Loading...
205421 01/17/2012 CITY OF CARMEL, INDIANA VENDOR: 358944 Page 1 of 1 ONE CIVIC SQUARE CENTRAL ENGINEERING CONSTRUCT RY CARMEL, INDIANA 46032 3862 N COMMERCIAL PARKWAY CF�CK AMOUNT: $22,734.32 i� GREENFIELD IN 46140 CHECK NUMBER: 205421 CHECK DATE: 1/17/2012 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 206 R4462300 27453 11 22,734.32 106TH /HAVERSTICK REPL CONSTRUCTION PROJECT INVOICE DATE: January 6, 2012 COMPANY NAME: Central Engineering Construction AND ADDRESS 3862 North Commercial Parkway Greenfield, Indiana 46140 TELEPHONE NO.: (317)- 894 -1990 FAX NO.: (317)- 894 -1890 PROJECT NAME: 106 Street Drainage Improvements PROJECT NO.: 10 -06 INVOICE NO.: 11 Construction pay items as per Progress Pay Estimates No. 11 as shown on the attached invoice for work completed between the dates of December 1, 2011 to December 31, 2011. TOTAL PAY THIS ESTIMATE: $25,260.35 MINUS 10% RETAINAGE: $2,526.03 TOTAL NOW DUE: $22,734.32 Submitted by CrossRoad Engineers, PC 7,4 3��& I /,o ZDIZ- Project R esentativ signed name bate Lance Stahley Project Representative printed name 1 of 2 CITY OF CARMEL 106th Street and Haverstick Rd Drainage Improvements and Culvert Replacement PROJECT NO. 10-06 PROGRESS PAY ESTIMATE NO. 11 For work done during the period of: 12/11/11 through 12/31111 n Item Descnption d. 'n g ot a �y th ay IT Tj ,No: E stimate mate 1 Mobilization Demobilization LS 1.00 LS $30,680.00 $30,680.00 2 Maintenance of Traffic 0.10 LS 0.85 LS $5,000.00 $500.00 $4,250.00 3 Clearing Right of Way LS 1.00 LS $38,000.00 $38,000.00 P5 4 ISanity ry Lateral, Replace (Undistributed) LFT 8.00 LFT $120.00 $960.00 IGuardrail, Remove and Replace LS 0.50 LS $2,900.00 $1,450.00 6 Linear Ditch Grading LFT 573.00 LFT $4.00 $2,292.00 7 Manhole, Type C EA 1.00 EA $1,610.00 $1,615 8 Manhole, Type J I EA 4.00 EA $5,800.00 $23,200.00 9 9 Manhole, Type K E 2.00 EA $3.800.00 $7,600.00 11 0 0 Manhole, Type M EA 1.00 EA $6,500.00 $6,500.001 11 12" RCP LFT 94.00 LFT $49.00 $4,606.00 12 15" RCP LFT 31.00 LFT $52.00 $1,612.00 13 18" RCP LFT 5.00 LFT $67.00 $335.00 14 18" HIDPE LFT 6.00 LFT $64.00 $384.00 15 30" RCP LFT 389.00 LFT $98.00 $38,122.00 16 43" x 68" Elliptical RCP LFT 78.00 LFT $210.00 $16,380.00 17 29" x 45" Elliptical RCP LFT 211.80 LFT $138,00 $29,228.40 18 Reinforced Concrete Box 4'X 14' LFT 100.00 LFT $850,00 $85,000.00 19 Reinforced Concrete Box 4'X 13' LFT 121.00 LFT $820.00 $99,220.00 20 Reinforced Concrete Box 4'X 11' LFT 71.00 LFT $645.00 $45,795.00 21 Reinforced Concrete Box 4' X 10' LFT 36.00 LFT $600.00 $21,600.00 22 Reinforced Concrete Box 4'X 8' LFT 104.00 LFT s460.00 $47,840,00 23 Mechanically Core Structure EA 4.00 EA $1,500.00 $6,000.00 24 Reinforced Concrete Headwall 0.09 LS 0.75 LS $60,000.00 $5,400.00 $45,000.00 25 Handrail 76.25 LFT 140.25 LFT $140.00 $10,675.00 $19,635.00 26 Flowable Fill CYS 370.00 CYS $69.00 $25,530.00 27 Rip Rap, Class 2 78.85 TON 336.53 TON $25.00 $1,971.25 $8,413.25 28 Geotextiles 94.00 SYS 393.01 SYS $1.25 $117.60 $491.26 29 HMA Surface, 9.5 mm TON TON $220.00 30 HMA Intermediate, 19.0 mm TON TON $600.00 31 PCCP, 12 IN. SYS 402.43. SYS $41.00 $16,499.63 32 PCCP for Driveways, 6 IN. SYS 28.26 SYS $28.00 $791.28 33 Compacted A g. No. 53, Base TON TON $56.00 34 Concrete, Roll Curb 107.00 LFT 133.30 LFT $22.00 $2,364.00 $2,932.60 35 Concrete Sidewalk, 4 IN. 12.00 SYS 120.70 SYS $18.00 $216.00 $2,172.60 36 Nurse Sodding SYS SYS $5.00 37 Erosion Control Measures 0.20 LS 0.80 LS $5,541.00 $1,108.20 $4,432.80 38 Topsoil (Undistributed) SYS SYS $0.50 39 Topsoil (Undistributed) CYS 90.00 CYS $20.00 $1,800.00 40 Temporary Pumparound 0.24 LS 0.70 LS $12,160.00 $2,918.40 $8,512.00 41 Road Closure Sign Assembly EA 6.00 EA $470.00 $2,820.00 42 IDetour Route Marker Assembly EA EA $250.00 43 IConstruction Sign, A EA 7.00 EA $250.00 $1,750.00 44 Barricade, III-B LFT 172.00 LFT $25.00 $4,300.00 *45 Field Order #2 LS 1.00 LS $5,188.34 $5,188.34 *46 Hydro Excavating LS 1.00 LS $15,176.19 $15,176.19 *47 Undercut LS 1.00 LS $4,568.85 $4,568.85 *48 Mulched Seeding SYS 2881.68 SYS $1.84 $5,302.29 *49 Additional Mobilizations EA 1.00 EA $3,366.37 $3,366.37 *50 Sanitary Relocate/Repair Structure 12 LS 1.00 LS $2,414.18 $2,414.18 *51 Field Engineered Culvert depth/relay costs LS 1.00 LS $1,826.53 $1,826.53 $25,260.35 $695,587.57 2 of 2 CITY OF CARMEL 106th Street and Haverstick Rd Drainage Improvements and Culvert Replacement PROJECT NO. 10-06 PROGRESS PAY ESTIMATE NO. 11 For work done during the period of: 1211111 through 12131111 Total Tolal: Pay Eetirriate Price: this Estimate to Dale TOTALS AND PAY ESTIMATE CALCULATIONS TOTAL PAY THIS ESTIMATE $25,260.35 TOTAL PAY TO DATE $695,587.57 DEDUCT 1 RETAINAGE $69,558,76 DEDUCT PREVIOUS NET PAY ESTIMATES $603,294.50 NET PAY ESTIMATE NO. 11 $22,734.32 CrossRoad Engineers, _PC zz:::��- /4 /mia— Inspecting Firm Dat6 Central Engineering Construction G I Z-ol Contractor By Date Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No. 201 (Rev. 1995) CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee Central Engineering Purchase Order No. 3862 North Commercial Parkway Terms Greenfield, Indiana 46140 Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) t. Drainage Improvements (10-06) $22,734.32 Total I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5- 11- 10 -1.6. 20 Clerk- Treasurer VOUCHER NO. WARRANT NO. ALLOWED 20 Central Engineering IN SUM OF 3862 N Commercial Parkway Greenfield, Indiana 46140 $22,734.32 ON ACCOUNT OF APPROPRIATION FOR Department of Engineering Board Members Po# or INVOICE NO. ACCT #!TITLE AMOUNT DEPT. I hereby certify that the attached invoice(s), or bill(s) is (are) true and correct and that the materials or services itemized thereon for 27453 11 206- R4462300 $22,734.32 which charge is made were ordered and received except 20 Signature Title Cost distribution ledger classification if claim paid motor vehicle highway fund