Loading...
HomeMy WebLinkAboutCorrespondenceRealty Investments HAMILTON CROSSING BUILDING 5 13000 NORTH MERIDIAN STREET HAMILTON CROSSING - CARMEL, INDIANA CARMEL CLAY PLAN COMMSSION DOCKET NUMBER 22-99DP AMEND/ADLS APRIL 20TM, 1999 TABLE OF CONTENTS Schematic Plan Showing Location of Building 5 Development Plan Application 1 Application for Architectural Review Design, Lighting and Signage 4 CONSTRUCTION PLANS Title Sheet 6 Site Plan (C2) 7 Grading Plan (C3) 8 Erosion Control Plan (C4) 9 Utility Plan (C5) l0 Sanitary Sewer Plan and Profile (C6) 11 Road Plan and Profile (C7) 12 Details (C8-C9) 13 lllumination Plan (Cf0) 15 Landscape Plan (C11) 16 Building Elevations 17 Golden Section Proportion Exhibit 21 ~ C iI~ E p~RTM~O~oMMC~ ~ I~YER¥ IC ~m~el June 5, 2002 Mr. Blair Carmosino Duke Construction 600 East 96th Street, Suite 100 Indianapolis, IN 46240 RE: /Hamiit~-n-~o~ gulldiflg-#_~5?Landscape Plan Dear Mr. Carmosino: These comments are based on review of plans received in this office on April 29, 2002, and reflect my comments made in the TAC Meeting in May, 2002: Please confirm the final width of the planting stripgoufferyard on the east and northeast sides (along the U.S. 31 Highway ramp fight-of-way) with Jon Dobosiewicz. I believe that his determination was that it needed to be at least 15 feet in width. This planting stripfoufferyard (about 600 feet in length) should be planted using Bufferyard Design Standard D (bordering Expressway or Highway - 5 shade trees, 5 ornamental trees and 27 shrubs {or 9 evergreens} per 100 linear feet). Bufferyards and/or planting strips on the south property perimeter and along the drive on the northwest side should meet the minimum base planting unit requirements found in 23B.10.2.B(5) of the U.S. 31 Overlay Ordinance. The west perimeter bordering Hamilton Crossing Boulevard and your parking lot should meet Bufferyard Design Standard B ( 3 shade trees, 3 ornamental trees, and 15 shrubs {or 5 evergreens}). These requirements are in addition to those for the foundation plantings and the interior parking lot plantings. Those shrubs required for parking lot interior should be planted somewhere on site if not planted in the parking lot islands. The parking lot islands should not be planted with sod, but rather mulched or planted with a ground cover. Sod will be hard to maintain (and an additional mowing expense) due to the shade of the maple trees and compete with the trees for water, root space, and nutrients. Hawthoms- trees with thorns should not be placed within 15 feet of a path, street, or parking lot as a safety concern. Thoruless hawthorn varieties are subject to a number of disease and insect pests. They require an extra amount of care, and may have to be replaced within a shorter period of time. ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 Page 2, Hamilton Crossing #5 Please reply to these comments in writing and by amended plan. Please contact me at 317-571-2471 or by email at Sbrewer~ci.carmel.in.us, if you have any questions. SincerelY., , ~7 Scott Brewer Urban Forester, City of Carmel CC: Jon Dobociewicz, DOCS Brant Kercheval, Duke Corp. If enclosures are not received as noted below, WOOLPERT please call sender or Woolpert at 317.299.7500 Date: March 19, 1999 Re: Hamilton Crossing Building 5 To: Mark Monroe City of Carmel Department Community Development One Civic Square Carmel, Indiana 46032 Order Number: 56592.01.083 Shipped Via: Personal Delivery We are sending you [] Shop Drawings [] Other [] Samples [] Specifications [] Plans [] Change Order Copies Date No. Description 3 1 Revised Demolition Plan 3 1 Revised Site Plan 3 1 Revised Landscape Plan Remark: Please find attached the revisions for the Hamilton Crossing Building 5 as requested in the TAC meeting 3/17/99. ff you have any questions, please contact me. Copy To: File Signature: David A. Lach WOOLPERT LLP 7140 Waldemar D~e Indianapolis, Indiana 46268-4192 317.299.7500 Fax317.291.5805 www.woolperLcorn D3/16/19~9 84:07 :317-844-92~']3 Diana Crimea,s, Jackt F.~waM~ b~ Ii. nme Camm~ Dept o~ ¢ornmunily Set.ss o~e civta .~luare Carmel, IN 460~2 De~r Mark: I~ing t~e agenda ~ for ~he Mmcfl 17, 1~ TAC ~ng, ~ off~ ~e ~1~ ~ ~r ~. Co~ am In~ ~ ~r t~ p~ ~ am ~ in the O~ ~ ~ ~ A~ ~i~g P~ ~ve ~ ~ ~ the DI~ ~ a ~ ~ h~ ~ been campl~. ~iflg ~ ~ ~ be ~ ~o~ pAymem ~ mi ~ ~ ~ ~d i~ of the D~d~'s ~ have bee~ sul~;~;;.l=d to ~h- Olotricl but me nM .~f~Jerdly detailed. The sanitm'/ ~ cannot at. ss tim axbling ,ne but must use ~ e~ds~g MtMaJ stub of manhole. ~hm cond#lons may mso apply. Building permits ,~ould nm be ~sued wll~oul paym~t Mall reflulmd DisMct ~ees ~md Issuance of me IDIMn~t's penmit, Plans h~ve I~e~ sul~d~ed to the Disldot but are not sufficient/detaile~. The cormecUon (arm~ access the ex~ line but must use an e:d~ing la, emi stub or fJe into e manlmle. Omer con~ons may ~lso apply. ~uflding bem~s shou~l ~ot be issued without payment M ali requir~ IAslrict fees and issuance o/the District's permit, Hamll~n Cro~ng Building ~ Plans have been submitted to the ~ but need to be reviewed by Samuel L. Moore &/~,oc4mes be/ore mey can l~e appmvecl. Bu:Ccling permito should ~ be issued witho~l pe~Mtt of all ;eClUlr~ District fees Lqd issueace of the I~tr~'s pemdt. Con(apl plans have been submitted tO the Dist~ct I~t are not sotficientJy detmle~ with respect to samta~y sewer servme. I~ano. need to be mv~'~,~-~cl by Samuel L Moore & As~:~ates before they can ue approved. Building pem~its should ~ot be ~ without paymem at ell requirm:l Di~lnct lees ar~ .'_~_~_ ,ence of the Distfiot's permit, Comments IXnV~Cl ~v~ously; no o~ecaon. P.O. Box 40638 · Indianapolis, fncliorm 46240-0638 · (317) 844.9200 - Fax (317) 844-9203 M~rk Monm~ ~ 16 '~ 07:~7FT4 P.1×1 Marea 16. 1999 Blair Carmosino Duke Construction Re: Hamilton Crossing Bldg. 5 I have reviewed the plans for this project and have the following comments. 1. The JR ColLins Drain is located on Otis site. About ten years ago, thc original Collins Drain was reconstructed and rerouted along 131 ~ and thcn South to thc detention ~e~m, The old lile was then abandoned. As shown on the plans, the old tile is still located on the site. When encountered, the tile should be intercepted at the upstream end of the site and crushed or t~ovcd. 2. An Outlet Request Permit is requin~d for stonnwater disoharse to the drain. 3. A Non-enforcement Permit is required for where the parking area encroaches on the ~Illent. 4. Trees and landscaping mounds will not be permitted over thc pipe. If you have any questions, please feel free to contact this office at 776-8495. Sincerely, Reviewer March 16, 1~ Blair Carmosino Duke Construction Re: Hamilton C~o~ing Bld~. :5 I have reviewed the plans for this project and have the followi~ commen~s, 1. The IR Collins Drain is located on this site. About ~'n yem's ago, thc oggln~! Collins Drain was reconstruou:d and rerouted along 131 ~ nd then South to the detention area. The old tile was then ab~doned. As shown on the plans, tho old lilc is still located on the site. When encountered, ~ tilc should be intcrccptecl at the upstream emi of the site and orushed or rguaoved. 2. An Outlet Request tSgrmi~ is req~ for stormw~er dis~e ~o tl~ drain. 3, A Non-~n~orcem~t Permit is required for where the parking area encroaches on the 4. T~es md landsc~ing mou~ls will not bo permitted over thc pipe. If you have any question~, please feel t~ to conto~ this office at 776~5. Sincerely, Plan Reviewer Cc: Cannel DOCS NR. CS Woolpert City of Carmel DEPARTMENT OF ENGINEERING March 11, 1999 Mr. Blair D. Cannosino, P.E. Dlflce Construction 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 RE: Hamilton Crossing Building//5 Project Review Dear Mr. Canuosino: We have reviewed the plans submitted to tiffs office on February 24, 1999. We offer the following comments: 1. Streets (131't) - City of Carmel jurisdiction. 2. Water Mains - Indianapolis Water Company jurisdiction. 3. Sanitary Sewers - Clay Regional Waste District jurisdiction. 4. Storm Drainage- Hantilton County jurisdiction. 5. Please provide fids depamnent a set of drainage calculations. 6. Are you dedicating existing Hamillan Crossing Boulevard with lifts new construction? The Depa~lment of Engineering has been advised that private streets will not be allowed wiflfin corporate limits. 7. The pavement section of the new Hamilton Crossing Boulevard does not meet our mil~imum standards should you plan on dedicating the street. 8. What is file back of curb to back of curb dimension of Hamilton Crossing Boulevard? 9. What is the right-of-way dimeusian of Hamilton Crossing Boulevard? 10, What is lhe driveway indicated at file north properly line on 13 Pt? Is this to remain? 11. Are you dedicating additional rigilt-of-way for 13Pt Street within your boundaries? 12. If Ibere is additional right-of-way dedicated, the path/sidewalk should be witifin the right-of-way. 13. Is there any work to be done on storm pipes within the right-of-way of 13 pt Street? 14. You should be aware the City of Cannel anticipates working with 1NDOT regarding the possible construction ora bridge over/under U.S. 31 at 13Pt Street. If you have questions, please call. Si, n//~lTY' j// Dick Hill, Assistant Director Deparunent of Engineering CC: M. Kate Boyle-Weese, City Engineer 19Iark~MonroecDepartSne'nt-of, Comma~ity~s~r~i~ Craig Parks, Assistant City Engineer Jim Tully, Woolpert LLP S:\PROJRE V99kH AMC RO S$#5 ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2441 City of Carmel Fire Department Headquarters 2 CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2600 Duke Construction Attn. Blair D. Carmosino, P.E. 8888 Keystone Crossing, Suite 1100 Indianapolis, Indiana 46240 RE: HAMILTON CROSSING V LETTER OF APPROVAL The undersigned has reviewed the proposed plans for Hamilton Crossing V and has approved the plans subject to the following: I. After review of this project, I have no additional requirements to be met at this time. Date: March 10, 1999 By: Stanley Puckett, Fire Marshal Cannel Fire Department Fire Prevention Saves Lives and Property 92.5. Division~.Street bloblesville, IN 4fi060o2744 Ph. 017) 773-1432 Fax (317) 776-1101 Drainage, Erosion and Sediment Con~xol Plan Technical Review and Comment Project Name: Submitted By:. Reviewed By: Plan Review Procedure: Site Visit Date: Location: .5. k~, ~,~',~ Legal Description: 2~ ~ea. Z Township: 7': Plm Review Date: /$/e~ 'e GSa/ Range: Civil Township: The technical review and comments are intended to evaluate the complete, ness ofthe erosion and sediment control plan for the project The erosion and sediment control plan submitted wa~ not reviewed for the adequacy of the engineering de~tgta dll practices included in the plan, as well as those recomme.~d_ed in the comments should be evaluated ar to their feasibility by a qualified individual with structural practices designed by a qualified engineer. The plan hag not been reviewed fer local, state or federal permits that may be required to proceed with this project. '~dditional information, including design calculations may be requested to further evaluate the erosion sediment control plea The erosion and sediment control plan has been reviewed and it has been determined that the plan: [-1 Satisfi~ the minimum requirements and intent of 327IAC 15-5 (Rule 5). lqoti~cation will be forwarded to the Indiana Department of Environmental Management. D Refer to the comments section for additional information. Does not satisfy the minimum requirements and intent of 327IAC 15-5 (Rule 5); deficiencies are noted in the checklist and in the comments section. Deficiencies constitute potential violation of the rule and mus~ be adequately addressed for compliance. The information necessaD, to satisfy the deficiencies must be submitted: . Please address revisions to the reviewer. Proper implementation of tha erosion and sediment control plan and inspections of thc construction site by the develope, r ar a representative are necessary to minimize off-site sedimentatiotz The developer should be aware that unfore~e, en construction activities and weather conditions may effect the performance ora practice or the erosion and sediment control pla~ The plan must be a fle. xible document, with provisions to modify or substitute practice~ as r~,zessary. Page 2 of~ ARE THE FOLLOWHRG ITEMS ADEQUATELY ADDRESSED ON T~U~; PLANS ? (AH Phms ]ff~f f. clude /q3propriafe Lvg~v~, S..I.% and North Arrow,) (~t,~z~ tha~ are.Not .,4pplb~able to ~ Project are dedgna~ed by Yes ~o [] 0 ~ 0 [] 0 PROJECT I1VFORM_ATION Project I_mmtion Map (Show profect in relatinn tO other areas of the Narrative Describing the Nature and l~xrpos~ of the Project Location of Planned and/or Exis6ng Roa. ds, Utilities, Struetures~ Highways, etc. Lot and/or Building Locations Laaduse of Adjacant Areas (Show the Entire Upstream HraterMted and Adfacent Areas Iqithin 500 Fe~t of thc Property IJnes) Yes No [] D 2C ~g O 2E [] D 2G ~ D 2H ~ [] 2I TOPOGRAPH/C, DRAINAGE, AND GENERAL SITE FEATURES Existing Vegetation ( Identify and Delineate ) Location and Name of Ail Wetlands, Lakes and WaterCourses On and Adjacent to the Site I00 Year Floodplains. Floodway Fringes. and Floodway$ (Notb if None) Soil~ Information ( lfhyddc soils are pre. rent. a is the re~txm~ibilio~ of the own~d~vdoper to investigate the ~xlstence of wetland* and to obtm'n perrnR~ from tht apprept~ate governmmt ageacie&) Existing and Planned Co~tour~ at an Inter~ai Appropriate to Indicate Drainage Patterns Locations of Specific Poln~ Where Stormwater Discharge Will Leave the Site Identify All Receiving Wate~ ( If Discharge i~ to a Separet¢ MunicipaI Storm &.wer. Identify the Name of the Munlclpal Operator and the Oltlmate Receiving ~ater) Potential Areas Where Storm water May Eater Groundwater (Note if None) Location of Stormwater Sy~em (Include Culverf~. Storm Sewer~. Chatmelso trad Swale~) Yes No O [] 3A ~] E) 3B LAND DISTURBING ACTIV1TIF~ Location and Appro~mate Dimensions of All Disturbed Areas [i.~. Cons~uct/on Limit~] (~reax Ptq~ere Vegetative Cover yrrill Be Prezer~ed Should be Clearly Designated) Soll S/ockpil~ and or Borrow Areas (ShowLocatians orl~ote ifNane) Yes No ffi [] 4A [] [] 4B O ~ 4C [] [] 4D ~l [] 4E ~] [] 4F O ~ 4G O ffi 4I O ~t/n 0 4J {~ 0 41{ EROSION AND SEDINIENT CONTROL MEASURES Sequence of When Each Measure Will Be Implemented (l~elative to Earth Di.rturbingAcgviti~) Monitoring and Ma/ntenance Guidelines for Each Measure Perimeter Sediment Control Measures (Lacatian. Constru?ion Detail. Dim~lons. and Specifications) Temporary Seeding (Specifications; Including Seed Mix. Fertilizer. Lime. and Mulch Pate*) Temporary Erosion and Sediment Control Measures (Location. Construction Detail. Dim~sions. and Specifieatians) Permanent Erosion and $ediment Control Men, res (Location. Conxtntction De~il. Dimensions. and Specificationx) Storm Drain Inlet Protection (Location. Constntction Detail. DimeJ~ions. and Specifications} Stormwater Outlet Protcetiou (Location. Consttntction Detail. Dimm$ian$. and $1~cifications) Stable Construction Entrance (Location. Con~tructian Detail. Dimension*. and Specifications) Erosion and Sediment Control on Individual Building Lots (Specifications) Permanent Seeding (Specifications: Including Seed Mix. Fertilizer. Lime. and Mulch Rat~) EROSION AND SEDIMENT CONTROL PLAN TECHNICAL REVIEW COMMENTS Project: Page 3 o£_~ Note: ,dH erosion and sediment control measures shown on th,,e plans and referenced in this review must meet the design criteria, sta, n, dards, and specifications outlined in the lndiana Handbook for Erasion Control in Developing Areas from the Indiana Department of Natural Resources, Division of $oil Conservation or similar Guidance Documents. Superintendent James F. Burre# Human R~sour~es ~t Sup~e~t ~ U~ March 8, 1999 Mr. Blair D. Carmosino, P.E. Duke Construction 8888 Keystone Crossing, Suite 1100 Indianapolis, IN 46240 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Carmosino: Carmel Clay Schools appreciates receiving the information for the TAC review meeting for Hamilton Crossing V. Upon review of the documents you submitted, please be advised that Carmel Clay Schools has no objections to this project. Sincerely, Samuel B. Robinson Director of Student Services SBR/jbk cc: Mr. Mark Monroe, DOCS Educational Sewices Cente~ · 5201 E. 131st Street * Carmel, IN 46033 · Telephone (317) 844-g~61 · FAX (311) 844-9965 March 1, 1999 Blair D. Carrnosino, P.E. Duke Construction 8888 Keystone C _r,:~__~ing, Suite 1100 Indianapolis, Indiana 46240 RE: Hamilton Crossing V Southwest comet of U.S. 31 and 131'~ Street Dear Blair:. This letter serves to acknowledge receipt of a transmittal containing the Hamilton Crossing V. Afber reviewing the Hamilton Crossing V, the Highv~y Department has determined that this project is located within the City of Carmel, therefore, no further comments apply. Ifyou have any cmnments or quesltons regarding this letterer proje=t, please feel free to contact me at any time. Thank you for your attenlton and cooperation. Sincerely, Engineering Te~hrtician Mark Monroe John South Steve Cash 1717 PLIgASANT STREET NOB LESVILLIg, INDIANA 46060 (31'/) T73-7770 Construction MEMORANDUM DATE: TO: FROM: RE: CC: February 24, 1999 CM~rk Mo~r~o~ - carm~plan~i~g~D~t.~ DreW-San-d~rs- - - Steve Granner Alan Hamersly Blair Carmosino HAMILTON CROSSING V TAC Submission/Distribution file Find attached copies of all transmittal letters for the TAC submission for the above referenced. Any questions please call me directly. Duke Construction 8888 Keystone Crossing, Suile 11 ~0 Indianapolis, IN 46240 317.808.6001 Fax: 317,808.6797 Construction February 24, 1999 Mr. Steve Cash Hamilton County Surveyors Office One Hamilton County Square Suite 146 Har~3ilton County Judicial Center Noblesville, IN 46060 Re: Hamilton Crossing V TAC Submittal Package Dear Steve: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review meeting, Wednesday, March 17 . Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Document5 Duke Construction 8888 geystc~e Crossing, Suite 1100 Indianapolis. IN 46240 317.808.6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. John South Hamilton County Boil and Water Conservation District 925 Division Street Noblesville, IN 46060 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. South: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review meeting, Wednesday, March 17 . Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC Mark Monroe, Carmel. Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Document]3 DukeConstruclJon 8888 KeystoneCrOSang, Surte 1100 Incr~nopolis, IN 46240 317.808.¢5001 Fax: 317.808.6797 Construction February 24, 1999 Mrs..Kate Boyle City Engineer Department of Engineering One Civic Center Carmel, IN 46032 Re: Hamilton Crossing V TAC Submittal Package Dear Ms. Boyle: Please find enclosed all information that was submitted to Carmel for review and app~roval. This information is scheduled for TAC review meeting, Wednesday, March 17"'. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Document20 Duke Construction 8888 Keystone Crossing, Suilo 1100 Indianap~. IN 45240 317.808,5001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Stan Puckett Office of Fire Chief Fire Station #1 Two Civic Square Carmel, IN 46032 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Puckett: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review meetin.g., Wednesday, March 17=. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Wooipert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Duke Const~uclion 8888 Keystone Cros,fing, Suite 11(~0 tndianapolis, IN 46240 317.808.6(]01 FOx: 317.808,6797 Construction February 24, 1999 Ms. Klm Theademan Carmel Communications 31 First Avenue NW Carmel, IN 46032 Rs: Hamilton Crossing V TAC Submittal Package Dear Ms. Theademan: Please find enclosed all information that was submitted to Carmel for review and apEroval. This information is scheduled for TAC review meeting, Wednesday, March 17~'. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Wcolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Document21 DukeConslruction 8888 Keystone Cros.~ng, Suitel100 Indlanop~is, IN46240 317.808.6001 Fax:317.808.6797 Construction February 24, 1999 Mr. Roger Harper Carmel/Clay Schools 5201 East 131a Street Carmel, IN 46033 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Harper: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review, meeting, Wednesday, March 17'". Should you have any questions or require further ~nformation I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Docunlent7 Duke Construciton 8888 Keystone Crossing, Suite 1100 Indionopolis, IN 46240 317,808.6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Michael Fogarty Office of Police Chief Three Civic Square Carmel, IN 46032 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Fogarty: Please find enclosed all information that was submitted to Carmel for review and aPl~roval. This information is scheduled for TAC review meeting, Wednesday, March 17'". Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Documentl4 Duke Construction 8888 Keystone Crossing. Suite 1100 IrlclJcIr~por. ls. IN 46:~40 317.808.6OO1 Fax: 317.808.6797 Construction February 24, 1999 Mr. Paul Arnone Carmel Utilities 130 First Avenue SW Carmel, IN 46032 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Arnone: Please find enclosed all information that was submitted to Carmel for review and app~roval. This information is sch.,eduled for TAC review meeting, Wednesday, March 17'". Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Grenner, Bose McKinney and Evans Drew Sanders file Document22 DukeConstrucfion 8888 Keystone Cro,~ing. Suite 1100 Indianapolis, IN 46240 317,808.6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Brian Houghton Jones & Henry 2420 N. Coliseum Blvd. Suite 214 Fort Wayne, IN 46805 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Houghton: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review meeting, Wednesday, March 17'". Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Documcnt8 Duke Conslructlon 8888 Keystone Cross.g, Suite 1100 Indianapolis. IN 46240 317.808.6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Joe Cook Hamilton County Sheriff Dept. 18100 Cumberland Road Noblesville, IN 46060 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Cook: Please find enclosed all information that was submitted to Carmel for review and apl~rovaL This information is scheduled for TAC review meeting, Wednesday, Mamh 17"'. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Documentl5 DukeConslruclion 8888 Ke',/stoneCi'o~ing, Suite 1100 Indlanap~is, IN 46240 317.808.6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Mark McCulloch Hamilton County Engineer/ Hamilton County Highway 1717 East Pleasant Street Noblesville, IN 46060 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. McCulloch: Please find enclosed all information that was submitted to Carmel for review and app~roval. This information is scheduled for TAC review meeting, Wednesday, March 17=. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. ,rely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Document27 Duke ConslTuclion 8888 Keystone Cros.fing, Sure 1100 Indianapolis, IN 46240 317,808,6001 Fax: 317,808.6797 Construction February 24, 1999 Mr. Jay W. Alley Clay Township Regional Waste District P.O. Box 46038 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Alley: Please find enclosed all information that was submitted to Carmel for review and app~roval. This information is scheduled for TAC review meeting, Wednesday, March 17"'. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Document9 Duke Construction 8888 Keystone Crossing, Suite 1100 Indianapolis. IN 46240 317.808.6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Barry McNulty Hamilton County Health Department Hamilton County Judicial Center Suite 30 Noblesville, In 46060-2229 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. McNulty: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review meeting, Wednesday, March 17th. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroel Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Documentl6 Duke Conslrucliofl 8888 Keystone Crossing. Suite 1100 Indianapolis, IN 46240 317.808.~001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Randy Auler Carmel/Clay Parks Department 1055 Third Avenue SW Carmel, IN 46032 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Auler: Please find enclosed all information that was submitted to Carmel for review and app~roval. This information is scheduled for TAC review meeting, Wednesday, March 17m. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Document23 DukeConstruciton 8888 KevstoneCrossing. Suite 11[~1 Indianapolis. IN 46240 317,808,6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Larry Castetter PSI 1441 South Guilford Carmel, IN 46032 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Castetter: Please find enclosed all information that was submitted to Carmel for review and apl~roval. This information is scheduled for TAC review meeting, Wednesday, March 17"~. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. S~incerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file DocumentlO Duke Construction 8888 Keystone Cro.~ng, .Suite 1100 Indianapolis, IN 46240 317.808.6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Jerry Robinson Indiana Gas Co. P.O. Box 1700 Noblesville, IN 46060 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Robinson: Please find enclosed all information that was submitted to Carmel for review and app~roval. This information is scheduled for TAC review meeting, Wednesday, March 17% Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Documentl7 DukeConstrucl~on 8888 Keystone Cros~ng, Suitel100 Indianapor~s. IN46240 317.808.6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Jeff Autry Indiana Gas Company 550 West County Road 125 South Lebanon, IN 469052 Re; Hamilton Crossing V TAC Submittal Package Dear Mr. Autry: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review meeting, Wednesday, March 17th. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Document24 DukeConstruclion 8888 Keystone Crossing, Suile1100 Inclianapofls. IN46240 317,808.6001 Fax:317.808.6797 Construction February 24, 1999 Mr. Eric Mason Ameritech 5858 N. College Avenue Indianapolis, IN 46220 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Mason: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review meeting, Wednesday, March 17th. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Documentl 1 DukeConstrucfion 8888 KeystoneCros,~ng, Suite 1100 Indianapolis, IN 46240 317.808.6001 Fax: 317.808.6797 Construction February 24, 1999 Ms. Pam Waggoner Indianapolis Water Company PO Box 1220 Indianapolis, IN 46206 Re: Hamilton Crossing V TAC Submittal Package Dear Ms. Waggoner: Please find enclosed all information that was submitted to Carmel for review and approval. This information is sch..eduled for TAC review meeting, Wednesday, March 17th. Should you have any quest,ons or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Documcntl8 Duke Construction 8888 KeystoneCro~ng. Suite 1100 Indianapolis. IN 46240 317.808,6001 Fox: 317.808.6797 Construction February 24, 1999 Mr. Kevin Walker Indianapolis Power and Ught Company 3600 N. Arlington Avenue Indianapolis, IN 46218 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Walker: Please find enclosed all information that was submitted to Carmel for review and app~roval. This information is scheduled for TAC review meeting, Wednesday, March 17u'. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC: Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Document25 Duke Construction 8888 Keystone Cros~ng, Suite 11(]0 Indianapolis, IN 46240 317.808.6001 Fax: 317.808.6797 Construction February 24, 1999 Ms. Sharon Prater Panhandle Eastern Pipeline Co. PO Box 38 Zionsville, IN 46077 Re: Hamilton Crossing V TAC Submittal Package Dear Ms. Prater: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review meeting, Wednesday, March 17th. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Blair D. Carmosino, P.E. Development Services Manager BDC Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Documentl2 Duke Construction 8888 Keystone Crossing. Suite 1100 Indianapolis, IN 46240 317.808.6001 Fax: 317.808.6797 Construction February 24, 1999 Mr. Robert Hendericks Hamilton County Local Emergency Planning Committee 18100 Cumberland Road Noblesville, IN 46060 Re: Hamilton Crossing V TAC Submittal Package Dear Mr. Hendericks: Please find enclosed all information that was submitted to Carmel for review and approval. This information is scheduled for TAC review meeting, Wednesday, March 17~h. Should you have any questions or require further information I can be contacted directly at 317-808-6179. Thank you. Sincerely, Blair D. Carmosino, P.E. Development Services Manager BDC CC, Mark Monroe, Carmel Planning Jim Tully, Woolpert LLP Steve Granner, Bose McKinney and Evans Drew Sanders file Doeumentl9 Duke Construciion 8888 Keystone Crossing. Suite 1100 Indianapolis, IN 46240 317.808.~101 Fax: 317.808.6797 Memo Tm Mark Monme Fmm~ Melissa Spiker C(~ February 21, 1999 Hamilton Crossing Building 5 The following am comments/suggestions to the above landscape plan. 1. Suggest the use of wildlife plantings similar to Buildings 3 and 4. · Page 1