales Tax is not included. 3. All work in above quote is based on straight time. NOTE: The above price is based on attached WO #3137. See attached WO #3137. for scope of work. Page 2 of 2 Date: 9/30/2009 Time: 10:37 AM CHANGE PROPOSAL PRICING SUMMARY Project CCC Energy Center RFQ #XXX/CP #64 Division Electrical DATE 9/30/2009 Contractor Gaylor Page Trade Labor Labor Material Equipment Subs Breakdown Classification Manhours I Rate Cost/Credit Cost/Credit I Cost/Credit Cost/Credit W0#3137 Electrical 7 45.33 317.31 57.12 13.13 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 Electrical 45.33 NET TOTALS 7 45.33 317.31 57.12 13.13 NET TOTAL LABOR COST OF 317.31 x 1.10 349.04 NET TOTAL MAIL COST OF 57.12 x 1.10 62.83 NET TOTAL EQUIPMENT COST OF 13.13 x 0.00 NET SUBCONTRACTOR COST OF x 1.05 NET SMALL TOOLS COST OF 317.31 x 0.00 (BARE LABOR COST) NET TOTAL SALES TAX 70.25 x 0.00 (BARE MAIL COST) BOND COSTS 411.87 x 0.00 TOTAL COST 412 G"LOR 3137p� ADDITIONAL W REPORT G CLIENT I 6 DATE D CLIENT'S AUTH. NO. E. W. NO. C/ CLIENT'S P.O. NO. CONTRACT NO. DESCRIPTION OF WORK: CP4kW S TZ� (9 y E GAYLOR CLIENT W. O. NO. JOB NO. CLASSIFI- ST TIME 1 1 /2 TIME DOUBLE CATION RATE HOURS HOURS TIME NAME HOURS 7 1 EQUIPMENT EQUIP. NO. DESCRIPTION HOURS RATE -3 wn4 S Z7-7-q, WHITE COPY TO CLIENT APPROVED: CORRECT: YELLOW COPY TO GAYLOR OFFICE. PINK COPY CLIENT FIELD REP. GOLD COPY GAYLOR FOREMAN CLIENTS REPRESENTATIVE GAYLOR REPRESENTATIVE Prescribed by State Board of Accounts City Form No. 201 (Rev. 1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Purchase Order No. i 91 97 7 Terms Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 0)3009 91977 6 3y &6,7 1 YI2 0 c Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 l hallt I I I- I Clerk- Treasurer VOUCHER NO: WARRANT NO. ALLOWED IN SUM OF �0 76 ON ACCOUNT OF APPROPRIATION FOR Board Members PO# or INVOICE NO. ACCT #/TITLE AMOUNT DEPT. I hereby certify that the attached invoice(s), or y.Oa bill(s) is (are) true and correct and that the y�2DD materials or services itemized thereon for which charge is made were ordered and received except �U Z6 20 Si ature Direct o f Cost distribution ledger classification if t itle claim paid motor vehicle highway fund