HomeMy WebLinkAboutCorrespondenceF X* ¥ii il.6tiii6'.$iOil.
From:
Hamilton County Soil and water Coaservation Dis~t
92,S Division Stro~ Room 103 .
Noblesvill=, IN 46060-2744
Natural Resources Conservation Service 0~RCS)
925 Division Street Room I03
Noblesvillo, IN 46060-27~4
This transmission has /.
pa~s, irmludin§ this c~vcr sheet.
Comm~nls:
Contact: ~-. -s'~o r-~/
Phone: (317) 773-1406
(317) 776-1101
Date:
To:
CITY OF CARMEL
DEPARTMENT OF COMMUNITY SERVICES
TRANSMITTAL
From'.
Mark T. Monroe, AICP
Department of Community Servic. es
One Civic Square
Carmel, IN 46032
ph. 317 571 2417 fax 317 571 2426
~f' The material you requested c'l For your information
~'q For t~view and comm~ut r-I For approval
Quantity/Description
Remarks:
Copies to:
s Aforrns\ttansmit
City of Carmel
DEPARTMENT OF ENGINEERING
March 26, 1999
Mr. John Oberlies
John Oberlies Consulting Engineers, Inc.
10 South New Jersey Street
Indianapolis, IN 46204
RE: Lakeview Landing Post T.A.C. Review
Denr Mr. Oberlies:
As prmnised, we have reviewed the comments from the Technical AdvisoE¢ Committee meeting on March
17m with City Engineer Kate Boyle-Weese. There were two issues from this meeting, as follows:
The alignment of the proposed entrance/exit on the South side of Cannel Drive in relation to the
existing entrm~ce/exit for the Arbors apamnent complex on the North side of Cannel Drive.
The City Engineer does not have a problem with a slight mis-alignment of these two drives (No more
than three (3) feet centerline to centerline).
The requested inslallafion of aeeel/decel lanes at the shared entrance/exit on the South side of Carmel
Drive.
The City Engineer believes this is a reasonable and valid request for this site and will recommend
this installation. As stated in the TdI.C. meeting, we did request installation of acoel/decel lanes for
the Keltner Developmen6 which also exists on the inside ora curved section of roadway. Combined
with the speed and volume of traffic on Carmel Drive, we feel this request for aecol/decel lanes in
this case is both justified and necessary for the safety of all motorists, including those utilizing your
proposed sit~ Perhaps more so because this is a shared drive serving two developments and the fact
there is a bank involved that willgenerate ~4ftlonal traffic utilizing this entranc~ While it is the
intent to recommend this installation as a condition of the curb cu6 the Board of Public Works and
Safety will make the final decision.
If you lmve questions, please call.
Sinc~ely, /~
Dick Hill, Assis~mt Director
Department of Engineering
Enclosures
CCi
M. Kate Boyle-Weese, City Engineer
~,Mark Monroe, Department of Community Services=
Craig Parks, Assistant City Engineer
S:\PROJRE V99~LAK ELAND2
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/57 D2441
Civil · Sanitary · Mechanical · Eleot rical
March l7, 1999
TaCtical Advisory Committee
City of Carmel
1 Civic Square
Carmel, IN 46032
Lakeview Landing Project Review
Carmel Science & Technology Park, Block 4
805 West Carmel Drive
$OCEI Project No.: 99013
Dear Committee:
The following are our curre~ responies to the comments provided by the various reviewing agencies
reccived as of this date.
Hamilton County Soil & Water Conservation District:
I.B
The project involves the construction of office and/or retail space as a commercial
development, it includes the construction of the building% parking areas and
associated utilities.
2.A
The existing vegetation is shown on the wpographic survey, Sheet 1' of 1. This
includes the delineation of the trees.
2.B
There is a lake on the site which is a storm water detention pond and is identified as
"Lake #2" on'the Master Plan for the Cannel Science & Technology Park.
2.G
The immediate'receiving water for this project is Lake fi2, as described' above. It is
believed that the ultimate receiving water is Cannel Creek.
2.H
We do not believe there are potential areas where storm water may enter the ground
water other than the existing storm, water detention pond described as Lake #2
3.A The construction limits are shown on the Landscaping Plan, Sheet I,-1.
3.B
We expect that disturbed topsoil will be trucked offthe site and that there will be no
borrow areas on this site.
10 South New Jersey St., Suite 320, Indianapolis, Indiana 46204 - Phone: (317) 636-3941 · Fax: (317) 636-3963
Tactical Advisory Committee
City of Cannel
March 17, 1999
Page 2
4.A We expect project construction, including earth disturbing activities, to start
approximately May 1', 1999. We expect Silt fence erosion control measures to be
installed immediately upon the start of construction. We expect inlet protection
erosion'control measures to be installed immediately upon inifial~c0nstmction of the
inlet structures. This will likely take place, weather p~mitting, within, two (2) to four
(4) weeks of the start of initial construction.
4.B The Contractor shall be required to monitor and maintain the erosion control
measures On a no less than biweekly schedule.
4.1 A stable construction entrance has been added to.the Plans, Sheet C-1.
Department of,Community Services:
The'Owner will submit copies of the List of Adjacent Property Owners for Public Notice.
DEVELOPMENT PLAN \ ADLS:
.The City Engineer's Office supplied traffic count information, dated March 19, 1992, to the
Owner as follows:
Cannel Drive: Guilford to OldMeridian Street
Cannel Drive: Guilford tO .Range Line Road
6,222 vehicles
11,838 vehicles
We believe, the alignmen~ between the proposed 'curb c~at and the existing cut across the street
is very cl0se~ We are requesting that we be provided with more detailed survey information
to assure that the location of the cufocuts match.
A piece o£ sidewalk from the street sidewalk to the building complex has been added to the
plans as well as a stripped path across the asphalt paving.
The'Landscape Plans are addressing the requested fifteen foot (15') landscaped strip.
The Landscape Plans are addressing the requested foundation plantings.
The LandsgapePlans are addressing the requested shrubs along the parking lot, in front of
Carmel Drive.
Tactical Advisory Committe~
City of Carmel
March 17, 1999
Page 3
The Architect is providing colored elozation drawings of the building and providing the other
information regarding elevations and materials.
The Site Lighting Plan has been adjusted to avoid a spill over of ligl~ onto Carmel Drive,
greater than 0.3 foot candles.
The Owner and the Architect are addressing the requirements for signage,
The Architect is addressing the requirements for fencing details around the dumpster.
Indianapolis Water Company:
The drawings have been changed to show dual one inch (1 x) meter pits as suggested.
Department of Engineering:
It is intended to address these comments at the TAC meeting to be held on Marsh 17, 1999.
We appreciate the comments from these groups. We.intend to resolve them to the satisfaction of all
parties, as quickly as possiblel
Very truly yours,
JOHN OBERLIES CONSULTING ENGINEERS~ INC.
John W. Oberlies, Ir., P~E.
JWO:jbw
cc: Jon Altmarg Stamp-Airman Asso~ates
Dale Ankrom, DEA, Inc.
83/16/19~.q 04:87 317-844-9283
Mark Mofle0e
Carmel []ept of Community
One Civic Square
Cannel. IN 46032
O~r
Regaining the agenda items fat' the I~tcll
~ ~ u~. C~S am in~ on~ for
Pf~s ha~ ~m ~bm~ to the ~= bm a ~ ~ has n~ ~efl ~mp~ed.
~i~ ~ ~uM nM be i~
Tllamp~en NW
Plans have been submilted to the DiWicl but are not sufl~e~tly ~ilecl. The saMtenj,
conn~tion cannot acM. ss the exi~ng line I~ must uae an exl~ng lateral stub or tie
into a manhole~ C~he~ condleons may a~o apply. 8u~Jing permits should not be issued
Lakeniew Landing
Plans MMe been subntilted to the I:Y~ttt~t IxA are not sUffl~erttly detailed. The sanlta~
mnm Camlot access the exJding line ~ must uae afl e~ing lateral stub or tJe
inlo a manhole, Omar cond~ons may also apply. Building pemnlts should not be isaued
without payment of a~ requinm District fees and ~ssuance of ~ District's permit,
Hamilton Cm~ing Bailding S
Plans Ilave been submited to the OiWlet but need to be reviewed tnj Samuel L. Moore
& AssoolMe~ before ~ey can Ioe approved. Building perm~ should ~ I;e issued
wtthoul payment of all required DMrtc~ fees and is~uaflce of the Distrtot's permit.
GibrMtar Properties
Concept plans have ioeen submitted tO the Distdd bu~ are nOt suffic~enlly detalleCl with
mspec~ to sanitary sewer sew~oe. Plans.nL~d to be revieY~d by Samuel L. Moore &
Asao~ates Defore they can be approved. Building permits =hould ~ot be lssa~d wiU~out
p~mem al .Il required District/ess and issuance of the Distf~t's pen~t.
Calmdmt Walk Subdivision
Comments provkle~ IXe~Aoualy; no objec~en.
P.O. Bex40638 · Indianapolis, Indiana a62A0'0638 · (317JsA~.9200 · Fax (317)8d.~-9203
.pa~2
Hommr Heights ~hd~livtsio.
No plam~ trove b~en sula'nltted for nw4ew.
Plans have been submitted to the Oistd~ but are not suff'~en',Jy detailed. The sanitary connection
cannot ~ bhe existirl0 rme but must use an eaisltn0 latentl stub or tie intn a manhole. Otlm~
conditlm~ m~, al~o appb~. Bulldtn~ ~ ~ n~t be issued without p~ymem of ~11 rm:luimd
~ fees and tssum~,e of
Please note that the District is a member of 1he Indiana Unc~eigrounO Plant protection t3en~c~
{1UPP$), AIl requests for uU1ity Iocate~ for our fncllilles should now I~e dim(ted to IUPP$ at 1-600-
382..5,544.. Please let me know ii' you have any ~ns or need ndditional infon'natjon.
o. Ron gaurltsen, StoMA
City of Carmel
DEPARTMENT OF ENGINEERING
March 12, 1999
Mr. John Oberlies
John Oberlies Consulting Engineers, Inc.
10 South New Jersey Street
Indianapolis, IN 46204
RE: Lakeview Landing Project Revie*v
Dear Mr. Oberlies:
We have reviewed the plans submitted to this office on February 24, 1999. We offer the following
comments:
1. Streets - City of Carmel jurisdiction.
2. Water- Indianapolis Water Company jurisdiction.
3. Sanitary Sewer- Clay Regional Waste Districtjarisdiction.
4. Storm Drainage - Hamilton County Surveyor and City of Carmel.
5. This project will require Board of Public Works and Safety Commercial Curb Cut approval
6. Plan Commission approval of the project is required prior to Board of Works submissions.
7. Provide a Cerlifled Eugincers Estimate and Performance Guarantees for sidewalks in the Carmel Drive
right-of-way. Guarantees reust be posted prior to Board of Works approval of the plat. The plat must
be recorded to obtain a building permit.
8. If Lots # 1 and #2 are platted together, a Performance Guarantee must be posted for sidewalks in the
Cannel Drive/Hancock Street fight-of-way of Lot #2. Are we to assume Lot #2 is future development?
9. Street Cut/Right-of-Way Permits and Street Cut Bond requirements.
Commercial Curb Cut - (1) ~ $2,000.00
Sanilary Sewer- (1)~ $2,000.00
Water Main - (1) ~ $2,000.00 (Cannel Drive must be bored)
10. Please provide drainage calculations.
11. Label the right-of-way on the plat as 45 foot half.
12. Buildings, pavement and permanent s~'uctures are in easement. Have you obtained approvals from
Hareilton Comity for these encroachments?
13. It appears the drive is a coremon drive tlmt will serve both Lot #1 and Lot #2.
14. Doe to the curved section of Carmel Drive at the eutrance/exit to this developmeut ired due to safety
concerns, we request the installatiou of acel/decel lanes on the south side of Carreel Drive.
15. Provide (3) sets of Certified Construction Drawings for approval signatures from tiffs office. Drawings
submitted reast include all revisions.
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317157D2441
Mr. John Oberlies
March 12, 1999
Page 2
I am including data regarding Engineering Department requirements for commercial projects. I am also
including a handout from our Building Permils Department regarding building permit procednres for aew
structures and additions. Please share fids information wilh the ownerrddevelopers iuvolved wilh tlds
project.
If you have questions, please call.
Sin?7 ///
Depaxtmen! of Engineering
Enclosure~
cc: M. Kate Boyle-Weese, City Engineer
M. ~.~,.M.o~m-oe,~Depamnent of Commuuity:Services
Craig Parks, Assistant City Engineer
$:\PRO JRE V98'~LAKELAN D
Stephen C. Engelking
Director
Mr. John Altman
Stamp-Altman Associates
6219 Cmilford Avenue, Suite B
Indianapolis, IN 46220
City of Carmel
DEPT. OF COMMUNITY SERVICES
March 11, 1999
Re: Carmel Science & Technology Park, Block 4 Seconda~ Plat, Development Plan, mad ADLS
Applications for the Lakeview Landing Center
via facsimile
Dear John:
Our office has reviewed the Secondmy Plat, Devdopment Plan, and ADLS applications filed
by Carmel Drive Associates for the Lakeview Landing Complex located at the southeast comer of
Carmel Drive and Hancock Street. The following are cemments that need to be addressed and plans
updated accordingly:
Applicati~rts:
applications are complete as filed.
ffTwo copies of the list of adjacent property owners to be publicly noticed need to be
sobmitted.
Se condar~ Plat :
~r No comments regarding the plat at this time.
Developnjent Plan/ADLS:
Ig~aeneral traffic trip generation data needs to be submitted for peak hour traffic.
~' The proposed curb cut locations will need to be reviewed in detail. The proposed curb
c~ should align with the existing cut across the street for the apartment complex.
V'The exterior sidewalk should connect fi.om the street to the building by virtue of a
striped path, brickpaver path or other suitable means.
{~A fffieen-foot landscape strip is required along the perimeter road unless a suitable
alternative can be provided.
~, Foundation plantings are required around the front of the building (dimension to be at
")east 25% of the height of the building). Please show these areas on the landscape plan.
ff The Department recommends adding a low line of shrubs along the parking lot in front
coCarmel Drive.
lor elevation drawings of all sides of the building need to be submitted. Any roof-mounted
mechanical equipment should be shown on the elevation drawing. The proposed materials of
~ige building will need to be nresented at th~ Plan Commission meeting,
l~t intensity readings along all property lines including the Camel Drive property line
ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417
Page 2 of 2
~Coe not to exceed 0.3 foot candles.
lored elevations of all proposed signage need to be submitted. Also, the mounding for
the center identification sign required Plan Commission approval if it is greater than 10%
slope. The ground sign is required to have an area of landscaping around it at least equal
to the size of the sign. Only one sign is allowed per tenant (the elevation drawings show
two signs for the bank)Any signage for this project, if approved, will require permits
tv/tAn~AnyOUgh.this department.
fencing details including the dumpster fencing needs to be shown on the plans.
If not akeady done, please distribute the plans to the members of the Technical Advisory
Committee immediately in preparation for the March 17th meeting. Our office will need to receive a
copy of any correspondence fi.om the committee members. Once the previous comments have been
addressed and plans updated and reviewed by our department, a docket number can be issued for this
project.
If you have any cormnents or questions concerning this matter please do not hesitate to call me
at 571-2417.
Thank you for your fane and consideration.
Sincerely,
Mark T. Monroe, AICP
Planning Administrator
Department of Community Services
cc: Dale Ankrom, DEA, Inc.
92.f Division~_Su'ect
Noblcsville, IN 46060-274g
Ph. 017)773-1432
Fax (317)776-1101
Drainage, Erosion and Sediment Control Plan
Technical Review and Comment
Project Nume:
Submitted
Plan Review Procedure: Site Visit Date:
Location: (~L .~:/~,~,£~ ,~ -~-~c~.
Legal Description: --~C. 3~-'
Plan Review Date:
Civil Township: cz.~K
The technical review and comments are intended to evaluate the completeness of th~ erosion and sediment control
plan for the project. ~ erosion a*M sediment control plan submitted wa~ not reviewed far the adequacy of the
engineering design, dll ptactices included in the plan, os well as those Peeommended in the comments shouM be
evaluated as to their feasibilio, by a qualified individual with structural precticas designed by a qualified engineer.
The plan la~ not been reviewed for local, state or federal permits that may be required to proceed with this
project. ~dditional informatiot~ including design calculations may be requested to further evaluate the erosion
~ediment control pla~
The erosion and sediment control plaa has been reviewed and it has been determined that the plan:
D
Satisfies the minimum requirements and intent of 327IAC 15-5 (Rule 5). Noti .f. ication will be forwarded
to the Indiana Department of Environmantal Management.
Refer to the comments section for additional information.
Does not satisfy the minimum requirements and intent of 3271AC 15-5 (Rule 5); deficiencies are noted in
the ebeeklist and in the comments section. Deficiencies constitute potential violation of the role and must
be adequately addressed for compliance. The information necessary to satisfy the d~ficicncies must be
submitted: . Please address revisions to abe reviewer.
IProper implementation of the erosion and sediment control plan and inspections of the cbnstruction site by the
developer or a representative are necessary to minimize off-site sedimentation. The developer should be aware
that unforeseen construction activities and weather conditions may effect the performance ora practice or the
erosion and sediment control plar~ The plan must be a flexible document, with provisions to modify or substitute
practices os necessary.
Page 2 of z7
ARE THE FOLLOWI~'G ITEMS ADEQUATELY ADDRESSED ON 'l'ku~ PLANS
(Ail Plans Mu~ Include tl£propriate Legends, Scales, and North Arrow)
(Items tha~ are l~ot .4ppllcable to thix Proje~ are designated by N/J)
Yes No
~ O IA
0 ~c
PROJECT INFORbIATION
Projee~ Locatio- Map (Show~oro/ect in rdatlan ~o o~h~r areas of me ~)
Na~6~ D~Hb[~ ~c Na~m ~d ~o~ of lhe
~fion of Pl~n~ ~or E~ng Roads, Udliti~, Stmc~, ~gh~y~ ~.
~t ~0r B~ldln~ ~0~
L~du~ of Adja~t ~
(Sho~ the ~ff~ U~m g&t~h~ and Adjacmt Ar~s [gilhin 500 F~ of
Yes No
0 ~ 2B
[] 0 2C
g] [] 2E
1~ 0 2F
0 [] 2G
[] M 2H
(~ [] 21
TOPOGRAPHIC, DRAINAGE, AND GENERAL S1TE FEATURES
Existing Vegetation ( ldentify and Delineate )
Location and Name of AH Wetlands, Lakes and Water Courses On and Adjacent to thc Site
I00 Year Floodplains, Floodway Fringes, and Floodways (Note if None)
Soils Information ( If lodd¢ soib are pres~mt, it i~ the r~ponsibiliO, of the owner/doelo2~r to
inve~n'gate the ~cfst~ce of wetlands and to obtain permits from the appropriate government agencie, r.}
Existing and Planncd Contours at aa Interval Appropriate to Indicate Drainage Patterns
Locations of Specific Points Where Stormwater Discharge Will Leave the Site
Iden~ty All Receiving Watcr~ ( If Discharge i~ to a Separate Mwnicipal ~tonn 8~. Idenn'fy the
Name of th¢ Municipal Operator and the Ultimate Receiving Water)
Potemtlai Areas Where Storm water May Enter Groundwater (Rote if None)
Location of Stormwater System (Include Culverts, Storm Sewr~o Channds, and Swalez)
Yes No
0 ~ 3A
0 ~ 3B
LAND DISTURBING ACTIVITIES
Location and Approximate Dimensions of All Disturbed Areas [i.~, Con~tntca'an Idmit~]
(drea~ Fgh~re Vegetative Cover ~ill Be Pr~erved Should be Clearly De~ignatetO
Soil Stockpiles and or Borrow Areas (ShowLocations or Note if None)
Ecg
0
[]
[]
[]
No
[]
O
[]
0
0
O
O
O
[]
4A
4B
4C
4D
4E
4F
4G
4H
4I
43
4K
EROSION AND SEDIME~ CONTROL MEASURES
Sequence of When Each Measure Will Be Implemented (Rdative to Earth DLffurbingAcMvitle$)
Monitoring and 1g[aintenanee Guidelines for Each Meamre
Perimeter Sediment Control Measures (Location. Construction Detail, Dimen~iota% and $lw~ifications)
Temporary Seeding ($peeificatians: Including Seed Mir. Fertilizer. ldme, and Mulah Rate~)
Temporary Erosion and Scdlment Control l~[easuroz
(Location. Co~.~truction Detail, Dimensions° and $1~cificatiot~)
Permanent Erosion and Sodimcat Control Meamres
(Location. Con$tructian Detail. Dim~sions, and Speci~cations)
Storm Dtndn Inlet Protection (Locmion. Con,~ntctlon Detail. Dimensiord. and Specificati°nS)
Stormwater Outlet Protection (Location. Conrtruction Detail. DimenMon$o and Sj~eificotions)
Stable Construction Entrance (Lacat/on. Con~tntction Detail. Dime~sion~. and Specification~)
Erosion and Sediment Control on Individual Building Lots ($pecifcntian$)
Permanent Seeding (Specifications: Including Seed Mix. Fertilizer. Limg and Mulch Rates)
EROSION AND SEDIMENT CONTROL PLAN.
TECHNICAL REVIEW
COMlVtENTS
Project:
Page 3 of
Note: Ail erosion and sediment control measures shown on th, e, plans and referenced in this review must me~t the
design criteria, sta, n, dards, and specifications outlined in the Indiana ttandbook for Erosion Control in
Developing Areas from the Indiana Department of Natural Resources, Division of $oil Conservation or similar
Guidance Documents.
City Carmel
Fire Department Headquarters
2 CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2600
Stamp - Altman
Attn. Jonathan E. Airman
6219 N. Guilford Avenue
Indianapolis, Indiana 46220
RE: LAKEVIEW LANDING
LETTER OFAPPROVAL
The undersigned has reviewed the proposed plans for
Lakeview Landing
and has approved the plans subject to the following:
1. Install a Knox Box on each building at a location approved by the Carmel Fire
Department.
o
°
Date:_Febmary 26, 1999__
By: Stanley PuckeR, Fire Marshal
Cannel Fire Department
Fire Prevention Saves Lives and Property
Camel Police De,pavement
February 25, 1999
Mr. Jonathan E. AJtman
Stamp-Altman Associates, Inc.
6219 N. Guilford Ave.
Indianapolis, IN 46220
RE:
Development Plan Submittal
Lakeview Landing
805 W. Carmel Ddve
Carmel, IN 46032
Dear Mr. Altman:
I have received and reviewed the development plans of the above
mentioned project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
Michael D. Fogarty
Chief of Police
MDF:vb
cc: Mark Monroe, Dept. of Community Services
A Nationally Accredited Law Enforcement Agency
1~17) 571-2500 F~ ~317) ~71-25t2
$
Christine Crull Altman
Attorney at Law
April 13, 1999
Mark T. Monroe, AICP,
Planning Administrator
Department of Community Services
City of Carmel
One Civic Square
Cannel, Indiana 46032
RE: Carmel Drive Associates, LLP Docket Nos:
20-99 DP/ADLS AND 21-99 SP
Dear Mr. Monroe:
Enclosed please find the following documents evidencing the petitioner's
compliance with notice requirements for the April 20, 1999 Carmel Plan
Commission meeting:
1. Petitioner's Affidavit of Notice of Public Hearing;
2. Proof of Publication issued by the Daily Ledger;
o
Return Receipts for notices directly mailed to adjacent property owners via
certified US Mail (with the exception of land owners Carpenter Co Inc. and
Richard J. Carriger which have not yet been returned); and
4. Receipts for Certified Mail for Carpenter Co Inc and Richard J Carriger.
I believe that these documents are all that you need with regard to the
above public hearing. If additional information is needed or you have any
questions, please advise. Thank you for your assistance in this matter.
Very ~tp~ly/y~urs, /~/~
cc: Carmel Drive Associates, LLP
13255 Arden Court, Carmel, Indiana 46033
Telephone (317) 575-0599 · Facsimile (317) 844-2936